Sitc Of Vhf Fm Walkie Talkies And Base Station At Madurai Airport, 91 Walkie Talkie Handset Walkie Talkie Handset Battery Walkie Talkie Handset Helical Antenna Desktop Mountable Walkie Talkie Base Station. Vehicle Mountable Walkie Talkie Base Station. Hands Free Kits For Walkie Talkie Handsets Installation Programming And Testing Charges
Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply Ips Sys Tem As Per Rdso Spec. No.Rdso/Spn/165/2012 Ver.-3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 Alo Ng With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017 /0002-10 For Ibs With Lc Gate .This Includes Transporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 3 0 Months After The Date Of Delivery Supply, Installation, Testing And Commissoning Of Smps Based Integrated Power Supply Ipssys Tem As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver 3.0 Aiong With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells Cellsas Per Rdso Spece.Irs:S-88/2004 Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing No. Typ/2017/0002-11 For Relay Hu T /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation To Consignee Depot, From Consignee Dep Ot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filling Precommissioning C Heck List Jointly By Rdso Approved Vendor And Railway Representative.Item Shall Be Procured Though Store Wi Th Gst, Frieght And Commissioning Charges.This Includes Transporation To Consignee Depot, From C Onsignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply And Comissioning Of Smps Based Integrated Power Supply System For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 Ver. 4. 0 Amdt.1 As Per Drawing Attached Of Along With Battery Set Of 110V/300Ah.This Includes Tr Ansporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Del Ivery Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply Ips Syst Em, As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 A Long With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawing No. Typ/2017/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transportation To Consignee Depot From Consi Gnee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filing Pre Commi Ssioning Check List Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To C Onsignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply System I Ps , As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitori Ng Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cell As Per Rdso Spec. Irs-S-88/2004 Al Ong With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate.This Include Transporation To Consignee Depot To Site, Installatio N And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To Consignee Depot, From Consig Nee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery
Repair Of Tata Lpt , Front Shock Observer, Front Wheel Bearing, Rear Shock Observer, Rear Wheel Bearing, Break Liner, Wheel Balancing, Liner, Nuts And Bolts, Wheel Bearing Inner, Wheel Bearing Outer, Chamber Packing, Greasing, Wheel Fendor Right, Wheel Fendor Left, Labour Charges For Above Work, Srearing Bushes, Stearing Bearing, Power Stearing Oil, Lathe Work For Fixing, Stearing Liner, Spokes, Head Light Assay, Tail Light Assay, Worn Out Wire, Indicator Lamp, Air Filter, Oil Filter, Rubber Kit, Gear Level Kit, Engine Oil 20W40, Gear Oil, Coolant, Spring Bushes, Break Shoe, Governor Kit, Nozzle Kit, Dove Bush, Mechnical System Of Door Glass Lifting, Battery Cells, Battery Terminals, Battery Leads, Recharging Of Battery Including Refilling Of Electrolyte Solution Having Required Specific Gravity, M And L For Patch Repair Of Body By Denting And Making Good Of Broken And Teared Body Surfaces Including Painting Same Colour Of The Vehicle, Cleaning And Washing Of Vehicle By Pressure Pump And Polishing Of Vehicle
Repair Of Hero Deluxe, Front Shock Observer, Front Wheel Bearing, Rear Shock Observer, Rear Wheel Bearing, Break Liner, Wheel Balancing, Labour Charges For Above Work, Clutch Packing, Clutch Oil, Gear Packing, Clutch Wire, Throttle Wire, Break Shoes, Break Wire, Tappet Cover Packing, Spark Plug, Ignition Coil, Engine Oil 5W10, Oil Filter Kit, Dismantling And Taking Out Complete Carburator Assembly And Replacing, Front Light Assay, Tail Light Assay, Seat Cover, Mud Flap, Side Mirror, Air Filter, Indicator Lamp, Electric Wiring, Battery Cells, Battery Terminals, Battery Leads, Recharging Of Battery Including Refilling Of Electrolyte, M And L For Patch Repair Of Body By Denting And Making Good Of Broken And Teared Body Surfaces Including Painting Of Repair Portion With The Same Colour Of The Vehicle, After Completion Of Above Repair And Replacement Of Parts Cleaning And Washing
Supply of 10 M9222488230 100238299 Battery Rech Ni- Cd 400V 250Ah Q3 Item 20 M9222488230 100238299 Replacement & Commissioning Charges400v Q3
Supply of Biometric Attendance Machine Face Reader Cum Finger Scanner With Metal Box Warranty Per Iod: 36 Months After The Date Of Delivery 3.7 V Li-Ion 18650 Battery 4 Nos. For Each Machine Warranty Period: 36 Months After The Date Of Delivery Installation Charges Warranty Period: 36 Months After The Date Of Delivery
Supply Of Cctv Camera For Campus Security - Ptz Camera, Professional Poe Bullet Camera, Camera Holder, Mounting Bracket, Splitter 1 Ratio 2, Led Tv 32 Inch, Led Tv 55 Inch, Led Tv 85 Inch, Nvr 16 Channel With Hard Disk 8 Tb., Nvr 32 Channel, Switch 8 Port Giga Lan For Control Room, 6 Port Solar Poe Switch, 42 Ah Lithium-Ion Battery With Charger For Camera Power Supply., Media Converter Fibre Switch, Optical Line Terminal 4 Port, Pon Module, Circuit Breaker, 6U Rack For Control Room, Inverter 2 Kva With Battery Bank, Stabilizer 3 Kva, Electric Extension Board 4 Socket, Electric Extension Board 6 Or 8 Socket, Ofc Cable 4 Core Armoured, Cat-6 Cable, Cat-6 Patch Cable 3 Mtr With Rj 45 Connector, Power Cable, Optical Fibre Patch Cord, Hdmi Cables 5 Mtr For Monitor, Gi Pole 20 Feet 65 Mm With Rcc Base, Ip 66 Junction Box With Pole Mount, Chemical Earthing For Control Room, Ofc Joint Box, Tie For Winding, Rj 45 Connector, Ofc Sleeves, Splicer Machine, Otdr With Optics Tool Kit, Installation Testing Commissioning Charges At The Rate Twelve Percent Of Cameras Value, Camc
Gujarat Custom Bid For Services - Charges For Battery Limit Assessment Custom Bid For Services - Charges For Peso Certification Approval
Supply Of Ceiling Fan Model Havells Thrill Air Es, Cpplus 16 Channel Nvr, Capplus 16 Channel Nvr 2 Sata, Surveillance 4 Tb Harddishk, Pose Switch 8 Port, Digisol Cat 6 Cable Copper 305 Mtr, Connector, Pvc Box, Dvr Rack 4 U Heavy Duty With Electric Board, Capplus 2 Mp Ip Network Bullet, Cpplus 2 Mp Ip Network Dome Camera, Giga 8 Port Newworking Switch, 2 Core Electric Wire, Pvc Poe Box, Installation, 55 Inches Led Tv Lg Model Lg Ur 7500, 5 Kva/48 V Mppt Pcu, Luminous, Solar Battery 150 A 72 Months Warranty Luminous, Solar Panel 550 W144 C Half Cut Luminous, Installation Charges Including Hdgi Channel 6Sqmm Dc Wire Ajb And Other Bos Materils Wire Dcmicrotek, Array Junction Box Acdb Ac Distribution Box Hot Dip Galvanized Iron
Procurement And Installation Of Automatic Modular Extinguishers, 61 Modular 10 Kg Capacity Filled With Clean Agent Gas Hfc 227 Fitted With Temprature Colour Bulb Discharge Valve Ce En Approved Presure Indicating Guage Celling Mounted Clean Agent 15 Kg Hfc 227 Fitted With Ilp Valve With Solenoid Ce En Approved Pressure Indicating Guage Celling Mounted Barket Duly Charged And Pressurzed With Nitrogeen Gas Conv Heat Smoke Detector Conv Mannual Relese Switch Conv Mannual Abort Switch 2 Zone Conventional Signal Area Gas Relese Panel With Battery Relay And Smps Conv Hooter Cum Flasher Supply Of Pvc Insulated Pvc Sheathed Frls Copper Armoured Aluminium Conductor Of Cable As Per Is 1554 Installation Charge Option 1 Plus 2 Freight Charges Option 1 Plus 2
Supply Of Demonstration And Training, 2 Wheeler Simulator With Complete Working Model And Data Extraction, 4-Wheeler Model Ev Training System With Test Rig With Advanced Controller Feature And Iot And Embedded System, 4- Wheeler Electric Buggy Simulator With Complete Working And Ev Training Facility With Display Board, 3-Wheeler Ev Chassis Simulator With Complete Working Model And Data Extraction, 15 Ah, 48 Volt Li-Ion Phosphate Battery Pack Compatible With The 2 Wheeler, 4 Wheeler Test Rig, Smps Charger, Battery Manufacturing Raw Material With 2 Set Of Cells, Packing Material, Spot Welding- Telescopic Rocker Arm High Power Spot Welding Machine 73La 70Bn 3.6Kw, Battery Pack Testing Machine With Charging And Dischanging System, Bldc Cut Section With Description And Lnformation Charges 1000-Watt, Hub Motor Cut Section, Controller Cut Section With Description And Lnformation Charges, Bms Cut Section, Dc-Dc Converter Cut Section, Ev Battery Charger Cut Section, Instrumentation Cluster Cut Section, Ev Differential, False Celling 2X2 Grid- Asbestos Sheets, Waterproof
Supply of X-Ray Parcel Scanner. Procurement Of X-Ray Parcel Scanner At Cbe & Ed Duly Compiling The Sp Ecification Attached. With All Standard Accessories I.E., I Control Desk Ii Motorised Input & Output Conveyor Each Side Iii 2 Nos Of Monitors Iv 5 Kva Voltage Stabilizer V 5Kva Ups With One Hour Battery Back Up With Installatio N And Etc., Warranty Period : 24 Month S From The Date Of Installation. Unloading Of Materials At Required Site And Training To The User By Supplier. Please Refer To All The Documents Attached In This Tender Warranty Period: 24 Months After The Date Of Delivery Comprehensive Annual Maintenance Contract Charges For 5 Years After Expiry Of Free Warranty Period Of 2 Years. . Firm To Quote Separately I.E. Year 1 Tab For 3Rd Year, Year 2 Tab For 4Th Year, Year 3 Tab For 5Thyear, Year 4 Tab For 6Th Year, Year 5 Tab For 7Thyear. Firm Should Quote The Actual Rate Of The Camc In The Bid. Di Scounted Rate As Per Npv Will Be Generated By The Ireps System For Ranking Purpose. Warranty Period: - 2 Years, Camc Period :- 5 Years . Rate Of Discounting :-10% Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 %