Consultancy Service For Updation Of Dpr Including Geo Technical Investigation And Hydraulic Calculations For Bridges In Km 63.00 To 97.00 On Nh.305 In The State Of Himachal Pradesh.
Sh C.o R.wall At Rd 3.450 To 3/468 And B/wall At Rd 3/470 To 3.485, 3.210 To 3.300 Under Pdna. Recovery And Restoration On Samej Sarpara Road Km 0.00 To 13.450
Sh C.o Pcc R.wall At Rd 5.120 To 5.135 Under Pdna Recovery And Restoration On Anu Munish Road Km. 0.000 To 11.000
Sh C.O Wire Crate R.Wall At Rd 59.980 To 60.130 And B.Wall At Rd 59.970 To 60.130 Under Pdna. Recovery And Restoration On Rohru Sungri Bhali Taklech Nogli Road Km. 27.000 To 80.000
Hpsebl/gphd/db-9/2025-26-74
Tender For The Work Channelization Of Ganvi Khad Filled With Debris From Baily Bridge To Upstream Up To Hpsebl Resdential Colony Rd 100.00 To 450.00mtr Of 22.50 Mw Ganvi Power House Division Hpsebl Jeori. During Flash Flood On Dated 13.08.2025
Sh C.o Wire Crate R.wall At Rd 30.570 To 0.620 And 2.750 To 2.795 Under Pdna. Recovery And Restoration On Seripul Anurakshi Upto Kareri Road Km 0.000 To 5.690
Sh C.O Pcc R/Wall At Rd 0.134 To 0.143 And 0.825 To 0.840 Under Pdna Recovery And Restoration Of Link Road To Village Bahli Km. 0.000 To 1.600
Sh C.o Protection Work In Various Rds Under Pdna. Recovery And Restoration On Gaura Kartot Road Km 0.00 To 4.300
Sh C.o B.wall At Rd 1.390 To 1.400, 1.840 To 1.855, 1.900 To 1.910, 2.005 To 2.025 And 2.090 To 2.100 Under Pdna.
Sh C.O R.Wall At Rd 6.120 To 6.138 And B.Wall At Rd 6.635 To 6.660 Under Pdna Recovery And Restoration On Ganvi To Fancha Road Km. 0.000 To 9.500
Sh C.o Wire Crate R.walls At Rd 43.660 To 43.764, 43.850 To 43.860, 44.320 To 44.330 And B.wall At Km. 43.810 To 43.822 And Pcc R.wall At Km. 30.060 To 30.070 Under Pdna Recover And Restoration On Rgmsj Road Km. 0.000 To 61.000
Sh C.o Wire Crate R.wall And Road Filling In Layer Between Km. 15.830 To 15.870 And Pcc R.wall At Rd 12.840 To 12.860 Under Pdna. Recovery And Restoration On Kashdhar Darkali Road Km. 0.000 To 22.700
Restoration Of Damaged Slab Culvert Of The Road To Intake Of Ganvi Stage 2 Near Outlet Of Vortex Tank And Spillway Channel Which Was Damaged Due To Heavy Flood In Ganvi Khad On Dated 13.08.2025.
Tender For The Work Removal Of Silt, Slush From Forebay Tunnel, Forebay And Sump Of 22.50 Mw Ganvi Power House Stage-i Accumulated Due To Entry Of Muddy/silty Water Through Regulation Gate Opening At El 1568.35 During Flash Flood In Ganvi Khad On Dat
Sh C.o R.wall In With Pcc Toe Wall At Rd 4.840 To 4.860, 4.930 To 4.950 And Stone Soling At Rd 4.470 To 5.00 Under Pdna.
Sh C.O Wire Crate B.Wall At Rd 30.065 To 30.077.50 Under Pdna. Recovery And Restoration On Mashnoo Taklech Road Km. 12.000 To 48.000
Hpsebl/gphd/db-9/2025-26-71
Sh C.o R.wall At Rd 3.850 To 3.878 Under Pdna Recovery And Restoration On Ganvi Keyo Road Km. 0.000 To 4.180
Special Repair To Bldg No Ht-02 Ht-03 P-83 Of Ge 863 Ews And Provn Of Covered Shed Near Bldg No T-51 To T-54 Of 283 Transit Camp At Jhakri Under Ge 863 Ews Ge/863/ews-t-46 Of 2025-26 Spl Repair To Bldg No Ht-02 Ht-03 P-83