Construction Of 2X80 Mva 132/33 Kv Gss Halsi Dist:-Lachisarai With Its Corresponding 2 Nos. Gis Line Bays At Bgcl Sheikhopursarai Along With Construction Of 132 Kv Dcds Egcl Sheikhopursarai-Halsi Transmission Lire With Acsr Panther Conductor And Opgw Rkm-40Km And Construction Of 132 Kv Dcds Lilo Trarsmission Line Fron Gss Halsi To Existing 132 Kvs/C.Amui-Lakhisarai Transmission Line Rkm-21 Km On Turnkey Basis.
Conversion Work Of 66Kv S/C Lalpar220kv-Old Rafaleshwar Dog Line To Acsr Panther Conductor Partly On D/C N.B0.800Km + M/C Tower2.0Km Approved Under R & M Plan 2024-25Total Oh Portion-2.8Km
Bi-Arc For Emergency Restoration Work Of 66Kv/132Kv/220Kv Transmission Line On Tower/H-Frame Structure With Acsr Dog/Panther/Zebra/Equivalent Al-59 Conductor Under Mehsana Circle
Work Of Erection Of 66 Kv Lilo Line To Proposed 220 Kv Dadusar Sub Station From Existing 66 Kv S/C Haldarwas Kaniyel H Frame Line On D/C M/C Tower With Al 59 Conductor Equivalent Weight Of Acsr Panther Conductor Having Route Length Of 21.36 Km Under Nadiad Construction Division Under Nadiad Tr Circle
Work Of Shifting Of 66Kv Kansari - Judvadali S/C Line On D/C Panther Tower With Acsr Panther Conductor Between Location No. 27 To 32 Approved Under R&M 2025-26 Under Am Division Kodinar Under Junagadh Circle With Buyback Of Olm
Bus Conductor Augmentation Up-Gradation Of 33Kv Switchyard From Acsr 100 Sqmm Dog Conductor To Acsr 200 Sqmm Panther Conductor I.R.O Ghoshpukur
Work Of Erection Of Tower, Dp & Hot Line Stringing With Ascr Panther Conductor In 2Nd Ckt Of Existing D/C Panther Tower Of 66Kv Lalpur-Khadba Line & 66Kv Khadba-Rinjpar Line With Acsr Panther Conductor Having Route Length Of 15.00 Rkm Approx
Augmentation Up-Gradation Of 33Kv Switchyard From Acsr 100 Sqmm Dog Conductor To Acsr 200 Sqmm Panther Conductor I.R.O Khaprail 33/11Kv Sub-Station
Construction Of 2X200 Mva + 2X80 Mva, 220/132/33 Kv Ais Sub-Station At Gss Mairwa Along With Construction Of 220 Kv Dcds Transmission Line From 400/220/132 Kv Gss Chhapra New To 220/132/33 Kv Ais Sub-Station At Gss Mairwa With Acsr Zebra Conductor Line Length - 130 Rkm, Construction Of 132 Kv Dcds Transmission Line From 132/33 Kv Gss Raghunathpur To 220/132/33 Kv Ais Sub-Station At Gss Mairwa With Acsr Panther Conductor Line Length - 50 Rkm, Construction Of 132 Kv Dcds Transmission Line From 132/33 Kv Gss Bhorey To 220/132/33 Kv Ais Sub-Station At Gss Mairwa With Acsr Panther Conductor Line Length-75 Rkm, Construction Of 02 Nos. 220 Kv Line Bay Extension Work At 400/220/132 Kv Gss Chhapra New, Construction Of 02 Nos. 132 Kv Line Bay Extension Work At 132/33 Kv Gss Raghunathpur & Construction Of 02 Nos. 132 Kv Line Bay Extension Work At 132/33 Kv Gss Bhorey On Turnkey Basis Under State Plan
Work Of Erection, Testing, & Commissioning Of 66Kv Lilo To Suryarampar S/S From Existing 66Kv Ghiyavad220kv-Kuvadva Line On Partly On D/C Tower With Acsr Panther Conductor
Erection Work Of 66Kv S/C Line From 66Kv Rapar S/S To 66Kv Balasar S/S With S/C Line On D/C Panther Tower With Acsr Panther Conductor Under R & M Plan 2024-25 Line Length 17.5 Kms Pkg-Ii - Rav Moti Village To 66Kv Balasar Work Under Construction
Erection Of 66Kv D/C Lilo Panther Tower Line From Existing 66Kv Ravapar Deshalpar Guntli S/C H-Frame With Acsr Dog Conductor Line To Prop. 66Kv Khirsara Sarva S/S On Acsr Panther Conductor. Work Under Const.
Erection Work Of 66Kv 220Kv D/C Nagor-Nadapa Line On D/C Panther Tower With D/C Al-59 Conductor Line From Ap-34 To Ap-68 Pkg-2 Equivalent Wt. Of Acsr Panther Conductor Work Under Construction
Erection Work Of 66Kv 220Kv D/C Nagor-Nadapa Line On D/C Panther Tower With D/C Al-59 Conductor Line From Ap-1 To Ap-34 Pkg-1 Equivalent Wt. Of Acsr Panther Conductor Work Under Construction
Erection Work Of 66Kv Kidiyanagar To M/S Executive Engineer Water Resource Investigation Division, For Unit Ps-1 On D/C Panther Tower With S/C Acsr Panther Conductor Line For Requirement Of 9350Kva Power Demand On 66 Kv Voltage Class In Respect To M/S Executive Engineer, Water Resource Investigation Division, Nwrw & Kd For Unit Ps-1 Located At Survey No. 1519/P115 Of Village: Fategadh, Taluka: Rapar, Dist.: Kutch- Pkg-Ii Hamirpur Moti Village To 66Kv M/S Executive Engineer, Water Resource Investigation Ss Gantry Work Under Construction Division