Laying Of Rcc Pipeline From Pond Near Bnrgsk To Pond Near Gaushala At Village Sherpura Block Nathusari Chopta, Distt. Sirsa Zp
Repairing Of Rcc And Wall Surface, Replacement Of External Water Supply Pipelines Damaged G.I. Tank At Bhangakuthi, Coaxial Station,
Constructing Rcc Np3 Pipeline For Connecting Existing Nathwadi-Asjol P2 Pipeline To Gokulpura Village Tank And Connecting Existing Hingalajpura-Saduthala Pipeline To Saduthala Sim Tank. Ta. Jotana
Carring Out Survey And Soil Investigation Work For Constructing Rcc Np3 Pipeline For Connecting Existing Nathwadi-Asjol P2 Pipeline To Gokulpura Village Tank And Connecting Existing Hingalajpura-Saduthala Pipeline To Saduthala Sim Tank. Ta. Jotana
Formation Of Industrial Layout Including Formation Of 24M, 18M & 15M Wide Road, Including Asphalting, Construction Of Rcc Side Drains, Utility Duct And Hdpe Water Supply Pipeline At Aliyabad Industrial Area, 3Rd Phase
Formation Of Industrial Layout Including Formation Of 24M & 15M Wide Road, Including Asphalting, Construction Of Rcc Side Drains, Utility Duct And Hdpe Water Supply Pipeline At Aliyabad Industrial Area, 3Rd Phase
Formation Of Industrial Layout Including Formation Of 60M Wide Road, 30M Wide, 24M Wide Roads With Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Hdpe Dual Water Supply Pipe Lines, Ugd Pipeline Network, Construction Of Iccc Building Etc., At Sector-1 Of Phase-2
Formation Of Industrial Layout Including Formation Of 60M Wide Road, 32M Wide, 30M Wide Roads With Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Hdpe Dual Water Supply Pipe Lines, Ugd Pipeline Network Etc., At Sector-2 Of Phase-2
Formation Of Industrial Layout Including Formation Of Plots, Formation Of 60M, 32M, 30M Wide Roads With Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Hdpe Dual Water Supply Line Ugd Pipeline Networks & Lake Improvement Etc., At Sector-3 Of Phase-2 Industrial Area
Providing Of Construction Material – Sand, Grit, Quarry Waste, Jcb, Metal, Rubber, Machine Cut, Morum, Powder, Pono, Grit Etc, Pvc Pipeline And Galvanize Pipe Line, Rcc Pipe
Augmetation Of Hadaf Regional Water Supply Scheme Taluka : Limkheda, Singwad Dist. : Dahod Const. Of Providing, Supplying, Lowering, Laying And Jointing Di/Pvc Pipeline As Rising/Gravity Main, Designing Constructing Wtp, Constructing Rcc Esr/ U/G Sumps, Pump House, Quarters, Compound Wall, Village Level Sumps & Pump Room Including Connecting Line At Various Village & Pumping Machineries And Electronification At Various H/W Or Sub H/W Under Augmentation Of Hadaf Regional Water Supply Scheme With Ten Year O & M Turn Key Project
Supply Of Distribution Pipeline With Hydraulic Testing Work And Rcc Work
Working Survey, Soil Investigation, Design, Build & Operate With Trial Run Of 3 Months Contract For Providing, Supplying, Lowering, Laying & Jointing Rising Main, Gravity Main And Distribution Pipeline, Supply, Installation, Testing & Commissioning Of Hscf/Vt Pump With Associated Mechanical And Electrical Equipment’S, Instruments & Accessories, Clear Water Sump, Elevated Service Reservoir, Pump House, Staff Quarter, Compound Wall, Approach Road Rcc At Various Hw/Shw/Village With Operation & Maintenance Of All Type Of Civil Structures, Mechanical Equipment & Pipeline Network For 10 Years For 180 Villages Under Dang Regional Water Supply Scheme Pkg-3 Based On Tapi River
Extension Of Pvc Pipeline And Maintenance Of Existing 450 Mm Rcc Main Line Including Supply Of Material And Installation Of Pump House, Field Channel Of Charsundorpur Govt. Owned Major Rli Under Kalyani Agri-Mechanical Division
Restoring Of Jalundra-Madhavgadh 2350Mm Id And 14Mm Thick Ms Pipeline With Encasing And Shifting Bf, Sv, Air Valve And Rcc Chambers Due To Crossing Of 60Mt Tp-3 Bt Road Of Auda At Ch.6750Mt Near Village Dahegam.
Constructing Underground Rcc Np2 600 Mm Pipeline Drain For Dewatering Of Flood/Logged Water In Village Dhabi Kalan From Rd 37000 To 0 Outfalling At Rd 170550/174100-R Hisar Ghaggar Multipurpose Channel Dhabi Kalan Drain Rd 37000 ...
1 Formation Of Industrial Layout Including Formation Of 24M And 15M Wide Asphalt Roads Including Construction Of Rcc Side Drains, Utility Duct And Hdpe Water Supply Pipelines In Aliyabad Industrial Area 3Rd Phase, 2 Formation Of Industrial Layout Including Formation Of 24M, 18M And 15M Wide Asphalt Roads Including Construction Of Rcc Side Drains, Utility Duct And Hdpe Water Supply Pipelines In Aliyabad Industrial Area 3Rd Phase.
Laying Of Rcc Pipeline From Prem Punia To Pond At Village Kheri, Block Nathusari Chopta
Laying Of Rcc Pipeline From Bhagat Singh Chowk To Pond At Village Rampura Dhillon, Block Nathusari Chopta
Purchasing Pipeline & Lowering, Laying And Jointing Pvc Pipe Line And Purchasing Valve And Fitting For Distribution Pipeline With House Connection, Constructing Rcc Esr 75000 Ltr, Constructing Rcc Sump 160000 Ltr, Rising Main Pipeline, Constructing Pump Room, Cattle Trough 4 Nos., Exi Well Repairing 2 No, Pumping Machinery 2 No & Fencing Around Water Head Work At:- Latuda, Taluka:- Wadhwan