Providing Earth Continuity By Rabbit Conductor In 11Kv And 3.3Kv Overhead Line Of Topa Project Under Kuju Area.
Supply Of Acsr Rabbit Conductor
Supply of 11kV and 33kV Isolators as per POWERGRID tech specs, 43 Supply of 12kV, 630A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, double break Isolator without Earth Switch along with terminal connectors suitable for Rabbit conductor at Hyderabad SS , Supply of 12kV, 630A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, double break Isolator without Earth Switch along with terminal connectors suitable for Rabbit conductor at Nsagar SS , Supply of 12kV, 630A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, double break Isolator without Earth Switch along with terminal connectors suitable for Rabbit conductor at Kadapa SS , Supply of 36kV, 1250A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, Double Break Isolator without Earth Switch along with terminal connectors suitable for Dog conductor at Munirabad SS , Supply of 36kV, 1250A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, Double Break Isolator without Earth Switch along with terminal connectors suitable for Dog conductor at Khammam SS , Supply of 36kV, 1250A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, Double Break Isolator without Earth Switch along with terminal connectors suitable for Dog conductor at Gooty SS , Supply of 36kV, 1250A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, Double Break Isolator without Earth Switch along with terminal connectors suitable for Dog conductor at Vijayawada SS , Supply of 36kV, 1250A, 25kA 3Sec, 31mm by kV minimum creepage distance, 3 Phase, Double Break Isolator without Earth Switch along with terminal connectors suitable for Dog conductor at Vizag SS
Work Of Re-Conductoring Of 33 Kv Line Rabbit To Coyote From Chowdapur Four Pole Structure To Ankalga 33/11 Kv Sub-Station For 14 C. Kms 14 X 3 Equals 42 Kms Conductor On Partial Turnkey Basis In Which 20 Kms Coyote Condcutor Will Be Supplied Departmentally In C&M Division
Work Of Re-Conductoring Of 33 Kv Line Rabbit To Coyote From 110 Kv Mandewal Sub-Station To 33/11 Kv Nelogi Sub-Station In Jewargi Taluka In C&M Sub-Division-Ii, Gescom, On Total Turnkey Basis