Supply of Brushless Alterator Of 4.5 Kw Cap, V Belt Drivento Rdso/Pe/Spec/Tl/0054-200 3Rev.0 With Ammendmenno.1&2 Suitable For 110 Volts Train Lighting System With Foll Owing Scope Of Supply As Perdetaildescription Given Below:14.5 Kw 110 V Alternator -1 No, 2Deep Groove4alternator Pulley As Per Spec.N0.Elps/Spec/Tl/13March-1998-1 N O.3Deep Groove4 Axle Pulley Withrubber Pad As Per Rdso Spec.No.Elps/Spec/Tl/13Ma Rch 1998-1 No.4Safety Chain-2No. Warranty Period: 30 Months After The Date Of Delivery
Custom Bid For Services - Supply And Fixing Of Losma Electrostatic Oil Mist Collector With Gi Ducting Model Newton N6 4 Ap Electrostatic Precipitator Unit Qty 2 Sets Make Losma As Per Scope Of Supply And Scope Of Work Enclosed In Annexure I
Construction Of Beerbal Barrage And Pressurized Pipe Irrigation Network Under Sitapur Hanumana Irrigation Project As Per Detail Given In Scope Of Work But Not Limited To That
Facility Management Services - Lump Sum Based - Industrial; Dismantling Of Unit1 Generator Rotor As Per Scope Of Work Given In Part A; Consumables To Be Provided By Service Provider Inclusive In Contract Cost Facility Management Services - Lump Sum Based - Industrial; Inspection And Cleaning And Dimensional Feasibility Assessment And Electrical Testing And Shaft Run Out With Face Out Checking Of Unit 1 Generator Rotor As Per Scope Of Work Given In Part B;.. Facility Management Services - Lump Sum Based - Industrial; Dismantling And Dimensional Feasibility Assessment And Assembly Of Unit 2 Generator As Per Scope Of Work Given In Part C; Consumables To Be Provided By Service Provider Inclusive In Contrac.. Facility Management Services - Lump Sum Based - Industrial; Inspection And Varnishing And Testing Of Unit 2 Generator Rotor As Per Scope Of Work Given In Part D; Consumables To Be Provided By Service Provider Inclusive In Contract Cost
Components Manufacturing And Dimensional Inspection Shall Be Done As Per The Drawings Provided, Drawings Or Technical Specifications Shall Be Shared Upon Submission Of Duly Signed Nda, Supplied With-In 60 Days From The Date Of Clearance Given By Indenting Department For Manufacturing, Raw Materials Of All Components Shall Be Vendor Scope Only, Etc