Replacing Of Points & Crossings With 60Kg Psc Layout In Place Of Existing Steel 52Kg Layout For Point No. 22 & 23 In Marshalling Yard.
I Ctr S 2.784 Km Up Loop At Lidhora Khurd And Dn Loop At Saugor, Makronia, Lidhora Khurd & Trr 0.86 Km Between 983.615 To 984.475 On Makronia-Agasod, Ii Tfr 30.70 Km On Bina-Katni And, Iii Tfr Of Points And Crossing On Bina-Katni Section
Dismantling And Erection Of 3.3Kv O/H Line Due To Crossing To Feeding Power Of Domestic Water Supply 2000Gpm Motor Pump In River Side And Extension Of 3.3Kv O/H Line For Lighting Purpose In 3Rd Patch View Point Socp Muraidih, Amp Colliery
Provn Of Three Phase Sub Main Wiring In Bldg, 290 Supply And Fixing Of Sub Main Wiring 3 Run Of 6 Sqmm Core Multi Std Pvc Insulated All As Per Ser No 1 Above But For Wiring With 2 Run Of 4 Sqmm And 1 Run Of 4 Sqmm M And L For Earthing Complete In Galvanished Iron Mild Steel Earth Plate Excavating In Trenches Not Exceeding 1 Point 5 Meter Wide And Depth Returning Filing In Including Spreading Levelling Watering Removing Excavating Material Soil Not Exceeding 50 Mtr Supply And Fixing Of Pipe In Trenches In Road Crossing Supply And Fixing In Replacement Of Security Light Fitting Led 45 Watt Bulb With Senson. Supply And Fixing Mccb Incomer Distribution Board Double Door Vertical Type
Laying And Linking Of Bg Main Lines/Loop Lines/Sidings, Including Points And Crossings, Spreading Of Stone Ballast, Tamping Of Track, Transportation Of P.Way Materials And Other Ancillary Works From Km. 0.00 To Km. 34.00 In Connection With Taranga Hill - Abu Road Via Ambaji New Bg Line Project
Custom Bid For Services - Spraying Of Water For Dust Suppression Over Surface Of Approach Road In Nh7 Junction Point To Railway Crossing Including Loading Platform At Dumri Railway Siding Under Kamptee Sub Area
Supplying And Laying New Point & Crossing Set With Psc Sleeper & Required Fixtures For 52/60 Kg Standard Size Rail At Railway Yard
Ttrtws+Wcmsc Complete Renewal Of Points & Crossing Of On Psc Sleepers In The Section Of Sr.Den-Iv On Dli-Bti Section.
Manual Deep Screening Of Track, Points & Crossings And Other Enabling Works Under The Jurisdiction Of Ssep.Way/Dhenkanal
Deep Screening Of Turnouts 37 Nos. 1 In 12 & 28 Nos. 1 In 8.5 Under The Jurisdiction Of Sr.Den/East/ Nagpur. 2 Casual Renewal Of Switches Under The Jurisdiction Of Aden/Dongargarh. 3 Sleeper Renewal Of Point & Crossing Sets 1 In 12 33 Nos And 1.8.5 4 Nos In Various Yard In Dug-G Section Under The Jurisdiction Of Aden/Dongargarh.
Reconditioning Of Point, Crossing And Sej With H3c
Construction Of Boundary Wall At Nelamangala Nmga At Km 13/300-14/000, Kunigal Kigl At Km 58/200-550 On Lhs And Rhs, Yediyuru Yy At Km 75/800-76/200 On Lhs And Rhs And B G Nagar Bgnr At Km 90/000-550 On Lhs Stations In Aden/Kunnigal Sub-Division. Sw Ii : Shravanabelogala Sbga Station : Proposed Construction Of Platform Toilet At Pf-1. Sw Iii : Construction Of Rcc Drain For A Length Of 1500M In Connection With The Work Of Bengaluru-Salem Sec : Through Ballast Recoupment Of Points And Crossings 10 Nos At Hosur Hsra Yard In Aden/Dharmapuri Section. Maintenance Period Is 6 Months
Manufacturing, Supply And Stacking Of Machine Crushed Track Ballast Including Leading And Loading At Periya Naga Thunai Prnt Depot Quantity 21, 150 Cum In Connection With The Work Of A Bengaluru-Salem Section : Increasing Sleeper Density Of Existing 52Kg Psc Sleepers Of 1310/Km To 1540/Km For A Length Of 9.565Km In Loop Lines Of Aden/Dharmapuri, B Chikka Banavara - Hassan Section : Through Ballast Recoupment Of Points And Crossings At Nelamangala Nmga Yard - 08 Nos., C Through Ballast Recoupment Of Points And Crossings At Dharmapuri Dpj, Rayakottai Ryc, Periya Naga Thunai Prnt, Kelamangalam Kmlm And Banaswadi Band Yards - Total 11 Nos., D Bengaluru - Salem Sec : Through Ballast Recoupment Of Points And Crossings 10 Nos., At Hosur Hsra Yard. Sw Ii : Bengaluru - Salem Sec : Supply And Dumping Of Ballast In Connection With The Work Of Construction Of Track Machine Siding At Rayakottai Ryc Station In Aden/Dharamapuri Section.
Cleaning And Lubrication Of Slide Chairs Of Interlocked Points And Crossings In Adste/Pgt Section Madukkarai- Mankara, -Kinattukkadavu One Year.
Cleaning And Lubrication Of Slide Chairs Of Interlocked Points And Crossings In Adste/Clt Section Lakkiti-Thalassery, Shoranurjn-Nilambur Of For One Year.
Cleaning And Lubrication Of Slide Chairs Of Interlocked Points And Crossings In Dste/Maq Section Etakkot-Mangalore Central-Panambur Of For One Year.
Jeypore -Malkangiri New Railway Line Project: Construction Of New Bg Railway Line Between Jeypore 0.85 Km From Csb To 41.5 Km Involving Earthwork In Formation In Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges, Road Over Bridges Robs, Road Under Bridges Rubs, Protection Works, P.Way Track Works With Contractors Own Material Supplies Including Supply Of Track Ballast, New Wide Based Psc Sleepers, Special Psc Sleepers For Turnouts, Improvised Sejs, Guard Rails Etc, Points Thick Web Switches & Wcms Crossings, Glued Joints, H- Beam/Composite Sleepers Over Girder Bridges, Improvised Sejs, All P-Way Fittings, Ohe Foundations, Supply And Erection Of Ohe Masts, Modification/Conversion To Underground For Overhead Electrical Ht/Lt Power Line Crossings, Construction Of Platforms, Station Buildings, Service Building, Sp/Ssp Buildings And Residential Buildings, Water Supply, Indoor And Outdoor Electrification Etc On Epc Basis