Supply of Set Of Polyester Slings As Per Specification No.Poh/Wheel/ Rsp/Oot/2022-23/ Sling Warranty Period: 30 Months After The Date Of Delivery
Supply of 24 Polyester Webbing Slings Q4
Supply of 14 Polyester Webbing Slings Q4
Supply of Sling Set To Lift Vcb, Sling Set High Tenacity 100% Polyester Multileg 4 Leg Ged Flat Webbing With Reinforced Eyes At Both Ends Of Capacity 01 Ton, Length 01 M Eter Loop To Loop, One End Of Each Leg Fitted With Common O Ring 138 X 25 Mm Of 01 Ton Capacity And Other Ends Of Sling Will Be Fitted With D-Shackle Of 01 Ton Capacit Y. Safety Factor Of Sling: 7:1. Note: Firm Should Submit Test Certificate From Govt/Na Bl Accredited Lab Along With Material. Warranty Period: 12 Months After The Date Of Delivery
Supply of Polyester Round Slings Q4 Polyester Webbing Slings Q4
Procurement Of Slings Chain Pulley Blocks And Shackles For Pta Plantgmpl - Polyester Round Sling Endless, 10 Ton X 5 M Eff, Polyester Round Sling Endless, 10 Ton X 10 M Eff, Polyester Round Sling Endless, 15 Ton X 5 M Eff, Polyester Round Sling Endless, 15 Ton X 10 M Eff, Polyester Round Eye And Eye Sling, 5 Ton X 5 M, Polyester Round Eye And Eye Sling, 5 Ton X 10 M, Polyester Round Eye And Eye Sling, 10 Ton X 5 M, Polyester Round Eye And Eye Sling, 10 Ton X 10 M, Polyester Parallel Lane Round Eye And Eye Sling, 15 Ton X 5 M, Polyester Parallel Lane Round Eye And Eye Sling, 15 Ton X 10M, Polyester Parallel Lane Round Eye And Eye Sling, 20 Ton X 5 M, Polyester Parallel Lane Round Eye And Eye Sling, 20 Ton X 10 M, Polyester Parallel Lane Round Eye And Eye Sling, 30 Ton X 5 M, Polyester Parallel Lane Round Eye And Eye Sling, 30 Ton X 10 M, Polyester Parallel Lane Round Eye And Eye Sling, 40 Ton X 5 M, Polyester Parallel Lane Round Eye And Eye Sling, 40 Ton X 10 M, Polyester Parallel Lane Round Eye And Eye Sling, 50 Ton X 5 M, Polyester Parallel Lane Round Eye And Eye Sling, 50 Ton X 10 M, Polyester Double Ply Flat Woven Webbing Sling, 1 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 2 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 5 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 5 Ton X 10 M, Polyester Double Ply Flat Woven Webbing Sling, 10 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 10 Ton X 10 M, Polyester Double Ply Flat Woven Webbing Sling, 15 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 15 Ton X 10 M, Polyester Double Ply Flat Woven Webbing Sling, 20 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 20 Ton X 10 M, Polyester Double Ply Flat Woven Webbing Sling, 30 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 30 Ton X 10 M, Polyester Double Ply Flat Woven Webbing Sling, 40 Ton X 5 M, Polyester Double Ply Flat Woven Webbing Sling, 40 Ton X 10 M, Wire Rope Sling, 1 Ton X 1 M, Wire Rope Sling, 1 Ton X 2 M, Wire Rope Sling, 2 Ton X 3 M, Wire Rope Sling, 3 Ton X 3 M, Wire Rope Sling, 5 Ton X 3 M, Wire Rope Sling, 5 Ton X 5 M, Wire Rope Sling, 10 Ton X 6 M, Wire Rope Sling, 15 Ton X 8 M, Wire Rope Sling, 20 Ton X 10 M, Wire Rope Sling, 75 Ton X 10 M, Chain Pulley Block, 2 Ton X 5 M, Chain Pulley Block, 3 Ton X 10 M, Chain Pulley Block, 5 Ton X 8 M, Chain Pulley Block, 10 Ton X 8 M, Chain Pulley Block, 15 Ton X 8 M, D-Shackle, Screw Pin Type, 1 Ton, D-Shackle, Screw Pin Type, 2 Ton, D-Shackle, Screw Pin Type, 3.2 Ton, D-Shackle, Screw Pin Type, 5 Ton, D-Shackle, Screw Pin Type, 8 Ton, D-Shackle, Screw Pin Type, 10 Ton, Dshackle, Screw Pin Type, 16 Ton, D-Shackle, Screw Pin Type, 20 Ton, D-Shackle, Screw Pin Type, 32 Ton, D-Shackle, Screw Pin Type, 40 Ton, D-Shackle, Screw Pin Type, 50 Ton, Bow Shackle, Screw Pin Type, 3.2 Ton, Bow Shackle, Screw Pin Type, 5 Ton, Bow Shackle, Screw Pin Type, 10 Ton, Bow-Shackle, Screw Pin Type, 16 Ton, Bow-Shackle, Screw Pin Type, 20 Ton, Bow-Shackle, Screw Pin Type, 32 Ton, Bow-Shackle, Screw Pin Type, 40 Ton, Bow-Shackle, Screw Pin Type, 50 Ton
Supply of Four Leg Polyester Webbing Sling Of Each Leg 2 Ton Capacity X04 Mtr Leng Th And Swl-3 Ton, Should Have One Master O Ring Dia 36 Mm, Id:200 Mm And Two Sub O Ri Ngs Of Suitable Capacity And To Be Supplied With D Shackle And Hooks Of Suitable Ca Pacity. Make: Simplex Or Samson Or Safelift Or Ctlt Only. Note: Firm Should Submit T Est Certificate From Govt/Nabl Accredited Lab Along With Material Warranty Period: 30 Months After The Date Of Delivery
Supply of 100 % High Tenacity Heavy Duty Polyester Multileg 3 Legged Sling Set. Each Leg Length 6 Feet Loop T O Loop & Capacity 2Ton. One End Of Each Leg Fitted With Common O Ring Of 02 Ton Capacity And Other Ends Of Slin G Will Be Fitted D-Shackle. Master Ring:10Ton. Safety Factor 7:1. Make-Samson, Sling Set, Ferreterro, Sim Plex Warranty Period: 30 Months After The Date Of Delivery 100 % High Tenacity Heavy Duty Polyester 2 Leg Two Legged Sling Set. Each Leg Length Size 1 Meter Loop To Loop & Capacity 2Ton. One End Of Each Leg Fitted With Common O Ring Of 02 Ton Capacity And Other Ends Of Sling Will Be Fitted D-Shackle. Master Ring : 08 Ton. Safety Factor 7:1. Make-Samson, Sling Set, Ferreter Ro, Simplex Warranty Period: 30 Months After The Date Of Delivery
Supply of Prototype Telescopic Boom Crane Complete With Match Truck/Wagon And All Accessories Such As Lifting Beam Of 120 T Capacity And Light Weight Polyester Slings, Steel Wire Ropes, Chains & Tools Scope As Per Clause 1.2.3 Of Rdso Specification, As Detailed At Clause 3.1.1, 3.2 & 3.5 Respectively Of Rdso Specification Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. List Of Items With Their Individual Costs To Be Enclosed In The Price Bid Warranty Period: 78 Months After The Date Of Delivery Cost Of Preventive Maintenance Charges For Bm1 During Warranty Period As Per Clause 3.11 Of Rdso Specification And Clause 15 Of S Ection 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Bm1for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Section V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Manufactured / Assembled Telescopic Boom Cranes Complete With Match Truck. Wagon And All Accessories Such As Lifting Beam Of 120 T Cap. And Light Weight Polyester Slings, Steel Wire Ropes, Chains & Tools Scope As Per Clause 1.2.3 Of Rdso Specification, As Detailed At C Lause 3.1.1, 3.2 & 3.5 Respectively Of Rdso Specification Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential T O Make The Crane Fully Operational. List Of Items As Per Cl. 1.2.3 Of Rdso Specification, Assemblies/ Sub-Assemblies For Fabricated Goods With Their In Dividual Costs To Be Enclosed In The Price Bid Warranty Period: 78 Months After The Date Of Delivery Cost Of Preventive Maintenance Charges For Bm2 During Warranty Period As Per Clause 3.11 Of Rdso Specification And Clause 15 Of S Ection 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Bm2 For A Period Of 5 Years After Warranty Period As Per Clause 16 Of Section V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Special Lifting Beam Of Min. 175 T Capacity Along With Slings, Scope Of Supply As Per Clause 1.2.3 Ii, As Detailed At Clause 3.1.2 Of Rd So Specification Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. Warr Anty Period: 78 Months After The Date Of Delivery Tunnel Fork Attachment Mountable To Telescopic Jib, Scope Of Supply As Per Clause 1.2.3 Iii, As Detailed At Clause 3.3 Of Rdso Specif Ication Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. Warranty Peri Od: 78 Months After The Date Of Delivery Cost Of Preventive Maintenance Charges For Special Lifting Beam Esp1 During Warranty Period As Per Clause 3.11 Of Rdso Specifica Tion And Clause 15 Of Section 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Special Lifting Beam Esp1for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Section V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Cost Of Preventive Maintenance Charges For Tunnel Fork Attachment Esp2 During Warranty Period As Per Clause 3.11 Of Rdso Spe Cification And Clause 15 Of Section 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Tunnel Fork Attachment Esp2for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Secti On V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Crane Training Simulator, Scope Of Supply As Per Clause 1.2.3 Iv, As Detailed At Clause 3.4 Of Rdso Specification Inclusive Of Any Othe R Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. Warranty Period: 78 Months After The Dat E Of Delivery Cost Of Preventive Maintenance Charges For Crane Training Simulator Esp3 During Warranty Period As Per Clause 3.11 Of Rdso Spe Cification And Clause 15 Of Section 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Crane Training Simulator Esp3for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Sect Ion V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Cost Of Training At Manufacturers Works Ref. Clause 4.7.1 Of Rdso Specificationfor 800 Man Days Cost Of Training At Designated Place In India Ref. 4.7.3 Of Rdso Specification For 2000 Man Days