Ac Pipeline Tenders

(Select any tender from the list to send an email)
Ref. No #25693375 Central Government / Public Sector Live

Supply Of Material - 8 600# Split Tee With Lor Plug And Scarfed Nipple Blrf Flange, Gaskets And Fastners, 4 600# Gas Bag Fittings With Lor Plug And Scarfed Nipple Blrf Flange, Gaskets And Fastners, 8 Buna N Sealing Elements, 2 Tor Pressure Equilization Fittings With End Cap, N2 Gas Bags, Mobilization / De-Mobilization Of Hot Tapping Mhine & Power Pk With Hoses Of Iocl, Fully Functional Power Pk With Hoses, Hot Tapping Mhine, Mobilization / De-Mobilization Of Hot Tapping Mhine & Power Pk With Hoses Of Vendor, Fully Functional Power Pk With Hoses, Hot Tapping Mhine, Mobilization / De-Mobilization Of cessories Of Hot Tapping Mhine Of Vendor, Sandwich Valves For 8 Dia , Sandwich Valves For B/P Lineif Required, 8 600# Stop Cutter, 8 600# Cutter Housing, Stop Cylinders, Stop Housing Suitable For 8 Dia , Stop Heads Suitable For 8 Dia , Sandwich Valves For Gas Bag Fitting, Pilot Drill, Cutter Holder, Lor/Lor Plus Plug Older, Hand Tapping/Pneumatic Driven Mhine, Services Required To Be Executed By Vendor, Cleaning And Removal Of The Coating If Required, , Ut Lamination Check Of At Hot Tap Locations, Welding Of Split Tees, Gas Bag Fittings, Tors Etc As Per Schematic Drawing Atthed, , Radiography Of Welded Jointsif Required, Mpi Testing Of Welded Joints As Applicable., Installation& Removal Of The Sandwich Valves, Cutter Housing, Hot Tapping Mhine, Stop Housing, Stop Cylinder & Bypass Line Etc., Providing All Assistance For Hot Tapping, Bypass Fabrications, N2 Testing, Installation Of Gas Bags, Testing, Air Bleeding And Filling The Section With Product, Clearing The Area, Mhines & Tools., All Materials, Consumables, Tools, Tkles, Labour Etc. Inclusive To Restore Normal Operation In Line With Specification Of Hot Tapping Given Including All Material Complete Under Close Supervision And As Per The Direction Of The Site-Engineer / Engineer-In-Charge., Services Required To Be Execute By Vendor When Iocl Hot Tapping Mhine & Power Pk With Hoses Is Used, Trial Run, Testing & Servicing Of Power Pk, Hoses, Trail Run, Testing & Servicing Of Hot Tapping Mhine, Services Required To Be Execute By Vendor When Vendor Hot Tapping Mhine & Power Pk With Hoses Is Used When Iocl Hot Tapping Mhine Is Not Functional Or Is Not Available, Required Skilled, Semiskilled, Unskilled Manpower, Carrying Out Hot Tapping, Stopping, Insertion Of The Stop Plug And Blocking Flow In The Section, Installation Of Lor Plus Plug, Completing The Work In All Respect Under Close Supervision And As Per The Direction Of The Site-Engineer / Engineer-In-Charge Including All Equipment, Tools & Tkles, Consumable Etc. Required To Complete The Job As Per Scope Of Work., And Services Required During Hook Up Works By Hot Tapping Of Repled Section Of Kapl At Vatrak River Ch. 63.374 Km

Location
Arunachal Pradesh
Due Date
15 Oct, 2022
Amount
Refer Document