Design, Manufacturing, Supply, Installation, Testing And Commissioning Of Lot-1 Heavy Duty Machine Room Less Elevators, Lot-2 Escalators For Phase-2 Of Metro Rail Project
Height Raising Of Existing 110Kv Lonavala Khadki Pune Single Circuit Se1 Overhead Railway Transmission Line Between Metro Pier Location P444.P445, Work Includes Engineering, Supply, Erection, Testing, Commissioning `And Dismantling Of Existing Towers.
Design And Construction Of Elevated Metro Viaduct For Nmrp Phase-2 In I. Between Ch - 7577.056 M To Ch - 13457.046 M Of Length 5.9 Km In Reach 2B Ii. Between Ch 18218.586 M To Ch 24633.194 M Of Length 6.414 Km In Reach 3A Iii. Between Ch - 289.