Repairing of Air Conditioner system of BEML Dozer SL.No.11835 of Kuya OCP, Bastacolla Area IX.
Comprehensive Annual Maintenance Contract Of Centralized Air Conditioners Qty2 Installed At Nhsrc National Health Systems Resource Centre
Supply, Installation & Commissioning Of New Condenser Coil Along With Power Controller, Driv Er & R22 Gas Charging With Nitrogen Testing Suitable For 5.5 Ton Air Conditioning System Confirm To Is 8148: 2018 With Remote Controller Arrangement. Accepted Make Blue Star Or Equivalent Suitable For Blue Star Air Conditioner System. Warranty Period: 12 Months After The Date Of Delivery
Supply, Installation & Commissioning Of New Cooling Coil Along With Pcb With Hermetic Compr Essor And Temperature Controller For 5.5Ton Air Condition System Confirm To Is 8148:2018 In Roller Bearing Section With Remote Controller Arrangement. Accepted Make Blue Star Or Equivalent Suitable For Blue Star Air Conditioner System. Warranty Period: 12 Months After The Date Of Delivery
Provision Of Air Conditioners And Solar Water Heating System With Allied Works At Certain Living Accn And Special Repair To Ber Cooling Appliances At Su At Af Stn
Supply of Air Conditioner, 134 Cooling System 2 Ton Hot And Cold Copper Pipe Pvc Pipe Insulation Tape 15 Amp Plug
Procurement Of Split Air Conditioner Floor Type, Air Compressor And Allied Accessories And Sitc Of Fire Detection Alarm System In Old Melting Department