Picking Of Shale Stone From Pit Head Stone Yard No. 1 Railway Siding And Stacking The Same With In A Lead Upto 50M Under Tilaboni Colliery
Manufacturing, Supplying & Stacking Of 50 Mm Size Of Machine Crushed Track Ballast Of Approved Quality Conforming To Latest Rdso Specifications Within Railway Boundary All Along The Section And Manufacturing, Supplying & Loading Of 50 Mm Size Of Pakur Variety Machine Crushed Stone Ballast Of Approved Quality Conforming To Latest Rdso Specifications From Quarry Pakur/Talijhari/Bakudi/Sahibganj/Pinergaria For The Yard Section And All Other Connected Ancillary Works As Per Requirement In Between Stations Katihar Including And Sonaili Including From Ch: Km 0.00 To Km 17.30 Of Katihar-Mukuria Section And Katihar Excluding And Pranpur Road Including From Ch: Km 1.388 To Km 19.70 Of Katihar- Kumedpur Section In Connection With Katihar-Mukuria-Kumedpur Double Line Project Of N. F. Railway Construction.
Custom Bid For Services - Hiring Of Equipmentsvehicles For Unloading Of Iron Steel Material From Wagons Truckstrailors At Sssy, Custom Bid For Services - Hiring Of Equipmentsvehicles For Loading Of Iron Steel Material In Wagonstruckstrailors At Sssy, Custom Bid For Services - Shifting Stacking Of Iron Steelmaterial Within The Stock Yard Todemarcated Area As When Requiredby Mechanical Means
Handling Transport And Other Mining Services - Percentage Quote Based - Removal Of Spillage Loose Coal On Surface Below Belt Conveyor At Stock Yard And Stacking The Same At A Distance Of 50M Heao No2a Of Katkona 1 2 Incline
Supplying And Stacking Of Ballast At Nandikoor Station Yard And Loading Into Krcl Hoppers For Ctr Works Under Sen/Udupi Section In Senior Regional Engineer, Karwar Region Of Konkan Railway Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable Extra As Applicable.
Turnkey Mining Contract Involving Overburden/ Inter Burden Removal, Excavation And/Or Loading Of Lignite From Mines Face And Ancillary Activities At Damlai Lignite Project, Bharuch. Lignite Excavation & Loading Equals To 162.5 Lakh Mt Ob/Ib Removal Equals To 1870 Lakh M3 2. Combined Work Of Transportation Of Lignite From Mine Face To Surface Stack Yard And Loading Of Lignite There From Of 41 Lakh Mt 3. Excavation And Transportation Of Loose Ob From Inside The Pit To The Dumps And Ancillary Activities Of 47 Lakh M3 Above Quantities Are Tentative And Indicative Only And May Vary At The Time Of Execution Of Actual Work.