Dismantling Of Foot Step Non Modified And Supply Of Modified Foot Step Along With Fitment For Wag9/Wap7 Three Phase Electric Locomotives As Per Drg No.C/Els/Lgd/B.F/2/45, Alt-3
Supply of Standby Inverter Suitable For Ac Fuel Pump Motor To Emd Pt No.40122943 Along With Installation K It For Hhp Diesel Locomotives As Per Specifications Mentioned In Annexure -1 & 2. Warranty Period: 30 Mo Nths After The Date Of Delivery
Supply of Silicon Diode For The Wag-7 Type Locomotive, Hirect Make High-Capacity Rectifier Type S-43 Ar-5 10 Or Ruttonsha Make Diode Type Osd 550 N 43 Sq For Rsi Block 56 Diodes. Make/Brand: Hirect/ Ruttons Ha Make Only. Material To Be Supplied By Oem Or Their Authorized Dealers Only Warranty Period: 30 Months After The Date Of Delivery
Supply of Pvc Photo Identity Card With Indian Railway And 50 Golden Year Hologram Logo Along With Barcode, S Ize 3.5 X 2.25, Printed On Both Side Of 300 Dpi Photographic Resolution. Vertical Card With Insert Holder And Ribbo N Computer Printed - Electric Locomotive Workshop Central Railway Bhusawal. As Per Sa Mple Document Attached. Firm Should Collect Employee Data, Photo And Signature After Placing Of Purchase Order From Elw/Bsl. Warranty Period: 30 Months After The Date Of Delivery
Supply of Name Plate For Poh Locomotives As Per Dr Name Plate For Poh Locomotives As Per Drg No Elw/Bsl/Sk No. 403.
Supply, Installation And Commissioning Of Pc8 Relay Contact Test Unit For Testing Of Pc8 Relays Of Wa G5 Locomotives With Suitable Test Bench Per Annexure A. Warranty Period: 30 Months After The Date Of Deliver Y
Supply of Arc Chamber - Type S307- Ac Code - 1.1509.301369 For M/S. Schaltbau Make Radiator Fan Contactor For Siemens And Medha Control System Hhp Locomotives. Make:- M/S. Schaltbau India P Ltd. Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Essential Maintenance Spares For Bhel Make 2X500 Kva Hotel Load Converter For Wap-7 Electric Locomotives. Set Consists Of 04 Items In 7 Nos. As Per Annexure-A Attached. Warranty Period: 24 Mo Nths After The Date Of Delivery
Supply of Sand Pipe Assembly Complete Loco Set As Per Drg. No.Tacm-1, R4 With Part Drg. For Ac/Dc Locos Set Of 08. Sand Pipe Assembly Complete Loco Set As Per Drg. No. Tacm-1 R3 With Part Drgs. For Ac-Dc Locos. Set Set Of Sand Pipe Assembly Lh And Rh For Three Phase Locomotives As Per Drawing No.Trs/Gmo/ M-1/Wag-9/012 & 013, Alt-2.
Supply of Hose After Cooler To Educator Tube With Adapter For Hhp Locomotives As Per Drawing No. Dsl/Tkd/ Sk No. M-11707. Warranty Period: 30 Months After The Date Of Delivery
Supply of Serial Concentrator Unit Scu-500 Suitable For Emd Locomotive As Per Emd Pt. No. 40199438 Ma Ke- Emd Warranty Period: 30 Months After The Date Of Delivery
Supply Of Log Book Containing 200 Printed Pages Of A4 Size 90 Gsm Paper. Book Side Binding With T Hreaded 03 Holes And Book Cover 250 Gsm White Laminated Paper With Red And Black Letter Printed On It. The Boo K Shall Be Used For Record Keeping Of Data Of Locomotive Of Els/Angl. Soft Copy Of Printing Data For The Book To B E Collected From Consignee. One Sample Should Be Got Approved From Consignee Before Bulk Supply. Details Encl Osed At Annexure-A. Warranty Period: 30 Months After The Date Of Delivery
Supply, Installations, Testing And Commissioning Of Battery-Operated Rail Cum R Oad Vehicle For Shunting Of On Track Shunting Of Broad-Gauge Railway Vehicles Like Electrics/Diesel Locomotives. Wagon Coaches And Electric Multiple Units At Memu Shed, Mtd, Ju Division, Nwr.It Also Includes Supply Of Concomitant Accessories Of Battery Operated Rail Cum Road Vehicle For Shunting As Detailed In Clause 3 B & A Nnexure B Of Specification Appended With This Tender. Bidders Are Required To Attach The Price Break Up Of These Accessories In Pdf File Along With Submitted Bid. Optional Accessories As Per Para 6 Of Specification Appended With This Tender. Bidders Are Required To Attach The Price Break Up Of These Accessories In Pdf File Along With Submitted Bi Any Other Spares/Accessory Which Will Be Purely Need Based And Therefore, Their Rate Shall Not Be T Aken For Evaluation As Para 7 Of Attached Specifications. Bidders Are Required To Attach The Price Break Up Of Thes E Accessories In Pdf File Along With Submitted Bid
Supply of Locomotive Exterior Cleaning, Degreasing And Wiping Purpose Heavy Dut Y Industrial Cleaner/Degreaser Fluid. Type Of Fluid: Super Concentrated Alkaline Fl Uid Bio Degradable, Non-Hazardous, Non-Flammable, Non-Corrosive Suitable For Hig H Pressure Application In 5 Ltr Container.Make: Ultron Or Tropical Products And Ad Hesive Or Franmar Inc. Only Warranty Period: 30 Months After The Date Of Delivery
Supply of Msu Grease Nipple For Wap-7/Wag-9 Locomotives As Per Els/Royapuram/S.Rly.Drg.No.M/Els /Rpm/Sk-174 Warranty Period: 30 Months After The Date Of Delivery
Works Contract For Provision Of Modified Hinges In The Doors Of Electric Locomotives Available At Electric Locomotives Available At Electric Loco ShedErode.
Supply of Gasket For Water Pipe To Manifold To Emd Pt.No.40034634 Alt.Aa And To Dlw Pt.No.16170600 For Hhp Diesel Locomotives. Warranty Period: 30 Months After The Date Of Delivery
Supply of Banjo Flexible Rubber Hose With Embeeded Wire Braiding To Sae 100 R1 With Working Pressure Of 20 Kg/ Sq. Cm And Temperature/Oil Resistive. The Rubber Hose With Id 6 Mm And Od 12 Mm And With One End 1/ 4 Bsp Female Swivel Spherical Seating Fitments And The Other End With Banjo Wiper Servo Motor Connector Siut Able For Bg Electical Locomotives. Overall Length Of The Hose 700 Mm. Warranty Period: 30 Months After The Dat E Of Delivery
Supply of Set Of Ducting Assly For Wap-5 Locomotive As Per Clw Specn. No. Clw/Ms/3/ 048 Alt-6. Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Quick Coupling For Main Transformer Of 3 Ph. Locomotives As Per Clw Spec. No.- Clw/Es/ 3/0456 Alt.-J And Confirming To Clw Drg. No.- Clw/Es/3/Sk-4/0456 Alt.-C Consisting Of The Following Two Ite Ms-- 1 Male Coupling As Per Abb Id No.- Hstn 422023P003 01 No./Set. 2 Female Coupling As Per Abb Id No.- Hstn 422023P0013 01 No./Set. Warranty Period: 30 Months After The Date Of Delivery