Eligibility Criteria - 20610215

022520

Check Eligibility Criteria

Check your eligibility criteria for tender Floated To Carry Out 24 Inch Or Jetty Pipeline Repair Work By Cold Welding Method.Please Refer Full Tender Document For Specifications, Gtc, Payment Terms, Etc.Scope Of Jobcold Weld Pipeline Procedure For Online Repair Of Leakage In Pipelines. Surface Preparation Removal Of Paint From The Surface Using Suitable Paint Remover Paint Strippers. Water Wash The Surface To Remove All Traces Of Paint Remover And Oil And Grease Or As Recommended By Vendor. Sspc S1 Water Solvent Wash For Degreasing And Cleaning. Sspc S2 Hand Tool Cleaning. Ensure That All The Grease, Dirt, Salts And Chemical Deposition Has Been Completely Removed. Wash The Surface With Fresh Water If Required. All Precautions Will Be Taken While Cleaning The Surface To Avoid Any Damage To The Surface. Only Brass Non Sparking Tools To Be Used For Surface Preparation.Application Method Leakage Sealing Will Be Done Using Combination Of Fast Curing Polymers, Epoxys Tick And Compatible Sealants And Required Tools. A Leakage Sealing System Shall Be Able To Seal The Leakage While The Hydrocarbon Is Leaking Under Pressure. The Products Used Should Be Able To Stick On The Wet Surface Of The Metal. The Leakage Sealing Material Should Be Capable Of Sealing Of The Leakages Online Without Reduction Of Pressures. The Material To Be Used Shall Be Of Good Quality High Compressive Strength And High Performance Polymer Having Compressive Strength Of 1219 Kg Per Sqcm And Tensile Strength Of 200 Kg Per Sqcm. The Reinforcement Sealing Kit Should Be Of High Strength Stainless Steel Having Ultimate Tensile Strength Of 100000 Psi. Since The Pipeline Is Transporting Hydrocarbon And Is Passing Through Environmentally Sensitive Area, The Material To Be Used Shall Be Compatible With All The Hydrocarbons. The Entire System Shall Be Made Of Pre Designed Combination Of High Performance Polymers And Dry And Wet Bi Axial Fibre Glass Tapes. The Tapes Shall Be Of 4 Inch Or More In Width And 10 Metre Or More In Length. The Entire Combination Of The System Should Be Able To Seal The Leakage Online And Also Prevent Further Leakage In The Pipeline. The Top Coat Of Polymer Liquid Shall Be Applied For Strength On Underground Pipelines And A Layer Of Water Based Coating On Above Ground Pipelines. The Repair Work Shall Add Sufficient Strength To The Pipeline. Curing Of The Entire System Shall Be Simple. The Entire System Shall Cure On Its Own And In Presence Of Moisture. No Heating Shall Be Required. No Plastic Shrink Tape Or Bopp Tape Will Be Used As Repair Material. The Top Coat Of High Performance Polymer Will Be Applied To Protect The Entire System From Chemicals, Water And Environment. The Leakage Sealing Work Should Be Designed For The Maximum Operating Pressure Of 10 Kg Per Sqcm In The Pipeline.Expected Service Life The S-Wrap Pipe Leakage Sealing Shall Be Designed To Offer An Estimated Service Life Of 5 Years. Delivery Period Within One Month From Date Of Po Loi.Other Terms And Conditions 1. Number Of Persons As Required For Completing The Job Satisfactorily, Shall Be Engaged By The Contractor. 2.Contractor Is Required To Take Appropriate Work Permit Before Starting Any Work. 3. As This Is A Running Terminal, Work May Have To Be Carried Out Depending Upon Availability Of The Area. Hence, The Contractor Shall Coordinate And Carry Out The Work Accordingly. 4. At The Time Of Commissioning Of The Job, The Contractor Shall Provide Personal Protective Equipments Like Hand Gloves, Helmets, Safety Shoes, Safety Belts Etc To All The Workmen Employed By Him And During Monsoon The Contractor Should Provide Rain Coat, Cap, Gumboot Etc To The Workmen. 5. Contractor And His Workmen Shall Be Governed By The Safety Requirements That Are In Vogue Or May Be Implemented From Time To Time. 6. The Contractor Will Be Required To Take Photo Passes For Himself And For The Workmen Employed By Him While Working Inside The Depot For Security Reasons. For Preparation Of The Said Passes, Contractor Has To Produce Required Number Of The Copies Of The Photographs Of His Workmen, Police Verification Certificate, Esic And Pf Compliance Certification Statement As Required By The Respective Authorities, Obtaining Labour Licence And Complying With Its Provisions.7. In Case, If The Contractor Either Fails To Carry Out Any Of The Jobs Mentioned Above, These Jobs Shall Be Carried Out Through Any Other Contractor At The Discretion Of Hpcl And Cost Incurred For The Same Shall Be Debited To The Contractor And Recovered From His Pending Bills Security Deposits. Please Refer Relevant Clauses In Attached Gtc. 8. Contractor Has To Comply With All Applicable Rules And Regulations Pertaining To Minimum Wages, Safety, Epf, Esic, Insurance, Workmen Compensation Act, Contract Labour Act Etc. 9. The Normal Working Hours Are From 0830 Hrs To 1700 Hrs. However, The Contractor May Have To Extend The Working Hours On Weekdays And Holidays As Per The Exigencies Of The Job. No Extra Payments Will Be Made For Such Additional Works. 10. Any Act Of Indiscipline Misconduct Theft Pilferage On The Part Of Contractor Employee Will Be Viewed Very Seriously And Hpcl Will Have The Right To Terminate The Contract Forthwith. 11. Any Damage Arising Out Of Faulty Workmanship Should Be Rectified By Contractor Free Of Cost. Any Loss Of Production Caused Due To Delay In Carrying Repair Job Beyond Stipulated Time Allotted Will Be Recovered From The Contractor As Decided By Hpcl. 12. Coordination With Eic On Daily Basis Is Essential. Security Deposit The Contractor Has To Submit A Security Deposit Of 1 Percentage Of P.O. Value By Dd Drawn In Favour Of Hindustan Petroleum Corporation Limited, Within 10 Days From The Date Of Receipt Of Loi Po. Payment Terms Payment Will Be Made Within 15 Days From The Date Of Receipt Of The Certified Bill At Our Disbursement Section. 100 Percent Payment Shall Be Made With 10% Retention Amount Which Can Be Released Against Submission Of Pbg.Please Raise Queries In The Stipulated Time Through Eproc For Any Clarification. You Can Also Contact The User Through Phone Or Email.If The Any Vendor Withdraws The Offer After Becoming L1, Subject Vendor Will Be Put On Holiday List In Hpcl For Minimum Period Of Six Months To Maximum Three Years. However The Period Can Be More Than Three Years In Extraordinary Circumstances. Hence, Bidders Are Advised To Go Through The Tender Document Fully And Respond.

» Get complete Support to submit Tender Bid.
» Support in Bidding Online and upload your Bids on the department Portal.
» Support in documentation and Vendor Registration.
» Checking Eligibility Criteria
» Support in Technical as well as Financial Bid.
» Tender Document.


For more details Kindly fill up the form and our executive will get in touch with you or Call us :- 08320565287.