Supply, Cleaning, Fitting, Welding, Erection And Pressure Hold Test Of The Piping Works For Pneumatic Line Including Oil Filters And Two Nos. Desiccant Air Dryers At Cryogenic Plant, Vecc. Pneumatic Line Fabrication.
Onsite Replacement Of 4 Inch Ro Membrane From Frp Pressure Vessel For Existing Ro Plant
Operation And Maintenance Of Other Machines And Plants - Complete System
Epoxy Flooring And Pu Painting At Scc Building Including Other Miscellaneous Civil Works In Different Labs At Bidhannagar Campus Of Vecc
Annual Maintenance Service -Data Center Assets - Server With Enterprise Storage; Server With Enterprise Stoarge; As Oem Oem Authorised Service Provider Neither Oem Nor Asp
Fabrication, Supply And Installation Of Pipelines To Connect Chiller And Cryocooler Compressor At Vecc
Facility Management Service - Outcome Based