Design, Engineering, Manufacture, Shop Testing, Appointing And Arranging For Inspection By Tpia, Packing, Forwarding And Supply Of Hv And Lv Power Factor Improvement Capacitor Banks On For Basis To Nalco, Damanjodi, Along With All Fittings, Accessori
Construction Of 1 No.33 Kv Feeder Bay For 2Nd Source To The 33/11 Kv Road No.22 Tsspdcl Substation Feeding To Mcr Hrd Institute By Utilizing 33 Kv Capacitor Bank-Iii Bay From 132/33 Kv Erragadda Ss.
Supply of Capacitor Bank For Lhb Eog Type Power Car As Per Specification No. Edml130, Re V-1, Corr 1 To 6, Type-Ii. Packing Instruction - Spi146. Warranty Period: 30 Months After The Date Of Delivery
Comprehensive Annual Maintenance Contract For Air Circuit Breakers, Vacuum Circuit Breakers, Capacitor Banks 31 Nos..
Supply of 2 1725 Kvar 3-Phase 3200 Vrms Structure Mounted Capacitor Bank Q3 210Kvar 3-Phase 800 Vrms Structure Mounted Capacitor Bank Q3
Estimate For Replacement Burnt Defective Of 11 Kv 03 Core 120 Sqmm Underground Xlpe Cable And Jointing Kit Of 1500 Kvar Capacitor Bank At Ss 33/11 Kv Sirnota Under Tyonda Dc
Supply & Installation Of 33 Kv Relay And Maintenance Of Capacitor Bank, Installation Of Various Sites Under Bussiness Plan-2024-25 In The Area Of Edd-Ii
Supply of 3 Kvar Metalized Polypropylene Gas Filled Wavycut 3 Phase Self Healing Type Capacitors Rated At 4 80V, 50 Hz Capacitor Should Have Discharge Resistor And Over Pressure Disconnection As Per Rdso Modification Sheet No. Rdso/Pe/Ms/0054-2011 Rev-0 Or Latest And Confirming To Is: 13340 Suitable For Capacitor Bank Lhb Ac Coach. Spec: Rdso Modification Sheet No. Rdso/Pe/Ms/0054-2011 Rev-0 Or Latest And Confirming To Is: 1 3340. Make And Model Should Be Mis Epcos And Mis Vishay Or Any Other Equivalent Capacitor Confirming To Is: 13340. Warranty Period: 30 Months After The Date Of Delivery
Construction Of 01 No. 2X5 Mva Additional Capacitor Bank, Shifting Of Existing 2X5 Mvar Capacitor Bank And Extension Of 33 Kv Main Bus At 132 Kv Sub Station Jagdishpur
Supply Of 33Kv Ht Panels, Lt Breakers, Distribution Transformers And Capacitor Banks Along With Control Panel Q3