Supply, Installation, Testing, Commissioning Of Ofc System In Ring Connectivity At Dabh Airport Indore Mp - Armoured Ofc Cable, Hdpe Pipe, Liu 24 Port, 24 Port L 2 Switch, 8 Port L 2 Switch, Gi Pipe, Inspection Chamber, Cat 6 Patch Cord, Fiber Patch Cord, Fiber Joint Enclosure, Route Marker, Overhead Laying Of Fiber Cable In Hdpe Pipe With Saddle, Digging And Laying Of Ofc Cable In 40 Mm Hdpe Pipe In Hard Soil, Digging And Laying Of Ofc Cable In 40 Mm Hdpe Pipe In Soft Soil, Sitc Of Ofc System
Replacement Of Damaged Sanitary Lines Including Man Holes, Inspection Chambers And Septic Tank From Qtr No: D-23 To D-30 At 1St Zone, Mandamarri Area
Dahod:-Balance Workannual Maintenance And Cleaning Of Under Ground Sewer Lines, Manholes, Inspection Chamber, Gulley Trap & Sewage In Railway Colonya, B, C, D & E With Loco Work Shop And Chlorination Of Filter House Installation And Commissioning Of Chlorinator And Supplying Of Chlorine.
Cleaning Of Septic Tank With Washing And Inspection Of All Chambers Of Gua Township At Gua Ore Mines
Supply Of Copper Earthing Cable For La 1 Brazing Of Earthing Contacts Replacement Of Earthing Cable For La 1 Repair Of Earthing Pits Associated With La 1 Supply Of Charcoal Supply Of Salt Granules Supply Of Earth Enhancing Compound Maintenance Work Of La 2 Mast And Checking And Repair Of The Earth Cable Connection Above Mast Reconstruction Of Earth Pits Inspection Chamber Associated With Radar Equipment Ups Antenna And La-1
Construction Of Inspection Chamber At Main Lab Building, Crest Campus Of Iia, Hosakote
Supply, Installation, Testing, Commissioning Of Earthing System For Ats Complex And Iatc Tower At Navi Mumbai Airport, Supply Of Copper Plate, Supply Of Pvc Pipe For Watering, Supply Of Salt, Supply Of Charcoal, Supply Of Hdpe Pipes, Supply Of Copper Strips, Supply Of Multi Strand Single Core Pvc Insulated Copper Cable, Supply And Installation Of Sub Equipotential Earth Bus Bar, Supply And Installation Of Main Equipotential Earth Bus Bar, Installation Job For Earth Pit Including Inspection Chamber, Installation And Laying Of Copper Strip For Earth Grid, Installation And Laying Of Copper Strip From Earth Grid To Building, Installation And Laying Of Copper Strip From Ups Panel Room At Ground Floor To All The Rooms In All The Floors Of The Building And Also To The Roof Area Of The Building
Balance Work Of Aden Swm Section : Cleaning Of Manhole, Inspection Chambers, Sw Pipe Lines And Soak Pit In Sse/W/Swm Section For Two Year.
Maintenance/Overhauling Of Mechanical Equipment -, Replacement Of Rcm Drives Mechanism Housing During Psd., Rcm Drives Ball Screw Assembly Replacement During Psd., Pss Lower Chamber O-Ring Replacement Or Assistance In Wire Rope Inspection Or Assistance In Pss Dashpot Oil Leak Inspection During Psd. , Pss Lower Chamber Replacement During Psd., Pss Upper Chamber Replacement During Psd., Pss Lower Chamber Mounting Flange Gasket Replacement During Psd. During Exigencies, Psds& Ugp S/D.