Supply And Installation Of Cattle Feed Plant Boiler Chimney At Bandol District Under Jabalpur Sahakari Dugdh Sangh
Supply, Erection And Commissioning Of Boiler Chimney
Supply Of Boiler Refractory Material -White Heat – K Cement Make –Ace Bag Cap. 25 Kg Each, Fire Clay Bag Cap. 40 Kg Each, Fire Cement Accoset – 50 Make Ace Bag Cap. 50 Kg Each, Black Heat Castable Cement Make Ace Bag Cap. 50 Kg Each, Fire Bricks Of Size 9”X 4 ½” X 3”, Taper Fire Bricks Size 9” X 4 ½ X 3” X 2” , Insulation Bricks Of Size 9”X 4 ½” X 3”, Asbestos/ Insulation Block Of Boiler Sides Of Size 2’ X 2’ X 3”, Asbestos/ Insulation Block Of Boiler Sides Of Size 2’ X 2’ X 2”, Asbestos/ Insulation Block Of Boiler Sides Of Size 3’ X 2’ X 2”, Tile Clamp L.H.S As Per Drg No. Sm14-961-4, Tile Clamp Superheater Coils As Per Drg No. 300007-74, Chimney Bricks As Per Drg Sm20-012-04, Boiler Tile As Par Drg.No. 300007-60, Boiler Tile As Par Drg.No.300007-69, Curved Tiles As Per Drg. No. 300007-64, Curved Tiles As Per Drg. No. 300008-64
Supply, Installation And Commissioning Of 1000 Kg. Per Hour Capacity Coal/Agricultural Waste Hus K Briquettes Fired Steam Boiler With Necessary Mounting And Fittings Except Ms Chimney Etc. At Concrete Sleepe R Plant, North Western Railway - Jaipur Division Including All Related Civil Works, Supervision Charges, Transportati On Charges, Taxes, Octroi, Gst, Loading, Unloading, Erection And Commissioning Of The Boiler, Hydraulic Test, Ibr Certification And Other Ancillary Work Related For The Successful Commissioning Of Boiler As A Complete Job, As Per Attached Specification And Special Conditions . Make - Thermax Or Equivalent . Warranty Period: 30 Months After The Date Of Delivery
Manufacturing, Supply, Installation And Commissioning Of One No.1500 Kg. Per Hour Capacity Coal/A Gricultural Waste Husk Briquettes Fired Steam Boiler With Necessary Mounting And Fittings, Ms Chimney Etc. At C Oncrete Sleeper Plant, North Western Railway - Jaipur Division Including All Related Civil Works, Supervision Charg Es, Transportation Charges, Taxes, Octroi, Gst, Loading, Unloading, Erection And Commissioning Of The Boiler, Hydr Aulic Test, Ibr Certification And Other Ancillary Work Related For The Successful Commissioning Of Boiler As A Compl Ete Job, As Per Specification And Special Conditions Given Below Make - Thermax Model- Cb15sg, Jaya S Arv-O -Steam Boiler Model Njs-Sm-Wb-7-150 Or Equivalent . Warranty Period: 30 Months After The D Ate Of Delivery