Unlowering And Lowering Work Of Submersible Pump Set In Existing Tube Well Under Sub Dn. Udaipurwati Section Udaipurwati
Lowering Of 4000Gpm Pump Motor Set Of Sadbhavna Face For 03Times With Gradual Decreasing Of Water Level Of Sump And Maintenance Of The Above Pump And Its Pipe Line For Smooth Supply Of Water To Workers Colony And Nearby Village Under Amp Colliery
Lowering Of 4000Gpm Pump Motorset Of Jharnaface And Purba Face Pump And Extension Of Their Suction Due To Gradual Decreasing Of Water Level Of The Sump And Other Miscellaneous Pumping And Pipe Line Work Of Socp And Mocp Patch Under Amp Colliery
Supply Of 5 Hp Submersible Pump set At Gulbarga, 206 Supplying 5 Hp 8 Stage Submersible Pump Supplying And Lowering The 50Mm Hdpe Pipe Sf 3 Core 4 Sq Mm C Multistrand Copper Conductor Flat Cable Sf Ms End Clamps For The Submersible Pump Sl 12 Mm Nylon Rope Sitc Of Dol Starter
Providing, Supplying, Lowering, Laying, Jointing Rcc Np3 Pipe For Sewer Collecting System, Construction Of House Connection Chamber, Property Connections, Di-K7 Pipe For Rising Main, Construction Of Pumping Station With Screen Chamber, Supplying And Installation Of Pumping Machinery, Renovation Of Pumping Station, O And M Of Under Ground Drainage For Thasra Town Under Sjmmsvy Taluka:- Thasra,
Electrical Work In Connection With Rewinding, Repair Of Submersible/Hs Motor & Pump Sets And Lifting/ Lowering Of Submersible Water Pumps And Augmentation Of Pumping Installation At Kaushalya Over
Providing, Supplying, Lowering, Laying, Jointing Rcc Np3 Pipe For Sewer Collecting System, Sw Pipe With Construction Of House Connection Chamber With Property Connections, Di-K9 Pipe For Rising Main, Pumping Machineries, Reinstatement Of Roads And O & M Of 2 Years For Radhanpur Town Underground Drainage Ii Project. District: Patan Under Sjmmsvy
Working Survey, Soil Investigation, Design & Construction, Testing & Commissioning, Providing, Supplying, Lowering, Laying And Jointing Di/Rcc Pipeline Network, Providing House Connection, Construction Of Sub Pumping Station, Road Restoration, Pumping Machinery, Sewer Cleaning Equipment, Crosssing Work Etc. With Operation & Maintenance With All Allied Works For 5 Five Years Including 3 Three Years Defect Liability Period For Veraval Nagarpalika Under Ground Drainage Project