Supply of Industrial Safety Apron For Women Workers Ladies Staff Suitable For Protection From Dust, Oil, Grea Se, Kerosene While Working With Detailed Specifications & Size As Per Annexure Attached. The Material Must Have Warranty Of At-Least 12 Months. Material To Be Procured From Oem Or Its Authorized Dealer/ Distributer Only. Sam Ple Must Be Approved First Before Bulk Supply. Lab Test Report Must Have Been Obtained From Govt. Approved, N Abl Labs Only. Warranty & Test Certificate Should Be Submitted During Supply Of Sample. Material Should Be Isi Marked. Warranty Period: 30 Months After The Date Of Delivery
Feasibility Study And Detailed Project Report For Improvement And Upgradation Of About 300 Km Roads Under Assam Disaster Resilient Hill Area Road Development Project In The State Of Assam. Consultancy Services For Preparation Of
Consultancy Services For Survey Investigation And Preparation Of Detailed Project Report And Providing Pre construction Services In Respect Of Bishing Tinali Road Indicative Length 55 Pt 400 Green Field Alignment For Constr And Upgradation
Feasibility Study And Detailed Project Report For Elimination Of Level Crossings With Road Over Bridge At Rm-16, 33, 116 & 257. Total 04 Nos
Conduction Continuous Scour Monitoring Of Foundation Of Bridge No. 399 Sone Between Agy-Cpu Station Of Car-Cpu Section Of Prayagraj Division. Using Sonar Echo-Rang Technology By Airmar Echo Range Ss510 Smart Sensor Or Similar Equipment And Submitting Continuous Monitoring Data, Analysis And Preparation/Submission Of Detailed Reports Of Continous Scour Monitoring Data, Generating Alarms/Sms Alerts And Validation Of Reports With Groundts Levels.
Custom Bid For Services - Hiring Of Direct Marketing Agency Dmas For Domestic Dpng Registration Commercial Industrial Agreement Debt Recovery And Detailed Survey Report For Establishment Of Cng Dispence Station For Two 2 Year In City Gas Distribution..
Supply of Yaw Damper For Train-18 Coaches To Drg.No.Train18/Mc/Ac-0-5-012, Item-1, Alt- A. This Is Conceptual Drawing Only. Firm Has To Submit Oem Drawings With Detailed Di Mensions & Characteristics And Type Test Reports Confirming To Rdso 18005.Rev.01Of J Uly 2023 Also To Submitted. Warranty Period: 30 Months After The Date Of Delivery
Supply of Secondary Vertical Damper For Train-18 Coaches To Drg. No. Train-18/Mc/A C-0-5-010, Item-1, Alt-A. This Is Conceptual Drawing Only. Firm Has To Submit Oem Drawi Ngs With Detailed Dimensions & Characteristics And Type Test Reports Confirming T O Rdso C8703latest Revision/En-13802 Also To Submitted. Warranty Period: 30 Months After T He Date Of Delivery
Custom Bid For Services - Preparation Of Detailed Feasibility Study Report Dfr Custom Bid For Services - Revalidation Of Dfr Basis Pngrb Bidding
Supply of Yaw Damper For Vb/Train Set-18 Coaches To Drg. No.-Train 18/Mc/Ac-0-5-012 Item-1, Alt-B . This Is Conceptual Drawing Only. Firm Has To Submit Oem Drawing With Detailed Dimensions And Characteristics And T Ype Test Reports Confirming To Rdso/Cg- 18005 Rev-1 Of July 2023 Also To Be Submitted & Warranty Clause And Other Paraphernalia Should Be As Per Rdso Specification. Warranty Period: 72 Months After The Date Of Deliver Y
Consultancy Services For Preparation Of Detailed Engineering Report For Widening From Two Lane Paved Shoulder To Four Lane Paved Shoulder From Km 0.00 State Boarder Of Rajasthan And Gujrat To 76.400 Junction Of Nh62 In Sirohi Via Mandar Reodar And A
Rpf For Appointment Of Consultant For Preparation Of Master Plan And Detailed Project Report For Development And Augmenting Of Wharves Jetties At Port Blair Port In Andaman And Nicobar Island
Consultancy Services For Preparation Of Detailed Project Report For 4 Lane Bypasses To Villages I Lahli Ii Singhani Iii Kharak Iv Bamla On Nh-709E In Bhiwani Distt And Bypass To Tohana Town On Nh-148B
Providing Consultancy Services And preparation Of Comprehensive And Bankable Detailed Project Report Of Hanol-Tiuni Hydro Electric Project On River Tons In District Of Uttarakhand
Work Of Preparing Comprehensive And Reliable Detailed Project Report And Providing Consultancy Services Of Hanol – Tueni Hydropower Project On Tons River
Appointment Of Consultant For Peer Review Of Feasibility, Detailed Project Report, Bid Documents And Concurrent Evaluation For Various Projects Under Mmrda
Providing Consultancy Services And Preparation Of Comprehensive And Bankable Detailed Project Report Of Hanol-Tiuni Hydro Electric Project On River Tons
Providing Consultancy Services And Preparation Of Comprehensive And Bankable Detailed Project Report Of Hanol-Tiuni Hydro Electric Project On River Tons.