Supply of 24960 Taflon Tape As Per Is 14635 Q3
Manufacturing & Supply Of Newly Developed Improved Switch Expansion Joints For 2 Degree To 4 D Egree Curve For 60 Kg Uic Rail Section For Long Welded Rail On Psc Sleepers Along With All Parts As Per Drawing Excluding Ercs, Liners & Rubber Pads. 60 Kg Improved Switch Expansion Joint To Rdso Drg. No. T-8926 For 2 Degree To 4 Degree Curve As Per Bina Make Drg. No. Bmw/D-351 Rev-B With 65 Mm Max. Gap. The Alteratio N In Drawing And Specification Issued By Rdso Up To 21 Days Prior To Tender Closing Date Shall Be Applicable. W Arranty Period: 30 Months After The Date Of Delivery
Shifting Of 33 Kv Line Connected With 33/11 Kv S/S Dhamora Feeder Site At Premises Of Shri Govind Agrawal S.O Sri Ramautar Agrawal Milak, Rampur Under Jurisdiction Of Edd-Milak
Construction Of Damage Boundary Wall And Other Misc Civil Works At Various 3311 Kv Substation Under Edd1 Distt
Construction Of Damage Boundary Wall And Other Misc Civil Works At Various 3311 Kv Substation Under Eddbilaspur Distt
Construction Of Damage Boundary Wall And Other Civil Works At 3311 Kv Substation Maswasi Distt
Construction Of Damage Boundary Wall And Other Misc Civil Works At Various 3311 Kv Substation Under Eddmilak And Eddii Dist
Construction Of Test Lab Building And Other Civil Works At Electricity Test Lab Third Milak Distt
Construction Of Damage Boundary Wall And Other Misc Civil Works At Various 3311 Kv Sub-Station Under Eddii Distt
Construction Of Damage Boundary Wall And Other Civil Works At 3311 Kv Substation Shahabad Gate Rampur Distt