Construction Of Substructure And Superstructure Of Major Bridge No. 21B 4X18.3M Composite Girder On Permanent Diversion At Km 11/516 Along With Construction Of Permanent Diversion, Construction And Extension Of Lhs No 16 1X6.00X3.6M At Km 11/778 Between Mhrl-Cdna, Construction Lhs No. 35A 1X5.00X 2.50M At Km 27/600, Lhs No. 38 1X5.00X3.00M At Km 20/800 Between Vph-Khtn And Protection Of Bank Along The Waterbody At Various Locations And Other Miscellaneous Works In Between Jjp And Lkq Stations In Connection With Gauge Conversion Of Jhanjharpur-Laukaha Bazar Section
Providing Device At The Interface Of Superstructures Or Superstructures And Substructure, Along With Installation And Validation, To Mitigate The Increased Longitudinal Force On The Bridge 163, 440 & 442, Resulting Due To Higher Tractive Efforts Exerted By New Generation Locomotives