Partial Dismantling Of Vehicular Subway Coming Inside The Plot Boundary Of Lig Type Tenements For Pmay Housing Scheme At Kharghar Station On Creek Side Chargeable To Deposit Work For Cidco. Part B : Construction Of Road Near Ballast Siding At Sanpada Carshed.Chargeable To Revenue
Supply of Lamp Ballast For Hpsv Lamps As Per Is 15882:2009 Is 15885 Q3
Supply of 50 Lamp Starter Ignitors - Starting Device For Hpsv Lamps Metal Halide Lamps As Per Is 12449 Part 1 And Part 2 Q3 Lamp Ballast For Hpsv Lamps As Per Is 15882:2009 Is 15885 Q3 High Pressure Sodium Vapour Lamps Hpsv Lamps As Per Is 9974 Part 1 And 2 Q3
DISMENTLING,ERECTION,TESTING AND COMMISSIONING OF CLAMP BEAMS,BALLAST BOX AND RAIL TABLE OF WAGON TIPPLER -2 CHP STAGE-I AT NTPCUNCHAHAR
Earthwork In Cutting/Formation, Extension Of Minor Bridges, Supply Of Stone Ballast Of 65 Mm Sizehard Stone, Transportation Of P. Way Material, Laying & Linking Of Bg Track Including Point- Xing, Dismantling Of Civil Structures And Other Miscellaneous Works In C/W Converting Stabling Line No. 9 Into Running Line And A Passenger Pf Line At Udaipur Station
Supply of 36 Watt High Frequency Electronic Ballast For Corridor Light As Per Clw S Pecification No. Clw/Es/3/0041 Or Latest For Wag9 Locomotives. Warranty Period: 30 Mon Ths After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs
Improvement Of Illumination Of Newly Constructed Coal And Ballast Siding At Hindol Road.
Attention/Strengthening To Various Bridges By Cpg, Epoxy Grouting, Ww/Rw, Flooring/Apron, Ballast Wall, Gabions, Inspection Steps, Jacketing Etc. 39 Bridges Pid No. 01.01.32.24.3.50.003 Umb 23-24
Supply, Delivery And Stacking Of 92, 000 Cum 50Mm Gauge Machine Crushed Track Ballast As Per Railways Specification At Ghutku Gtk Depot In Sub-Depots From Outside Railway Land And Loading Into Railway Wagons
Rebuilding/Strengthening Of Existing Major / Minor Bridges Arch Bridges, Pipe Culverts, Rcc Slab & Psc Slab Gc Loading. With Relieving Girder Complete Track Workslaying And Linking, Tamping Of Track, Destressing Of Lwrs, Transportion Of P.Way Materials, Supply And Stacking Of Ballast And Other Civil Engineering Works Complete Work Of Between Section Mahesana - Palanpur
Through Ballast Renewal Main Lines By Bcm For A Total Length Of 44.197 Tkm In Aden/West/Gnt Section. Sw-Ii: Through Ballast Renewal Loop Lines By Manually For A Total Length Of 4.057 Tkm In Aden/West/Gnt Section.
Through Ballast Recoupment For A Length Of 43.20Kms From Km 62/000 - 101/700 On Up And Km 81/750-85/250 Down Line. Sw- Ii: Through Ballast Recoupment - 0.8Ikm Loop Lines And 16 Nos. Points And Crossings.
Increasing Of Sleeper Density Of Existing Psc From 1540 Sleepers/Km To 1660 Sleeper/Km On Up Line At Km 220/700-231/300 And 240/200-251/000 For A Length Of 21.4Km In Den/E/Sbc Section. Sw-Ii: Bangalore - Jolarpettai Section: Through Ballast Recoupment In Points And Crossings For 12Nos.
Supply of Fluorscent Tube Light Fitting 600Mm Long Suitable For 2 Feet, 20W/18W Fluorscent Lamps Without Electronic Ballast And Tube Conforming To Icf Drawing No.Icf/Std-7-6-009, Col-I Alt.B Or Lates T Warranty Period: 30 Months After The Date Of Delivery
Supply of 2 x 18 Watt Fly Catcher complete with tube, Heavy duty stainless steel body approximate size 24.5x8x17 Inches Size- 3 mm With heavy duty Transformer and Electronic ballast
Doubling Of Track Between Execution Of Earth Work Ii Extension Of Minor Bridges & Rubs Iiiconstruction Of Platforms, Service Buildings, Foot Over Bridge, Cover Over Platforms V Construction Of Mse Walls Iv Collection Of Ballast & Dumping V Supply Of P.Way Materials, Transportation Of P.Way Materials, Laying & Linking Of Track, Assembling & Insertion Of Points & Crossings And Other Miscellaneous Works Including Electrification & Signaling Works From Km.4.665 To Km 10.00 Between Pagidipalli Including And Bommaipalli Including Stations.
Plan, Construct, Develop & Operate Gati Shakti Multi-Modal Cargo Terminal Gct For Handling Cargo On Existing Ballast Siding Towards Rewari End Of New Sakhun Station On Dfccil/Railway Land
Polymer Plaster, Epoxy Grouting, Toe Wall, Retaining Wall, Bridge Tablet And Ballast Retainer Wall Of Bridges Under The Jurisdiction Of Aden/Tumsr Road
Transportation Of P.Way Materials, Supplying & Stacking 65Mm Gauge Stone Ballast Machine Crushed Hard Stone Ballast Spreading Of Ballast, Laying And Linking Of Broad Gauge Stabling Lines, Including Points And Crossings, Tamping Of Track, Ni Work & Other Ancillary Work In C/W Provision Of Three Loop Lines At Ajmer Station On Madar End
Supply of 50 Lamp Ballast For Hpsv Lamps As Per Is 15882:2009 Is 15885 Q3