Good Earth Filling In Remaining Area Of Krishi Bhawan, Mithapur Under Garden Division, B Cd, For The Year 2023-24
Completed Scheme Under Na-Ii/Hort. Zone. Green Area At Cwg Sports Complex, Akshardham. Sh - Supply And Stacking Of Good Earth, Cocopeat, Hdpe Pots, Plants And Annuals Etc. At Site.
Supply of Ht Door Interlock Complete Key For Ac Earthing Switch Type 25.04, Make Of M/S Patra And Cha Nda Part No. Pce/Hil/Gp-194/001 Or M/S Secheron Part No .Lh Sg 480275Pz Or Woama. Warranty Per Iod: 30 Months After The Date Of Delivery
Supply of Earthing Cable Complete 95 Sq-Mm 750 Mm Length As Per Rcf Drg. No Lw71245 Alt A Or Latest. Warranty Period: 30 Months After The Date Of Delivery
Supply of 3 Way Cock Complete For Earthing Switch Hom Of Locomotive To Kpa Drg. No.Er/Kpa/El/Pn.2 G7.745A. Warranty Period: 30 Months After The Date Of Delivery
Hiring Of Earth Moving Equipments Material Handling Equipments And Cranes Per Hour Basis - Earth Moving Equipment Meterial Handling Equipment Crane 20 Ton; Tracked Excavator For Construction Of Road Oblique Tracked; 5 To 10 Years
Supply, Installation, Testing, Commissioning Of Expansion Of Earth Station At Ddk Vijayawada
Supply, Installation, Testing, Commissioning Of Expansion Of Earth Station At Ddk Leh
Supply of 42 Kv La Disconnector Assembly, Confirming To The Latest Revision Of Iec Standard Iec:60099-4 E D 2.2 - 2009 - 05. The Disconnector Assembly Will Include Adopter Plate And Earth Plate. Make - Ee, Lamco, Ray Chem, Radiant, Elektrolites. Rdso Spec. No. - Ti/Spc/Psi/Mogtla/0101 02/2015 Warranty Period: 30 Mo Nths After The Date Of Delivery
Earthwork In Embankment & Cutting, Construction Of Minor Bridges Including Rubs, Side Drains & Catchwater Drains And P-Way Work Track Linking & Ballast Supply In The Kalamb-Yavatmal Section From Ch. 40700 To Ch. 78200 Excluding Tunnel Approach From Ch. 51250 To Ch. 60351 In Connection With The Wardha-Nanded Via Yavatmal New Bg Line Project.
Supply of Wheel Set Earthing Equipment To Rcf Spec.No.Edts 101, Rev-Camendment 1 Correction 2 Specn: Edts101.Rev A Warranty Period: 30 Months After The Date Of Delivery
Supply of Heavy Duty Earthing Clamp 600 Amp Crocodile Type For Welding Work As Per Is 2641-1989. Make: Ador Welding/ Esab/Messer/Prima/Hmp/Weldstar Or Similar. Warranty Period: 30 Months After The Date Of Delivery
Supply, Installation, Testing And Commissioning Of S&T Material In Connection With Strengthening Of Earthing Arrangement At Lc Gate And Quad Cable Between Lc Gates And Stations.
Annual Repair Maintenance Operation Water Supply Under Assistant Engineer, Ferrargunj Sub Division, Rcd, Apwd, Wimberlygunj During 2024-2025.Sub Work Improvement Of Tirur Nallah Source By Earthcutting, Desilting Etc And Strengthening Of The Check Weir For Increasing The Sto
Supply Of Fixed Type Air Circuit Breaker For Power Cars Conforming To Iec 60947Part 1 & 2 Of Rati Ng 800 Amps, 3 Pole, 750 V, 50Ka Breaking Capacity With 6 No+ 6 Nc Auxiliary Contact Blocks, Manually Operat Ed With Under Voltage Release, Earth Fault Release With 30% / 40% / 50% Setting And Built In Cts And Arc Chute 75 0V, Thermal Magnetic Dn 1 Auxiliary Contact Uv/ Ef Release Equivalent To Abb Cat No- E2n800 Or Ge Cat No- Rms-9D Or L&T Cat No. Cn -Cs 800C As Per Rcf Spec. No. Edts 103, Revd. Amd.7. Make:- L&T, Abb, Ge Note-: Offer Accepted Only Oem Or His Authorized Dealers. Firm Should Supply Test Certificate & Guaranty Certific Ate Along With Supply Of Item. Warranty Period: 30 Months After The Date Of Delivery
Supply of Auto Transformer Starter Of 60 Hp Comprising Of 125A Mccb, As Incomer With Rotary Handle, Air Cooled Co Pper Wound Auto Transformer Having Variable Tapping 30/50/65/80%, With 12 Sec Starting Time, Three Nos Ac3 Duty Power C Ontractors, Bimetal Overload Relay, Electronic Over Voltage, Under Voltage Relay, Phase Failure, Phase Unbalanced Electronic Relay, Earth Leakage Relay Elr+Cbct, Compressed Scale Ammeter With Selector Switch, Voltmeter With Selector Switch, T Hree Phase And Motor On/Trip Led Indicators, Enclosed In Bolted Type Panel Made Of Minimum 2 Mm Thick Crca With P U Foam Gasket And With Foundation Channel. The Complete Enclosure Should Bein Power Coating Finished, Purchase Certific Ate Of Oem/Authorised Dealer Of Oem To Be Submitted With The Bill. Make- Bch Or Similar. Warranty Period: 30 Months After The Date Of Delivery
Procurement Of Full Euro Brass Earth Clamp With Braided Copper Shunt 95Sq.Mm For Mig- Mag /Arc Welding Plants. Make: - Welspring Universal, Model No. Ecgm 60 C Or Equival Ent Models Of Metal Arc/Swps. Warranty Period: 30 Months After The Date Of Delivery
Supply Installation & Commissioning Of One Set Spare Items For Re- Installation Of Weigh Bridge/Rn Y, One Set Consisting Of The Following Items- 1. Supply Of Cable For New Weigh Bridge House To Existing Weigh Bri Dge- 1 Job, 2. Stabilizer-01 No., 3. Signal Lamp-02 Nos., 4. Junction Box With Stand-01 No., 5. Earthing For Weig H Cabine-1 Job, 6. Electrical Connection With 3 Phase Room Wiring- 1 Job, 7. Charges For Spd As Per Rdso- 01 No., 8. Dismantling & Shifting Of Necessary Parts Of In- Motion Weigh Bridge From The Existing Weigh House To Ne W Weigh House- 01 Job., 9. Re- Installation & Commissioning Of In Motion Weigh Bridge, Calibration & Stamping By Ilm- 01 Job. Make- Digital Weighing System- P Ltd, Bilaspur C.G. The Details Description & Specification Are Enclosed As Per Annexure- A Warranty Period: 30 Months After The Date Of Delivery
Repair/ Renewal Of Old Earthing And Lightening Conductors Etc Under Ge Awc Mhow
Urgent Protective Measures To Prevent Sliding Of Earth In Surrounding Of Hostel Block And Works Required To Make Semi Permanant Block Functional Before Monsoon