Procurement Of Rs Items. Fixture For Intermediate Gear Drive Unit Of Rs-2 Train Description: 1. Fixture: 1 No. 2. Stand For Fixtur E: 1 No. 3. Lifting Arrangement: 1 No. 4. Special Spanner Small: 1 No. 5. Special Spanner Big: 1 No. 6. I-Bolt: 1 N O. 7. Pinion Shaft Special Tool: 1 No. 8. Protection Cover For Pinion Shaft Gear: 1 No. Make-Ninethray, Tew Or Simil Ar Hydraulic Trolley For Battery Box Replacement In Rs-2 Trains. A Specification Of Hydraulic Trolley Dimensionlxb - 105X56 Cm, Load Capcity Staic & Moving -02 Ton Capacity, Minimum Time Upto Which Hydra Ulic Trolley May Kept On Load- 24X7 Hrs, Lifting Hight- 4 Ft., Material- Ms, Plate Thickness- 3 Mm Operation-Manual With Hydraulic Assembly Finishing- 01 All The Joints, Welding Etc Are Done With Good Finishing. 02 Trolley Shall Be Painted With High Quality & Durable Primer And Paint. Warranty Period- 01 Year Design Approval- Vendor Has To Ta Ke The Design Approval Before The Manufacturing Of Trolley. Lifting Table Shall Be Pallet Type Manual Operated, P Ainted With Primer And Paint Bminimum Accessories To Be Used In The Hydraulic Trolley Wheelhigh Quality, H Eavy Duty, Durable & Standard Make- 04 Set Front Two Set For Steering Purpose Brake Application On 2 Wheels Hydraulic Cylinder- As Per Design Requirement Brake Application By Hand Feature Should Be Provided. Manufact Urer Tag With All The Required Information Like Manufacturer Name, Year Of Manufacturing, Capacity, P.O No., Do S & Dont Any Others If Any- 01 Nos. Operating Assembly- At Suitable Height. Any Other Accessories- As Per Req Uirement
Hiring Of Manpower I.E Sweeper 65 Nos For Period Of Two Years Inclusive Of Gst Service Charge I.E Total Amount Of Service Charge To Be Mentioned Inclusive Of Gst Total Cost Of Consumables For Two Years I.E Cleaning Material Inclusive Gst Total Cost Of Uniform For Period Of Two Years I.E 02 Sets Of Uniform To Be Provided To Each Sweeper Every Year Incluisve Of Gst Total Cost Of Garbage Lifting For 02 Years I.E Tractor And Trolley Ten Trip Per Month Inclusive Of Gst Total Cost Of Tools To Be Provided By Service Provider For Two Years Inclusive Of Gst