C.C 1 2 4 20Mm Concrete For Filling Gaps In Rr Abutment And Lining Repair, Rr Masonry For Rectifying The Damaged Portion Of The Abutment General-Pvip Action Plan 2024-25- Rectification Works To Abutment Of Culvert Near Ch1.350Km Of Link Canal -General Civil Work
Augmentation Of Waterway By Replacing Small Pipe Bridges By Rcc Box And Abutment Slab At Bridges No. 86/1, 86/2, 86/3, 87/1, 87/2, 87/3, 87/4, 87/5, 87/6, 88/1, 88/2, 88/3, 88/4, 88/5, 88/6, 89/2, 89/3, 94/4, 94/7, 19 Nos On Nrl-Mae Section Under Adentkyn Under South East Section. B Proposal For Strengthening Of Scoured Bank/Slope At Hm 99.60 To 100.00, Hm 140.98 To 141.18 Hm 147.60 To 147.75 And Repairs To Bridge Face Wall At Hm 110-111 Etc. In Nrl-Mae Section Under Aden/T/Kyn. C Schedule For Anti-Corrosive Painting Of Existing And Corroded Old Anti-Crash Barriers And Minor Repairs To Footing Of Existing & Old Anti-Crash Barriers In Nrl-Mae Section Under Aden T Kyn.