Repair And Maintenance Of Afs Gates At Different Point And General Maintenance Of All Afs Gates Of Western Kishi Embankment, Western Afflux Bund And Mahuli Marginal Right Bank Before Flood 2024
Maintenance Of Afs Gate Of Western Afflux Bund, Western And Eastern Koshi Embankment And Visiting Of Dredging Work At 23.52 Km Of Eastern Afflux Bund During Flood Period 2024
Hire Of 4 Nos High Capacity Diesel Operated Dewatering Pump Hp Capacity With Consumption Of Fuel For The Period Of 15 The June 2024 To 15Th Oct 2024 For Dewatering Rain Water From Inside Nirmali Ring Bund To Outer Side At Nirmali
Repair And Maintenance Of Afs Gates At 123.50 And 123.90 Km Of Eastern Koshi Embankment Before Flood 2024