Metalizing Of Cross Girders In The Floor System Of Br No. 248A Rail-Cum-Road Bridge And Sectional Bridges 8Dn, 102Dn, 248/C& 248/E In Sse/Br- Ii/Rjy Section And Br.No.544 Dn At Km. 682/18-30 Between Tuni-Glu Stations And Br.No.703 Up At Km.744/17-29 Between Bvm-Akp Stations And Sectional Bridges Br.Nos. 615 Up& Dn, 510 Up& Dn, 470 Up& Dn, 460 Up& Dn And 452 Up& Dn
Replacement Of Top Flange Plate Of Girder, Cross Frame At Br. No. 222A 2X12.2M On Mb- Gzb Section & Strengthening Of Rail & Cross Girder, Providing Screen Over Web Of Corss Girder On Br. No. 36 Up 3X30.5M & 36 Dn 4X30.5M On Gzb-Sre Section
Dismantling Of Left-Over Trough Girder/Angle Fitted On Cross Girder Of Important & Major Bridge No. 5A Up Line, 63 Dn Line, 65 Up & Dn Line On Snl-Att Section, Fzr Div.
Construction Of Railway Portion Of Two Lane Road Over Bridge 1 X 56.80 M- Skew Composite Girder With Non-Standard Rdso Approved Superstructure At Km. 210/14-16 In Lieu Of Level Crossing No. 107 In Ujjain - Bhopal Section, Between Pachanwan And Phanda Stations
Construction Of Bridge No. 263-A At Ch-149975 Under Gail Gas Pipe Line & Road Over Bridge -15 By Construction Of Rcc Box 8.00 X 8.00 M In Size Pre-Cast Segmental With Air Pushing Method/Cast-In-Situ And Construction Of Bridge No. 258-A Composite Girder Viaduct Span 14 X 30.50 M Over Bina Refinery Crude Oil Pipe Line For Crossing Of New Rail Line Alignment At Ch- 148360 Between Rajgarh-Narsinghpura Stations In The State Of Madhya Pradesh In Connection Ramganjmandi-Bhopal New Bg Rail Line Project
Balance Work Against Work For Replacement Of Corroded Top Flange Plate, Corroded Head Loss Rivets Of Bridge No. 156 Up, 378 Dn, Replacement Of Corroded Rivets Of Br. No. 378 Up, Replacement Of Cracked Intermediate Cross Frame Stiffeners And Provision Of Additional Cross Frames In Girders Of Br. No. 447 12X12.2 Mg And Provision Of Inspection Ladders In Several Bridges
Jeypore -Malkangiri New Railway Line Project: Construction Of New Bg Railway Line Between Jeypore 0.85 Km From Csb To 41.5 Km Involving Earthwork In Formation In Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges, Road Over Bridges Robs, Road Under Bridges Rubs, Protection Works, P.Way Track Works With Contractors Own Material Supplies Including Supply Of Track Ballast, New Wide Based Psc Sleepers, Special Psc Sleepers For Turnouts, Improvised Sejs, Guard Rails Etc, Points Thick Web Switches & Wcms Crossings, Glued Joints, H- Beam/Composite Sleepers Over Girder Bridges, Improvised Sejs, All P-Way Fittings, Ohe Foundations, Supply And Erection Of Ohe Masts, Modification/Conversion To Underground For Overhead Electrical Ht/Lt Power Line Crossings, Construction Of Platforms, Station Buildings, Service Building, Sp/Ssp Buildings And Residential Buildings, Water Supply, Indoor And Outdoor Electrification Etc On Epc Basis