Balance Work Of P Way Track Linking, Transportation Of P Way Material, Leading Out Of Ballast, At Welding And Other Ancillary Works From Kailaras To Sabalgarh In Connection With Gwalior- Sheopurkalan Gauge Conversion Project
Request For Proposal Rfp For Appointment Of Authority Engineer For Providing Project Management Services For Epc Contract Of Gauge Conversion Mg To Bg Of Mukhtiyara Balwada Incl.-Omkareshwar Exclud. Section Length 21.70 Km Including Electrification In Connection With Ratlam-Mhow
Fabrication, Supplying, Assembling/Erection And Launching Of 45.7 M Open Web Girders 25T. Loading Including Fabrication, Supply And Fixing Of H-Beam Sleepers And Rocker & Roller Bearings For Br.No. 1A2x45.7 M. Between Nanpara -Nepalganj Section Of Bahraich - Nanpara - Nepalganj Gauge Conversion Work
Construction Of Substructure And Superstructure Of Major Bridge No. 21B 4X18.3M Composite Girder On Permanent Diversion At Km 11/516 Along With Construction Of Permanent Diversion, Construction And Extension Of Lhs No 16 1X6.00X3.6M At Km 11/778 Between Mhrl-Cdna, Construction Lhs No. 35A 1X5.00X 2.50M At Km 27/600, Lhs No. 38 1X5.00X3.00M At Km 20/800 Between Vph-Khtn And Protection Of Bank Along The Waterbody At Various Locations And Other Miscellaneous Works In Between Jjp And Lkq Stations In Connection With Gauge Conversion Of Jhanjharpur-Laukaha Bazar Section
Left Over Electrification Work Of 07 Nos- Quarters Of Bhojipura, 11 Kv/415 Volt Sub-Station And Allied Work At Lalkuan, Second Platform Of Harsinghpur Goba, 150M Long Extended Platform Of Kasganj Station And Under Ground Cabling For High Mast Of Pilibhit Goods Siding In Connection With Kanpur-Kasganj-Mathura & Kasganj-Bareilly-Lalkuan Incl. Material Modification For Extension From Bareilly To Lalkaun And Mandhana-Brahmavart552.9 Km And Philibhit-Shahjahenpur Gauge Conversion Projects, Respectively
Indoor And Outdoor Telecommunication Work With Laying Of Ofc & Quad And Supply & Installation Of Stm & Pdmux In Connection With Gauge Conversion With Provision Of Single Line In Dholpur - Sirmuttra Section
Design, Programming, Installation, Supply, Testing And Commissioning Of Electronic Interlocking Ei System Conforming To Rdso Specification No. Rdso/Spn/192/2019 Or Latest With Latest Amendment If Any As Per Sip Along With Indoor & Outdoor Work Including Part Supply Of Materials At Behraich, Risia, Matera And Nanpara Stations In Connection With Behraich - Nanpara Gauge Conversion Work
Doubling Of Track Between Cngr-Cgv & Gauge Conversion Of Track Between Kollam And Edamman Station: Preparation And Submission Of Digitized Final Certified Land Plans Pertaining To Doubling Projects Between Kyj-Mvlk, Mvlk-Cngr, Cngr-Cgv, Kyj-Qln And Qln-Tvc And Gauge Conversion Between Qln And Edn.
Construction Organization - Engineering, Procurement And Construction Epc Contract For Gauge Conversion Mg To Bg Of Track From Tukaithad Excl. To Khaknar Kalan Incl. Stations I.E. From Km: 634.260 To Km: 652.700-18.44 Km Including Electrical General Services In Connection With Amlakhurd - Akot Section Phase-Iii Of Nanded Division, Of South Central Railway