Supply Of Exhaust Manifold Gasket, Clutch Plate, Pressure Plate Or Cover Clutch Plate, Release Bearing, Release Bearing Fork Lock Only, Propeller Shaft Uj Cross, Water Pump Assy With Gasket, Head Gasket, Air Filter Primary And Secondary, Diesel Filter Primary And Secondary, Engine Oil Filter, Valve Steam Oil Seal Inlet And Exhaust, Gear Lever End, Fan Belt, Banjo Washer 19 17 14, Injector Over Flow Washer, Wiper Blade, Body Top Parking Light Assy With Bulb, Body Side Left And Right Parking Lifht With Bulb, Cabin Light Led Type, Meter Bulb 53 No, Door Glass Rh Size 18 Inch X 24 Inch, M S Sheet 2Ft X 2Ft
Supply of 475 Maximile Engine Oil Brake Oil Dot 3 Distilled Water Diesel Exhaust Fluid Coolant Red Coolant Green Grease Motor Cycle Engine Oil Tq Oil Stf
Supply Of Clutch Plate Assy Mahindra Bolero, Pressure Plate Assy Mahindra Bolero, Realase Bearing Mahindra Bolero, Banjo Pipe Mahindra Bolero, Clutch Cyinder Assy Mahindra Bolero, Back Light Assy Mhindra Bolero, Silencer Packing Mahindra Bolero, Nut Bolt, Engine Mounting Maruti Gypsy, Relay 12 Volt Maruti Gypsy, Check Nut Tata 407, Check Nut Lock Tata 407, Fuel Filter Tata 407, Gear Box Speed Sensor Tata 407, Cross Holder Propeller Shaft Tata 407, Uj Cross Tata 407, Uj Cross Tata 709, Anabond Tube, Fan Belt Air Compressure, Fan Belt Car Washer, Stud Bolt, Engine Oil Filter Tata 1613 Se, Ac Pump Valve Kit With Spring
Supply of Lubricant Items, 298 Servo Mgo 20W40 Servo Engine Oil 15W40 Servo Grease Mp3 Servo Kool Plus Max Shied Def Def Gulf Adblue Max Def Maxi Clean Engine Oil Flush
Conservancy Services To Estate Area Of Ccernd South And Chief Engineer
Operation And Maintenance Of Departmental Dredger Ims 7012 Capacity 250 Meter Cube Hour Solid With Allied Equipment For Dredging Work Under Project Of Dredging Work In Site Described By Engineer In Charge
Supply Of Pvc Insulated Multi Strand, Single Core Copper Conductor Of Size 3/0.75 Mm As Per Is 69 4:2010 And Rdso Specn.No.Irs:S-76/89 Amnd-3 . Each Coil Should Be Of 100/200/500 Meters Length.Colour O F The Wire Which Is Required Will Be Specified By The Engineer In-Charge. Inspection: I Rdso/Rites If Value Of Ite M In Work More Than 5 Lakhs Ii Consignee Subject To Procurement From Rdso Approved Vendors If Value Of Wh Ole Item In Work Less Than 5 Lakhs As Per Extant Instructions By Railway Board. Warranty Period: 30 Months Aft Er The Date Of Delivery
Work Of Unloading Of P. Way Materials For Sse/ P. Way/In Charge/Track Depot/ Sahibganj, In The Jurisdiction Of Assistant Engineer/ Sahibganj
Supply of Engine Control Switch Ecs Blw Drawing No. El/Pt/0624 Alt-R2, Blw Part No.12319223 Mak E-Kayess Or Equivalent Warranty Period: 30 Months After The Date Of Delivery
Supply Of Rail Profile Measuring Equipment Miniprof With Bluetooth. Rail Measuring Unit As Per Sp Ecification No. Tm/Sm- 323.Specification Of Rail Profile Measuring Equipment Miniprof Issued By Rdso. Minip Rof Rail Includes: 1. Envision Software Modules: Core, Measurement And Analysis Single User Installation, 2. Ac Cessories Kit With Cable, 3. Charger, 4. Lightweight Transport Case, 5.Telescopic Rod, 6. Nomad Pda. Accepted Make: Greenwood Engineering Or Equivalent. Warranty Period: 24 Months After The Date Of Delivery Five Year Amc Charges Of Miniprof After Warranty Period As Per Specification No. Tm/Sm-323. The Cost Breakup And Detailed Special Conditions Are Attached As Annexure A. Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 8 %
Design, Engineering Manufacturing, Procurement Of Materials, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Pressure Gauges Supply Of Pressure Gauges
Procurement Of Spares/ Consumables-Cetane Top-Overhaul Kit For Cfr Engine, Gasket Exhaust Flange 110523, Gasket Gear Cover, P/N 106917A, Gasket, Cylinder Base .003 P/N 105181C, Gasket, Cylinder Base .010 P/N 105181B, Gasket, Cylinder Base .015 P/N 105181A, Gasket, Cylinder Base 021, P/N 105181, Gasket, C.4B.Mthick, 109346 For Cfr-Engi, Gasket, Wat. Pipe, B5096a For Cfr-Engine, Gasket, Wt.In.Cap, 109421 For Cfr-Engine, Gasket.Cfvl.&Bd 75982A For Cfr-Engine, Gasketmanifold B2557 For Cfr-Engine, Gskt, Intake, Manifold, P/N-109345, Seal O Ring, Condenser Cover P/N 118013E, O-Ring, P/N;118013M, Tray Vlv Gear Cover, P/N:O106917a, Xcp, Cfr, Ring Piston Compr., 106222A For Cfr-Engin, Ring Piston, Comp, Chrome, P/N:106222B, Ring Piston, Oil, P/N:23505, Ron/Mon Top Overhaul Kit For Cfr Engine, Screwcaphead 21291 For Cfr-Engine, Spring, P/N:B5268, Switch Drum Reverse, Washer, Lock1/4, P/N:21050, Key44408d For Cfr-Engine, Screw Set, 21692 For Cfr-Engine, Coupling, Clamp Type;P/N:111862, Xcp.Cfr , For Cfr Octane And Cetane Engines
Custom Bid For Services - Inspection Services By Api Certified Engineers Inspection Engineers During Shutdown At Mathura Refinery
Indigenous Development Of Sta/20-751-008 Board/ Shield For Ai-20D Aero Engine
Supply of 19 Switch Assy Backup Lamp Bush Suspension Pipe Intake Mounting Engine Front Vehicle Speed Sensor Contact Assy Neutral Switch Bolt Oil Filter Side Indicator
Supply Of Genr Spare Parts - Bolt Flange 8X50, Sensor Assy Te, Engine Block Complete, Carburetor Repair Kit, Fuel Pump With Solenoid Valve, Fuel Pipe, Fuel Injector, Cylinder Head Complete Assy With Valves, Inlet And Exhaust Valve Set Pair, Rocker Arm Assy Complete Set, Air Filter Element, Push Rod, Set Of Joint, Cylinder Head Gasket, Set Of Washers, Self Starter, Recoil Assy, Starting Rope, Mounting Pads, Piston Std, Etc
Supply of Starter Motor Assembly To Mahindra Powerol Part No:Mh20624372a For Th E End Use On 3 Ton Forklift Industrial Diesel Engine. 1 Warranty/Guarantee Period S Hall Be For A Period Of Minimum 6 Months From The Date Of Fitment Or 9 Months From The Date Of Supply Whichever Is Early Against Quality Manufacturing Defects And W Orkmanship For The Item Supplied. 2 Authorization From Oem Is To Be Enclosed Alon G With The Offer, 3 Offers Are To Quote Both Make And Model Number/Part Number With Out Which The Offers Will Be Summararily Rejected. Warranty Period: 9 Months After T He Date Of Delivery Starter Motor Assembly To Mahindra Powerol Part No:Mh026024613a For T He End Use On 3 Ton Forklift Industrial Diesel Engine. 1 Warranty/Guarantee Period Shall Be For A Period Of Minimum 6 Months From The Date Of Fitment Or 9 Months Fro M The Date Of Supply Whichever Is Early Against Quality Manufacturing Defects And Workmanship For The Item Supplied. 2 Authorization From Oem Is To Be Enclosed Alo Ng With The Offer, 3 Offers Are To Quote Both Make And Model Number/Part Number With Out Which The Offers Will Be Summararily Rejected. Warranty Period: 9 Months After T He Date Of Delivery Water Pump Assembly To Mahindra Part No:Mh40939m8 For The End Use On 3 Ton Forklift Industrial Diesel Engine. 1 Warranty/Guarantee Period Shall Be For A P Eriod Of Minimum 6 Months From The Date Of Fitment Or 9 Months From The Date Of S Upply Whichever Is Early Against Quality Manufacturing Defects And Workmanship For The Item Supplied. 2 Authorization From Oem Is To Be Enclosed Along With The Of Fer, 3 Offers Are To Quote Both Make And Model Number/Part Number With Out Whic H The Offers Will Be Summararily Rejected. Warranty Period: 9 Months After The Date Of Delivery
Supply of Set Of Connector & Sensors For Caterpillar Make Engine Assly. Consisting 1 Water Level Sensor T O Caterpillar Part No. Cr009, Qty. 02Nos., 2 Rs232 Plug-In Communication Module, Qty. 04Nos, 3 Il-Nt Aio For Controller, Qty. 04Nos., 4 Oil Transducer Pressure Sensor, Qty. 02Nos., 5 Temperature Sensor, Qty. 02 Nos. & 6 Diode A 1W9070, Qty. 02Nos. Note: 1 Material To Be Procured From Oem Or Their Authorized Dealer Only. Warranty Period: 30 Months After The Date Of Delivery
Supply of Amplifier Power Lcc Card Cummins Part No.3167062 Suitable For 8 Wheeler Tower Wagon Det C Cummins Diesel Engine Vta - 1710 L Make :- Cummins. Warranty Period: 30 Months After The Date Of D Elivery
Annual Repair Maintenance Operation Water Supply Under Assistant Engineer, Ferrargunj Sub Division, Rcd, Apwd, Wimberlygunj During 2024-2025.Sub Work Improvement Of Tirur Nallah Source By Earthcutting, Desilting Etc And Strengthening Of The Check Weir For Increasing The Sto