Painting Of 13.8Kv, 3-Phase Isolated Phase Bus Duct From Primary Of 190Mva Transformer To The End Of Transformer Bay, Sfc, Str-1 & 2 Breaker Cubicle And Its Related Bus Ducts & Channels In Tc Bay, 400Kv Gib Of Mtr-1, 2, 3, 5, 6 & Str-2 From Transformer Hv Bushing To Gis Floor And Isolator Panel At Zero Floor Sfc Area At Slbhes, Srisailam Dam West
Supply Of Seal Spring Set, Ring Packing, Ring, Gasket, Cotter Pin, Bushing, Boot, Rubber Piece, Rubber Cover Gin Muzzle, Packing Rubber Ring, Fuse Link, Spacer, Hose Connection, Ring Labyrinth
Supply of Set Of Gauges For Slack Adjuster As Per Rdso G-92 Manual Consisting Of 4 Items As Given: 1 Gauge For Leader Nut As Per Figure No 31 Of Rdso G-92 Manual. 2 Gauge For Leader Nut As Per Figure No 32 Of Rdso G-92 Manual. 3 Gauge For Guide Bushing As Per Figure No 34 Of Rdso G-92 Manual. 4 Gauge For Barr El Lead As Per Figure No 35 Of Rdso G-92 Manual. Warranty Period: 30 Months After The Date Of Delivery A Set Of Gauges For Slack Adjuster As Per Rdso G-92 Manual Consisting Of 4 Items As Given Belo W: 1Gauge For Adjuster Tube As Per Figure No 33 Of Rdso G-92 Manual. 2 Gauge For Leader Nut Casing As Pe R Figure No 36 Of Rdso G-92 Manual. 3 Gauge For Traction Sleeve Guide As Per Figure No 37 Of Rdso G-92 M Anual. 4 Gauge For Actuating Sleeve As Per Figure No 38 Of Rdso G-92 Manual. Warranty Period: 30 Months After The Date Of Delivery