Deployment Of 1 No 15 Mt Or Higher Capacity Hydra Crane Including Operator Lubricant In Connection With Civil And Ug Piping Works For Pfcc Unit
Fw Piping Validation And Redesign At Jlbp
Replacement Of Critical Piping Hangers And Supports Stps, Stage-I&Ii
Supply Of Seal Tripple Lip, 232 0652340 Seal Assy, 28 6 00 01 00 0 0 1 Blade Shift Cyl Seal Kit, 28 06 00 04 00 0 0 Blade Lift Cyl Seal Kit, 232 63 25101 Seal Kit Ripper Cylinder, 705 52 10050 Seal Kit Rw Pump, 07108 20422 Hose Hyd, 07104 20408 Hose Hyd, 07102 20614 Hose Txn, 232 16 12100 Hydro Shift Txn Filter Assy, 281 16 11290 Element, 232 43 13162 Spring, 238 57 11000 Seal Assy, 232 40 58100 Steering Piping, 28 02 00 00 Fuel Pipe Assy, 118068 Oil Seal, 125776 Cap Screw, 30Z6180448ks Fuel Filter, 41Z7181537ks Fuel Filter, 31Z1280139 Element Inner, 31Z1280155 Element Outer, 116Hs02091 Hyd Filter, Cff0100048 Radiator Strainer, 31Z5180443 Cartridge Oil Filter, 07270 20485 Hose, 072271 01465 Hose Fuel Line, 10Z7180157 Hose Fuel, 31Z7102168 Stop Cable
Replacement Of Critical Piping Hangers And Supports For Stage
Supply of Complete Shell Assly For Wag-9Hc Locomotive With Pneumatic Piping Incl Uding Pneumatic Piping For Kavach Equipment, Painting And Top Operated Uncouplin G Arrangement For E-Type Cbc, Conforming To Drawing No. Ib031-00273, Alt-9, Specifica Tion No. Clw/Ms/3/152 Alt.10 And All Rdso Modification Sheets Attached With Tender An D Additional Items As Per Plw Doc No. El-29171027 Rev.-3. Warranty Period: 30 Months After The Date Of Delivery
Up-Gradation / Replacement Of Central Ac System At Ggrc Building I.E. This Includes Replacement Of Only Indoor, Outdoor Units And Operating Software Without Replacement Of Piping, Cabling, Power Supply Cables, Indoor To Outdoor Cabling, Piping For Gas And Stands / Fastners. Here Existing Duct Network And Cabling Will Be Utilized And Accordingly Additional Work Regarding False Ceiling Dismantling And Other Civil Work Will Be Reduced.
contract for Welding Of Pipe Joints And Fabrication And Welding Of Pedestal Assembly Of Mlos 250 Lpm 76 Lpm Mlo Piping
Handling, Transportation, Fabrication, Welding And Erection Of Stainless Steel Piping Works For High Level Liquid Waste Tanks And Supply Of Ss Pipe Fittings And Supporting Structural Members At Waste Tank Farm Area, Frp, Frfcf
Ethanol Biodiesel Tankage And Associated Piping And Civil Works.
Custom Bid For Services - Total Lumpsum Rate Considering Zero Rated Gst For Group A Osbl For Annual Service Rate Contract For Painting Of Rotary And Static Equipment Piping And Structure Etc Of Pta Plant Of Ms Gail Mangalore Petrochemicals Ltd Ms Gm.. Custom Bid For Services - Otal Lumpsum Rate Considering Zero Rated Gst For Group B Isbl For Annual Service Rate Contract For Painting Of Rotary And Static Equipment Piping And Structure Etc Of Pta Plant Of Ms Gail Mangalore Petrochemicals Ltd Ms Gmp..
Custom Bid For Services - Arc For Repair Rectification Replacement Of Damaged Above Groundunderground Fwsw Cw Piping And Foam Pourer Ring Lines Fire Water Sprinkler Ring Lines At Mathura Refinery
Pe Laying service Line And Lmc Gi Piping Works In Aurangbad, Rohtas And Kaimur Districts Ga Under State Of Bihar
Supply of One Set Of Ss Tubes And Double Ferrule For Brake Piping Arrangement Of Lhb Bogies As Per Icf Specification No. Icf/Md/Spec-166, Issue Status-01, Rev-04, Amd-01 & Amd 02 Or Latest, Consisting Of 1. Bulk Head Elbow With Conical Seating 3/4Od X M26 X 1.5M To Drg.No.Icf/Std-3-5-113, Item-1, Alt C Qty-3 Nos. 2. Bulk Head Elbow 3/4 Od To Drg. No.Icf/Std-3-5- 117 Item-1, Altb, Qty-L No. 3. Male Elbow With Conical Seating 1/2 Bsptm X M26 X 1.5M To Drg.No. Icf/Std-3-5-115, Item-1, Alt Nil, Qty-4 Nos. 4. Special Adaptor 1/2 Bs Pm X 1/2 Bspf To Drg. No. Icf/Std-3-5-116, Item-1, Altc, Qty-4 Nos. 5. Male Branch Tee Unio N With Conical Seating 3/4 Od X M26 X 1.5M To Drg.No. Icf/Std-3-5-132, Item-1, Alt Nil, Qt Y-L No. 6. Bulk Head Swivel Union 3/4 Od To Drg. No. Icf/Std-3-5-133-Item-1, Alt Nil Qty-2 Nos . 7. Union Tee 3/4 Od To Drg. No.Icf/Std-3-5- 018 Item-2, Altb, Qty-1 No. 8. Bulk Head Male Co Nnectorwith Conical Seating 3/4Od X M26 X 1.5M To Drg. No.Lwscwac-3-2-005, Item-1, Al T Nil Qty-2 Nos. 9. Ss Seamless Pipe 3/4 Od X 6000 Mm Astm A269 Gr.Tp 304 To Icf/Md/Spec-166, Issue Status-01, Rev-04, Amd-01 & Amd-02 Or Latest, Qty-L No. Warranty Period: 36 Months After Th E Date Of Delivery
Work Of Removing And Application Of Thermal Spray Insulation On Turbine Casing, Piping, Valves Etc In Ccpp # 1 & 2 At Dgbps During Coh And On As & When Required Basis.
Service Contract For Painting Of Fly Ash System Equipment And Equipments supporting Structure And Piping Of Stage 2 On Supply And Apply Basis
Procurement Of Hose Assembly With End Fitting For Air Piping To Emd Part No. 8200561 And To Dlw Part No. 17061 155 For The Maintenance Of Hhp Diesel Locomotives. Note: Sample To Be Approved Before Bulk Supply. Warran Ty Period: 30 Months After The Date Of Delivery
Carrying Out Fabrication, Supply And Application Of Shop Primer, Final Painting, Inspection, Testing, Transportation And Delivery Of Structural Steel Components To The Project Site In Connection With Civil And Structural, Ug Piping Works For Offsite
Sitc Of 2 X 6 Tr Dx Type Precession Air Conditioning System Including Necessary Associated Works Like Refrigerant Piping, Ducting, Etc.
Supply Of Pneumatic Air Blasters With All Accessories Like Solenoid Valves, Mounting Bracket, Safety Chain, Nozzles Etc., Local Control Panel Or Pneumatic Panels Or Jbs With Required Stainless Steel Impulse Or Pneumatic Tubing, Solenoid Valves, Filter-Regulator-Lubricator Unit, Sequential Timer And Accessories., Piping, Fittings, Valves And Instruments Etc, Erection And Commissioning Spares Including Fill Of Lubricants And Consumables, Maintenance Tools And Tackles, Any Other Item Not Indicated Above, But Required To Make The System Complete In All Respects., Control Panels-Air Break Switch, Control Panels-Aux Relays, Contactors - Auxiliary, Control Panels-Clustered Type Leds Of Different Colours, Control Panels-Push Buttons, Control Panels-Mcbs For Power And Control Circuits, Control Panels-Power Contactors, Control Panels-Timers, Control Panels-Thermal Over Load Relays, Control Panels-Power Fuses Of Each Type And Rating, Control Panels-Control Fuse Of Each Type And Rating, Control Panels-Current Transformer, Control Panels- Control Transformer, Control Panels-Control Switches, Control Panels-Indicating Meters, Control Panels-Terminal Blocks, Field Instrument -Complete Solenoid Valve Assembly, Field Instrument -Coil -Single Or Double Coil Type, Field Instrument -Gauge -Pressure, Differential Pressure, Temperature, Level, Field Instrument -Air Filter Regulator Complete Set With Pressure Gauges, Total Lump Sum Prices For Visits Should Include Travel Expenses To Or Fro Site Visa Or Insurance If Applicable. Also Refer Item Description For Details., Total Lump Sum Prices For Supervision Of Assembly, Erection And Commissioning Including Local Transportation, Boarding, Lodging And Other Related Expenses