Supply And Stacking Of Stone Metal 40Mm, Stone Chips 20 Mm, Stone Chips 12.5 Mm And Sand For Pmt Works Between Km 0.000 To Km 61.546, Dumping Location At Km 10.000 Under Part- A And Km 51.00 Under Part-B On Khotakpa-Tshobaley Road
Laying And Linking Of Bg Main Lines/Loop Lines/Sidings, Including Points And Crossings, Spreading Of Stone Ballast, Tamping Of Track, Transportation Of P.Way Materials And Other Ancillary Works From Km. 0.00 To Km. 34.00 In Connection With Taranga Hill - Abu Road Via Ambaji New Bg Line Project
Supply And Stacking Stone Aggregates At Km 82.00 On Leh- Chalunka Road For Surfacing Works Between Km 85.00 To 95.00 Under 54 Rcc/16 Brtf Project Vijayak In The Uniion Teritory Of Ladakh
Supply Of Aggregates And Bricks For Dett Bg At Km 186 On Jammu Poonch Road, 113623 Stone Metal 40 Mm Stone Chips 20 Mm Stone Chips 10 Mm Sand Bricks 2Nd Class Size 190X90x90
Supply And Stacking Crushed Stone Chips 22.4 Mm, Stone Chips 11.20 Mm, Stone Chips 6.7 Mm And Stone Dust At Km 106.00 Hmp Site On Balipara Charduar Tawang Road For Resurf Works 2024-25 On Bct And Oksrt Road In State Of Arunachal Pradesh Resurfacing Works 2024-25
Supply And Stacking Of Crushed Stone Chips 22.4 Mm, 20 Mm, 11.20Mm, 12.5Mm, 6.7 Mm, Stone Dust And Sand Zone Ii At Km 9.00-0.50 Hmp Site On Bct Road And Tmf Road Resurfacing Works 2024-25