Supply of Double Brake Indicator Make Faiveley Ftrtipl Part No.045 0011 00 For Air Br Ake System Of Lhb Coaches. Warranty Period: 36 Months After The Date Of Delivery
Supply of Set Of Air Line Sieve 3/8 Inch And Check Valve With Strainer 1/2 Inch For E70 Brake System I Ftrti Pl Pt. No.029009000 Qty-02 Nos. Ii Ftrtipl Pt. No.009002000-Qty-01No Warranty Period: 30 Months Afte R The Date Of Delivery
Supply of Poh Kit For Equalizing Discharge Valve Consisting 10 Items As Per Annexure A To Escort Part No . 6600 For Air Brake System Of 1400 Hp Demu/Dpc. As Per Drg.No. Escort Part No. 6600 Specn: Escort Part No. 6600. Poh Kit For Triple Valve 16Type Fe114 To Escorts Part No. 1A 68053 Consisting Of 16 Items, For El Ectro Pneumatic Brake Unit Of 1400 Hp Demu Dpc.
Maintenance Of Equipment - Aluminum Checker Platefor Two Semi Trailer 5Mm, Aluminum Cheq Rebate, Air Suspension Bladdar, Diaphragm Assembly, Obsolete Suspension System 200Mm, Break Boosters, Pneumatic Valves, Palm Coupling, Hoses And Fittings, Tool Box, Spare Wheel Carriers, Lifting Ropes, Spare Wheel Rim, Pneumatic Brake And Suspension Line For Two Semi Trailer, Retro Reflective Sticker, Shelter Cabinet Twist Lock, Mounting Plate, Bushes, Bolts And Nuts, Air Tanks, Electrical Lines And Accessories For Two Semi Trailer, Tail Lamp Assembly, 7 Pin Sockets, Side Marking Lights, Air Compressor For Industrial Ac, Circuit Breaker Relay Contactor For Industrial Ac, Paint White, Paint Black, Silicon, Primer, Thinner, Cleaning Brush, Detergent, Grease, Painting Denting And Repair Charges, Cutting Welding, All Wheels Overhauling Axle Lack Greasing And Repairing, Fitment Of Air Suspension Systems, Maintenance Of Three Ac, Fitting Of Electrical Line, Any Other Costs Of Items Or Job
Supply of Maintenance Kit For Double Brake Indicator Ftrtil Part No.790 045 110 For Faiveley Make Air Bra Ke System Of Lhb Coaches Consisting Of 04 Items. As Per Attached Anexxure. Warranty Period: 36 Months Aft Er The Date Of Delivery
Supply of Rake Test Rig For Twin Pipe Air Brake System. Warranty Period: 30 Months After The Date Of D Elivery
Supply of Automatic Smoke/Fire Detection With Alarm System In Each Coach As Per Clause 2.9.2 Of Rdso Spe Cification No. Rdso/Pe/Spec/Emu/0196-2024 Rev.1 With All Latest Addendum Corrigendum And Annexures. On E Set Per Coach Load Weighing System Including Redundant Weight Sensors At Bogie Level, Junction Boxes For Interfac Ing Cables, Mating Connectors, Ss Hardware, Cable Markers And Crimp Contacts. The Scope Of Supply Of Pressur E Transducers Shall Be With Supplier As Per Clause 4.25 Of Rdso Specification No. Rdso/Pe/Spec/Emu/0196-2 024 Rev.1 With All Latest Addendum Corrigendum And Annexures. One Set Per Coach. Complete Air-Conditioning System Passenger Coaches As Per Clause 4.38 Of Rdso Specification No. Rdso/Pe/Spec/Emu/0196-2024 Rev.1 With All Latest Addendum Corrigendum And Annexures. With Neces Sary Equipment Such As 2 Nos. Roof Mounted Package Unit Rmpu, Micro-Controller, Control Panel, Bellows, Ga Skets And Suitable Drain Arrangement Including Crimping Lugs, Cable Markers With Heat Shrinkable Sleeves For Po Wer And Control Cables, Mating Connectors, Equipment Mounting And Earthing Hardware And Accessories. One S Et Per Coach Note: Quantity Includes 60 Sets As Spares. 3-Phase To Single Phase Underslung Transformer Of Adequate Capacity Not Less Than 20 Kva For Au Xiliary Loads Operating At 230 V Ac And 110 V Ac As Per Clause No. 4.1.1 Xxxx Of Annexure Xiii Of Rdso Spe Cification No. Rdso/Pe/Spec/Emu/0196-2024 Rev.1 With All Latest Addendum Corrigendum And Annexures. One Number Per Coach Except Pantry Car. Note: Quantity Includes 60 Sets As Spares. Star - Star 415/415V Transformer With Neutral On Secondary Side Of Adequate Capacity Not Less Tha N 80 Kva As Per Clause No. 4.1.1 Xxxx Of Annexure Xiii Of Rdso Specification No. Rdso/Pe/Spec/ Emu/01 96-2024 Rev.1 With All Latest Addendum Corrigendum And Annexures To Cater The Pantry Loads Approx. 80 Kva Operating At 415 V & 230 V. The Transformer Should Also Cater To The 110 V Ac Auxiliary Loads Through Additional Winding. One No Per Pantry Car Note: Quantity Includes 5 Sets As Spares. Set Of Equipment, Switch Gears For Toilet Operation In Emergency Mode In Assembled Form Includin G Pre-Wired Pump Control Panel Assembly, 750 Va Inverter, Vtc Compressor, Vtc Pressure Switch And Its S Et Of Contactors As Per Specification Icf/Elec/175. One Set Per Coach Event Recorder As Per Clause 4.9 And Cab Recording Equipment As Per Clause 4.13 Of Rdso Spe Cification No. Rdso/Pe/Spec/ Emu/0196-2024 Rev.1 With All Latest Addendum Corrigendum And Annexures. One Set Per Rake. Complete Pre-Fabricated Driver Desk Housing All The Necessary Equipment And Driver/ Guard Seat, M Aster Cum Brake Controller, Cab Recording Equipment, Including Crimping Lugs, Cable Markers With Heat Shrinkabl E Sleeves For Power And Control Cables, Mating Connectors, Equipment Mounting And Earthing Hardware And Acce Ssories As Per Clause 4.15 & 4.16 Of Rdso Specification No. Rdso/Pe/Spec/Emu/0196-2024 Rev.1 With All L Atest Addendum Corrigendum And Annexures. Note: Provision Of Interface Hardware And Software And Space Fo R Cab Radio, Kavach Tcas, Brake Equipment And Rtis Display Shall Be In The Scope Of Supply. Pneumatic Ho Rns, Rolling Blind And Sun Visors Are Excluded. Items Separately Mentioned In Sor Are Also Excluded From Scope Of Driver Desk. One Set Per Dtc. Ccms Centralized Coach Monitoring System As Per Clause 4.43 Of Rdso Specification No. Rds O/Pe/Spec/Emu/0196-2024 Rev.1 With All Latest Addendum Corrigendum And Annexures. One Set Per Dtc Speed Indicating Cum Recording Equipment As Per Clause 4.19 Of Rdso Specification No. Rdso/P E/Spec/Emu/0196-2024 Rev.1 With All Latest Addendum Corrigendum And Annexures. One Set Per Dtc
Scope Of Supply Of E.P Brake Equipment For 3Phase Memu/Tc Coaches To R Dso Specification Rdso/2013/Cg-03 And To Material Schedule No. Icf/Sk-10-2-573, Issue St Atus :01 Rev.03, Cs-01, Cs-02 & Cs-03. Warranty Period: 30 Months After The Date Of Delivery 1.0 Scope Of Installation & Testing Of Air Brake Or E.P Brake System As Per Rcf/Mp/510002/3Ph/02 Rev-00 Issued By Dy Cple-Iii Dated 05-08-2019., As Per Drawing: Material S Chedule No.Icf/Sk-10-2-573, Issue Status:01 Rev 03 Cs-01, Cs-02, Cs-03 Supply Of E P Brake Equipment For 3 Phase Memu /Dmc Coaches To Rdso Sp Ecification Rdso/2013/Cg-03 And To Material Schedule No. Icf/Sk-10-2-645, Issue Status-0 1, Rev-00, Cs-01, Cs-02 & Cs-03. Warranty Period: 30 Months After The Date Of Delivery 1.Scope Of Installation & Testing Of Air Brake Or E.P Brake System As Per R Cf/Mp/510002/3Phase/01 Rev.00 Issued By Dy Cple-Iii Dated 05-08-2019, As Per Drawing: Material Schedule No.Icf/Sk-10-2-645, Issue Status-01 Rev-00, Cs-01, Cs-02 & Cs-03, Cs-04, Protection Proc Edure: Pi100
Supply of Dump Valve For Wsp Of Air Brake System Of Lhb Coaches. As Per Attached Annexure. Warranty P Eriod: 36 Months After The Date Of Delivery Warranty Period: 36 Months After The Date Of Delivery
Supply of M And M Scropio S10 And Camper Mahindra 36 GEAR CARRIER ASSY COMP 4.3R EL KIT PAD ASSY KIT UJ CROSS OIL SEAL HUB FRONT BRAKE MASTER CYLINDER ASSY 23.81 ELEMENT AIR FILTER CLUTCH COVER AND DISC ASSY AFTER TREATMENT SYSTEM
Supply of Brake Cylinder 355Mm For Air Brake System On Freight Stock To Rdso Drg. No. Wd-92051-S-06, Alt-5, & Other Technical Requirements Conforming To Str No. 02-Abr-02, Appendix - B, Read With All Amendmen Ts, Latest Amendment 4 Of Sept.2016. Warranty Period: 36 Months After The Date Of Delivery
Supply And Installation Of Retro Fitment Of Revised Wiring With Modified Junction Boxes And Connecto Rs For M/S Ftrtil Make Air Brake System As Per Rdso Drg. No. Cg-19005 Alt. 1 And Drg.No.Cg-18246 Alt. 0 Ref.Rdso Letter No. No. Mc/Lhb/Brake, Dated 27/02/19 Warranty Period: 30 Months After The Date Of Deliver Y
Supply And Installation Of Retro Fitment Of Revised Wiring With Modified Junction Boxes And Connector S For M/S Kbil Make Air Brake System As Per Rdso Drg. No. Cg-19005 Alt.1 And Drg. No. Cg-18246, Alt.0. Re F. Rdso Letter No. Mc/Lhb/Brake, Dated 27.02.19. Warranty Period: 30 Months After The Date Of Delivery
Supply And Retro Fitment Of Revised Wiring With Modified Junction Boxes And Connectors For M/S Esc Orts Make Air Brake System As Per Rdso Drg. No. Cg-19005 Alt.1 And Drg. No. Cg-18246, Alt.0. Ref. Rds O Letter No. Mc/Lhb/Brake, Dated 27.02.19 Warranty Period: 30 Months After The Date Of Delivery
Supply of Gasket For Flange Welded Joint Pipe To Equipment For 20 Mm Nb Pipe On Air Brake System To Rds O Drg. No. Wd- 83062- S 07, Alt. 6, Item-1 And Rdso Spec. No. 04-Abr-2002 Rev. 01 Of Sept2017 Warran Ty Period: 30 Months After The Date Of Delivery
Supply of Set Of Air Brake Pipe Fp For Twin Pipe Air Brake System In Blc Wagon Module. One Module Of Blc Consisting O F 02 Sets Of Blca Wagon And 03 Sets Of Blcb Wagon. As Per Annexure Enclosed. Warranty Period: 30 Months After The Date Of Delivery
Supply Of Android Music System, Kit Matting, Door Visor, Rm 69 Channel, Rubber Lip Squeeze, Splash Proof Guard, Brush Disc, Jain Tube, Rear Brake Lining With Shoe, Air Filter Sensor, Clutch Cable, Car Charger, Car Perfume, A.C. Coupler, Starter Switch, Door Regular Rear, Disc Pad Retainer, Disc Rotter, Stabilizer Link Rod, Front Disc Pad Set, Ignition Switch, Rivits, Iron Flat 1 Inch, Alternator Pulley, Alternator Bearing, Front Wind Shield, Front Disc Rotter, Clutch Kit, Ab 385, 697S, Am1, Ab 150, 256 S, Duco Putty, Duco White, Flag Rod, Body Filler, 3 D Matting, Car Perfume, Emblem, Fiber Plate Red
Civil Engineering Works In Connection With Expansion Of The Existing Air Brake Section Along With Provision For Dust Free And Air Conditioned Dv And Sab Work Station And Renovation Of Air Brake Store With Provision Of Selective Pallet Racking System
Supply of Overhauling Kit For Lru, Control Portion, Er Er-Cp Valve To Kbil Part No. 788753-2004 For Ccb 2.0 Air Brake System