Tenders for Installation Of Wet Lime Stone Based Flue Gas Desulphurization System Inclusive Of Design, Engineering, Manufacture, Procurement, Inspection/ Testing At Manufacturers Works, Supply, Packing, Delivery At Site, Fabrication, Erection, Interconnection With The Existing Units, Pre-Commissioning, Testing, Commissioning Of The System Including Associated Civil Works, Complete Electrical And C&I Systems On Turnkey Basis And Performance Testing Along With All Auxiliaries & Accessories, Supply Of Special Tools & Tackles & Mandatory Spares In Order To Reduce The Sox Emission To Comply The New Environmental Norms For 1X600mw Unit Of Mettur Thermal Power Station Ii Under Single Epc Basis