Rectification Of 15 Nos. Old Pontoon 6.6 M X 6.6 M X 0.90 M By Assembling 121 Nos. Empty Drums On Each Pontoon At Quarry Of Gevra Project.
Fabrication Of New Pontoon 02 Nos. In Complete Aspect, Repairing Of Existing Floating Drum Structures 04 Nos., Making Of Sheds On Pontoons To Be Installed For Monsoon 2024 04 Nos. At Bina Project
Custom Bid For Services - Fabrication Of Water Floating Foundation Base Pontoon Having 16 Pvc Barrels Including Supply Of Air Tight Pvc Barrels Of 210 Ltr Capacity At Umrer Ocm Of Umrer Sub Area
Supply Of 3 Anodes Below Pontoon Deck Q3 On Board Spares & Commissioning Spares For Sacp System Q3
Custom Bid For Services - Installation And Shifting Of Ht Pumpmotor Set Either On Pontoon Or On Surface As Per Site Requirement Including Pumping Operation In All The Three Shifts Of Ht Pumps At Different Locations Sum Coal Faces In Quarries For Dew..
Repairing, Testing, Commissioning And Dismantling Of Pontoon And Also Fabrication Of 02 Nos. New Pontoon In East And West Section At Enm Field Nigahi Project During Monsoon-2024.
Supply of 6 Hdpe Heavy Duty Pontoon Q3 Jetting Hose With Flange On Both Ends Q3