Construction Of New Tower With Pile Foundation And Associated Work In Place Of River Eroded Tower At Loc-160 Of 132 Kv Dhaligaon-gossaigaon Line
Implementation Of Fibre Optic Terminal Equipment For Connectivity Of Lkhep Generating Station With The Existing Fiber Optic Network Of Aegcl From 132Kv Shankardevnagar Gss Aegcl
Printing Of Pocket Voter Guide
Supply, Erection And Installation Of Opgw Against The Work Of Height Raising Works At 132Kv D/C Kahilipara-Rangia And 132Kv Sishugram-Pbsl Transmission Line Against Apwd Bridge At North Ghy. Supply Of Opgw Against The Work Of Height Raising Works At 132Kv D/C Kahilipara-Rangia And 132Kv Sishugram-Pbsl Transmission Line Against Apwd Bridge At North Ghy.
Construction Of 132 Kv D 0 Tower 01 No On Pile Foundation In Place Of River Eroded Tower At Loc. No. 136 Of 132 Kv Dibrugarh-tinsukia Line Dddassociated Works