Formation Work And Laying Of Gsb For Road From Wb No. 14 Towards Rest Shelter Under Magadh Ocp Of Magadh-Sanghmitra Area
Repair And Restoration Of Toilets To Shelter For Urban Homeless In Ward No.34.
Day To Day Cleaning And Up Keeping Of Mtk Office, Rest Shelter Rooms Of Dozer Section, Excavation, Dumper Shed, Unit Store, And E And M Workshop At Lakhanpur Ocp Of Lakhanpur Area For A Period Of 1 Year
Heightening Of Interior And Exterior Walls, Roof Sheeting In Store Room, Making Store Shed, And Renovation Of Rest Shelter Of Dozer Section In Khadia Project
Supplying And Installation Of 6 Nos. Portable Rest Shelter Cabins Of Size 20 Feet X 10 Feet With Toilet Facility For North Urimari Project, Barkasayal Area.
Construction Organization Left Over Works In Connection With Proposed 3Rd Line With Electrification Between Kazipet - Kondapalli Stations - Transportation Of P. Way Materials, Proposed Laying And Linking Of Bg Track, Assembling And Insertion Of Points & Crossings, Supplying Leading And Dumping Of Stone Ballast, Welding Of Rails, Fabrication And Insertion Of 60 Kg Glued Insulated Rail Joints And Execution Of Miscellaneous Works From Km.542.00 To Km.568.00 At Errupalem, Gangineni And Cheruvumadhavaram Stations. Provision Of Loop Lines, Extensions Of Bridges And Misc. Works In Connection With Phase-2 Works In Cvv, Gnn & Yp Yards And Their Approaches. Provision Of Pf Shelters, Extension And Provision Of Platforms, Approach Roads, Track Machine Rest Rooms At Sidings, Ssp Buildings And Misc. Works In Connection With Works In Cvv, Gnn & Yp Yards And Their Approaches