Incoming Shop By 50 M And Additional Facility For Existing Shop, Air Break Shop & Other Misc. Shop For Poh Of Lhb Coaches, Additional 750 M Embedded Track And Provision Of Shed Between Old Bos And Old Was For Axle Pulley Fitment At Crw/ Hrt, Expension Of Administrative Building At Second Floor Of Crw/Harnaut And Under Gear And Special Repair Shed With Rail Line And Pit In Chaches At Crw/Harnaut.
Making Arrangement For Potable Water Tankers At The Time Of Non Availability /Short Supply From Delhi Jal Board To The Underground Tanks At 29-31 Probyn Road And Reids Line, University Of Delhi
Supply Of Loose Items Spares-Bowl Hub Cover 26111003290-00, Seal Ring Lower 26121003267-00, Spring Holder Ring 26132003207-00 , Seal Keeper 36131003774-00 , Manway Cover 36131003788-00 , Loose Items –Dynamic Classifier- 36131003821, Journal Liner Assembly 06108800510-00
Distribution Of Cable By Overhead Power Line Or Underground Cable System
Supply, Installation, Testing, Commissioning Of 320 Kg Elevator At B.No. 8, Cm Residence, Civil Line
Welding Of Flange In10inch And 8Inch Dia M.S.Pipe, Fabrication Of 10Inch Dia Bend, 10Inch And 8Inch Dia Tapper Pipe To Keep Ready Pipes For Further Erection Of Pipe Line And Making Of 04Nos. Shelter For Ocp Blasting At Phularitand, Amp Colliery.
Supply Installation Testing Commissioning Of Package Type Ac Units Along With Gi Ducting Thermal Acoustic Insulation Supporting Structural Works Power Control Cabling Supply Return Air Grills Gi Cooling Tower Water Lines Earthling Zfp Rma Nfc Hyd Ac Provision For Zfp Rma Assembly Facility
Supply of 20 Split Air Conditioner Including Green Ac Wall Mount Type Q2 Automatic Line Voltage Correctors Step Type For Domestic Use - Is - 8448 Q2
Engineering, Procurement And Construction Epc For Construction Of Double Line Track 3Rd & 4Th Line Formation Including Earth Work, Blanketing, Minor Bridges, Rub, Major Bridges, Important Bridges, Rfo Works, Track Works, Station Building, Electrification Works, Trd Works 2X25 Kv And Other Miscellaneous Works For 32.5T Indian Railway Standard Loading In Gaya Detour Section In Between Dfcc Ch: 183.680 Ir Ch:434.426 Near Koderma Detour End To Dfcc Ch:225.300 Near New Kastha In Dhn
Urgent Repair Of Water Supply Line, Cleaning And Improvement Of Sewer Line At H-2 Block, Community Hall, Jahangirpuri. Construction Of Bvk/C.Hall.
Supply Of Collet Nut-Part No. 002-1036, Collet Body 0.25 Inches -Part No. 002-1038, Ref. Nut-Part No. 002-1011, Lower End Plate-Part No. 002-1015, Spacer Lower Bearing-Part No. 002-1017, Rotor-Part No. 002-1019, Rotor Blade-Part No. 002-1021, Liner-Part No. 002-1023, Dowel Pin-Part No. 002-1025, Upper End Plate-Part No. 002-91027, Washerpart No. 002-1033, Safety Lever-Part No. 002-7001, One Pc Casing-Part No. 002-3011, T.V.Plug-Part No. 002-2033, O Ring Big-Part No. 002-2031, Spring Throttle-Part No. 002- 2029, O Ring Small-Part No. 002-2027, Throttle Valve-Part No. 002-2025, Safety Lever Pin-Part No. 002-7009, Adaptor-Part No. 002-2017, Nipple-Part No. 002-2019
Upgradation Of Internet Lease Line Ill From 60 Mbps To 500 Mbps
Formation Treatment Tftr For 2.60 Kms From Km 622.40 To 625.00 On Up Line In Between Surla Road - Ichhapuram Section
Shifting Of 4000Gpm Pump Motor Set Five Times Of Ground Level After And Before Blasting At Jarlahi Coal Face And Diversion Of Its Pipe Line Due To Safety Purpose At Phularitand Under Amp Colliery.
Supply of Relay, Plug In Type, Style Ql1, Magnetically Latched, Neutral Line, 24V Dc, 11F.4B Contacts, Front A Nd Back Contacts Metal To Carbon, Complete With Plug Board, Retaining Clip & Connectors Conforming To Brs : 935 A, Irs : S 34 & Irs : S 23 Or Latest As Applicable. The Interlocking Code For This Unit Shall Be Abdeg. Warrant Y Period: 30 Months After The Date Of Delivery
Conversion Of Existing 3.3Kv Bus-Bar Of Ara-Kanta Substation Into 11Kv Bus-Bar, Dismantling Of Complete 3.3Kv Oh Line From Ara -Kanta Substation To Dumerbera Substation And Installation Of Transformers At Ara Kanta Substaion
Rendering Services For Conducting Aerial Topographical Survey Using Dgps Based Integrated Drone, Preparation Of L-Section, Esp, Sip, Gad, Soil Exploration, Preparation Of Bill Of Quantity And Epc Tender Documents And Other Ancillary Works Between Alauli - Kusheshwarasthan Station Approx-21.00Kms In Connection With Construction Of New Bg Rail Line Between Khagaria - Kusheshwarasthan Station.
Urgent Repair Of Water Supply Line, Cleaning And Improvement Of Drainage System At Ramgarh Community Hall Jahagirpuri Pid 16056. Construction Of Bvk/C.Hall.
Supply Of Set Of Items 1 Red/Black/White Cast Vinyl Stickers Cut Out To Required Size In English, Hindi And Graphics, Along With One No Separate Stencil Set With Gutter Beeding Of 3 Inches To 0.5 Inches As Per Fonts Req Uired, Total Measuring 105 Square Feet. 2 Printed Cast Vinyl Stickers To Required Size In English, Hindi And Graphics Like Logo, National Flag Etc., Total Measuring 30 Square Feet. Has The Following Product Specifications: Eco Solvent P Rinting Linear Polyethylene-Coated Paper Factory Laminated Thickness Of 110 Microns With Adhesive, Adhesive Weig Ht Of 150 Grams/Sq Meter Adhesive Is Solvent Acrylic, Pressure Activated, Re-Positionable With Air Release Channel S, Adhesion Strength Of 25 N/Sq Mm. Ftm1: 180-Degree Peel, Tensile Strength Of 25 N/Sq M, Resistance To Mild Alka Li, Acid And Fuel Spill. Minimum Gloss Value Shall Be 70 Achieved At 60 Degree Measured By Gloss Meter. Note: No Deviation In The Specification Will Be Allowed. Detailed Description Annexure For The Vinyl Sticker Requirement Will Be Given To Firm After Issue Of Purchase Order Only.Firm Should Submit Purchase Proof Document From Oem Or Its Auth Orised Dealer/ Distributor Along With Supply Of Material. Make: 3M Or Avery Dennison Or Nicholite Or Dm Only. Warranty Period: 30 Months After The Date Of Delivery
Design, Engineering, Supply, Installation, Testing And Commissioning Of Left Over Work For 132 Kv Double Circuit Transmission Lines From I, Angada – Silli, Angada – Irba, Irba –Kanke, Irba – Ratu, Sili Chowka