Air Cooling Item Tenders

(Select any tender from the list to send an email)
Ref. No #32324464 Central Government/Public Sector Live

Procurement Of Various Equipment -O-Ring 33.5X2.65 20A8, O-Ring 75X3.55 20A8, Fan Blade, Agt Ring, O-Ring D10, 77X2, 62 N90s, O-Ring D53, 57X3, 53 N90s, Type 20008M Limit Switch, Dn33 Electronic Card, Flowrate Detector- Circuit-Shaft Stern Gland Nd20, Manometer Nd100 B0-60M.Flexible Hose5mseparator Limiter, Base O-Ring, Base O-Ring, Potentiometer 5Kohms, Eb + Battery Charging Ext Supply Cable, Eb - Battery Charging Ext Supply Cable, Nord-Lock Wash 6, Base Plate Joint Dia. 26 X 2.5 Neoprene, O-Ring 15.10X2.70 20A8, 2-Posn Rever.Switch 3A Sr 160Un01 With Lock, O-Ring, Terminal 2 Conductors 0.14 To 1Mm2, Link Contact, Link Contact, Base Plate Joint Dia. 37.77 X 2.62 Neoprene, Single-Pole Push-Button 7A Series 200Ps01, Cable Gland Cmdel-M Iso10, Cable Gland Cmdel-M Iso12, Base Plate Joint Dia. 47.22 X 3.53 Neoprene, Thrust Stop, Split Ring, Split Ring, Terminal 2 Conductors 0, 08 To 1, 5Mm2, End Plate For Serial 280, End Plate For Serial 280, End Plate For Serial 280, Horizontal Bridging Contact For Terminals Series 280 24A, Terminal 2, 5 Mm2, Terminal 2 Levels For 2, 5 Mm2, Junction Terminal 2 Conductors 008 To 25 Mm2, End Plate, End Plate For Serial 281, Fuse Terminal, Terminal Fuse Holder, End Plate For Serial 283, End Plate For Serial 283, Insulated Step-Down Jumper, Terminal 3 Conductors 0.2 To 10 Mm2, Terminal 2 Conductors 6 To 35Mm², End Plate, Terminal For Ground, Bulb 24V/40W B15, O-Ring 30.80X3.60 20A8, Standard Filtering Cartridges, O-Ring 10, 60X2, 65-20A8-An, O-Ring 34, 10X3, 60-20A8 Gn, O-Ring 36, 50X2, 65-20A8-An, O-Ring 37, 47X5, 33-20A8-Gn, O-Ring 10, 00X1, 808-20A8-An, Pre-Insulated Terminal, O-Ring 35.60X3.60 20A8, Starter Switch, Position Detector End Valve Fresh Pipe Cm-E-14-G21-3, Annealed Copper Flat Gasket D39 X 48 X 3 - Nf R 93-920, Seal, Lower Cup, Ball Joint, Upper Cup, O-Ring 14X1.8 20A8, O-Ring 5330Bb 23.6X2.65-20A8, O-Ring 25, 00 X2, 65 20A8 An, O-Ring 5330Bb 37.5X2.65-20A8, O-Ring 5330Bb 40X3, 55-20A8, O-Ring 45X3.55 20A8, O-Ring 85X3.55 20A8, O-Ring 106X3.55 20A8, O-Ring 112X5.3 20A8, O-Ring 118.00X5.30 20A8, O-Ring 125X5.3 20A8, O-Ring 393, 07X6, 99, Stop, Spring Split Pin, Cable Gland Bvle1, Cable Gland M20, Pre-Insulated Pin, Pre-Insulated Terminal, Lock Washer, Lock Washer Dn8, Stainless Steel Lock Tab Washer Dn8, Standard Safety Washer De 16, , Annealed Copper Flat Gasket 21, 2 X 26 X 1, 5, Ruch Sealing Ring, Od48.26, Composite Seal Series363 Dia.40Pc92 Teflon Loaded With Glass, Joint 265X299x3 Fibre/Nbr, O-Ring 12, 10 X 2, 70 20A8 Gn, O-Ring 30, 80 X 3, 60 20A8 Gn, O-Ring 17, 00 X 2, 65 20A8 An, O-Ring 18, 00 X 2, 65 20A8 An, O-Ring 11, 20 X 1, 80 20A8 An, O-Ring 14, 00 X 1, 80 20A8 An, O-Ring 33, 50 X 2, 65 20A8 An, O-Ring 63, 00 X 3, 55 20A8 An, O-Ring 75, 00 X 3, 55 20A8 An, O-Ring 85, 00 X 3, 55 20A8 An, O-Ring 112, 00 X 5, 30 20A8 An, O-Ring 125, 00 X 5, 30 20A8 An, O-Ring 18, 4X2, 7 20A8, O-Ring Dia.13.60X 2., 7 20A8, Cartridge Fuse - Ha25 Type - 6, 3X32 -2, 5A, Seal Enercap Hp, Seal Enercap Hp, Seal Enercap Hp, O-Ring 2.62X59.99X65.23, Spirol Split Pin 5X30 Ss, O-Ring, Electronic Module 4Di 24V Cc Standard, Digital Input Board, Et200 Power Supply Module, Et200s Tete De Station, Spirol Pin 6X40 Mcp, Cartridge Fuse - Ha21 Type - 5X20 - 0, 25 A, Cartridge Fuse - Ha21 Type - 5X20 - 0, 4 A, Cartridge Fuse - Ha21 Type - 5X20 - 0, 63 A, Fuse, 5X20, 1 A Fast Fuse Cart 2, 5A, Fuse, 5X20, 1.25 A Fast Fuse 3, 15 A B&D Spares For Whs, Cartridge Fuse - Ha21 Type - 5X20 - 1, 6 A, Fuse, 5X20, 2.5 A Fast Fuse Cart 0, 25 A, Cartridge Fuse - Ha21 Type - 5X20 - 6, 3 A, Quick-Blow Fuse Cartridge 1A Type Ha22 63X32mm, Cartridge Fuse - Ha22 Type - 6, 3X32 - 1, 6 A, Cartridge Fuse - Ha39 Type - 6, 3X32 - 0, 25 A, Cartridge Fuse - Ha39 Type - 6, 3X32 - 16 A, Cartridge Fuse - Ha20 Type - 5X20 - 0, 4 A, Fuse 0, 8A D1td, Cartridge Fuse - Ha20 Type - 5X20 - 4 A, Cartridge Fuse - Ha20 Type - 5X20 - 6, 3 A, Yellow Indicator Type 344-7, Red Indicator Type 344-7, Cell 9V, Opto Coupler, Scraper Ring 2280/ O-Ring, Joint 59X84x3 Fibre/Elasto Mer, Bulb 24V/25W B15, O-Ring 170, 00, X 5, 30 20A8 An, Relay, Fuse Cart Am14-12A, Defect Display, Ring Bs A6, Fitted Cable, Underwater Fitted Cable, Underwater Fitted Cable, Underwater Fitted Cable, Fitted Cable, 10X Fuses 0, 5A Box, Fuse Cartridge 14X51 440V 8Agg, Insulator For Threaded Rod M8 Ha 35Mm, Cartridge Fuse - Ha37 Type - 6, 3X32 - 1, 6 A, Screw Fs M6x30x30, Washer W20 Protected Steel, Lock Tab Washer Od16 Galvanized Steel, Pin E 5X30 Stainless Steel A2, Pin I10-100 Copper-Aluminium, Pin I8-80 Copper-Aluminium, Pin V2-22 Stainless Steel, Split Pin V 3.2-32 Copper, Pin, V4-40 Stainless Steel, Pin V 6.3-71 Copper, Spring Pin E10x100, Pin E5x40 Z3cn18-10 Passiv., Stainless Steel Lock Tab Washer Dn10, Stainless Steel Lock Tab Washer Dn16, Filter Bobbin, Base, Fuse 22X58 Urga - No Striker - 80A, Fuses Tempo 6, 3A Type Ha20, Fuse 0, 5A, O-Ring 16.9X2.7-20A8, Set Of 2 Retention Clips Type V, Temperature Regulator, Seal, O-Ring D10, 77X2, 62 N90s, O-Ring, O-Ring 52.52 X 3.55 20A8, O Ring, O-Ring D72, 62X3, 53 N90s, 3-Pole 4-Position Selector Switch 1/4 Trun, Push-Button 2C Black, Push-Button 2O Black, Selector Switch Lever Type C - Straight - Black, Selector Switch 2-Position 2-Stage With Black Offset Lever, Lock Washer, Lock Washer, Lock Washer, Diaphragm, Valve Seal, Diaphragm For Ruch Unions, Drilling Diameter 5, Diaphragm For Ruch Unions, Drilling Diameter 7.5, Diaphragm For Ruch Unions, Drilling Diameter 5.8, Cable Tie Black Colson Type, Split Ring 12X16x1.5 Teflon, Spares s For Recognition Light, Pc Socket Decorative With Decorative Plate, Pc Socket Single Of One Module, Radio / Tv Socket Decorative With Decorative Plate, Lighting Switches 10A., Pc Socket, Tight Base For 2 Mechanism 4 Inputs, Tight Base For 2 Mechanism 3 Inputs, Tight Base For 1 Mechanism 1 Input, Lock Washer Nd8 Stainless Steel, Cartridge Fuse-Ha37 Type-6, 3X32-16 A, Print Ribbon For 140 Pages, Identification Board, Quint-Ps/1Ac/24Dc/3.5, Cartridge Fuse-Ha24 Type-6, 3X32-0, 4 A, Cartridge Fuse - Ha24 Type - 6, 3X32 - 0, 63 A, Sertec Washer D10 Ss, Lock Tab Washer Dn4, Gasket 135X153 Th.3 Fibre, Joint 56X84x3 Fibre Nbr, Joint 59X84x3 Fibre/Elastomer, O-Ring 34, 10X3, 60 20A8-Gn, O-Ring 37, 30X3, 60 20A8-Gn, Ruch Sealing Ring Od10.2, Ruch Sealing Ring, Od17.15, Ruch Sealing Ring, Od26.67, Ruch Sealing Ring, Od57, O-Ring 14.00X1.80-20A8 An, Internal Valve Grinding Electrodistributor, Cartridge Fuse - Ha24 Type - 6, 3X32 - 1 A, Seal 88Nbr101, Intercom With Standard Box J1, Intercom With Standard Box J1 J2, Central Unit, Cartridge Fuse - Ha25 Type - 6, 3X32 - 1, 6 A, Oring 7, 65 X 1, 78 An6 80 Shore Nitrile, O-Ring 62.87 X 5.33 20A8, Cartridge Fuse - Gg Type - 14X51 - 40 A, Cartridge Fuse-Ha25 Type-6, 3X32-6, 3 A, Fuse Cartridge 14X51 440V 2Agg, Lock Wire, Dn80 Fresch Water Sensor, Supplier, 44 X 62 X 3 - Mrgh Type Gasket, O Ring 5330Bb 80X5.3-20A8, O-Ring For Body, O-Ring 34, 10 X 3, 60 20A8 Gn, Lock Washer Size 55 X2crni18-9, Lock Washer, Washer N-L D8-13.5/2.5, Lock Washer Nd8 Stainless Steel, Tubular Lug, O-Ring D55, 25X2, 62 N90s, O-Ring D20x2 N90s, O-Ring For Diaphragm, O-Ring D44, 17X1, 78 N70s, O-Ring 53, 34 X 5, 33 20A8 Gn

Location
Karnataka
Due Date
31 Jul, 2024
Amount
5.72 Crore
Ref. No #32264565 Central Government And Public Sector Live   GeM Tender

Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Removal Of Back Pull Out Assembly And Installation Of Spare Back Pull Out Assembly Of Pump For Details Refer Boq No 1 In Sow And 01 Quantity Is Equ.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Decoupling Alignment And Coupling Of Pump And Motor Having Motor Rating Up To 60 Kwe For Details Refer Boq No 2 In Sow And 01 Quantity Is Equal To .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor Of Rating From 30 Kwe To 60 Kwe For Details Refer Boq No 3 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Manual Operated Valve .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Maintenance Of Actuator Of Control Valve Having Diaphragm For Details Refer Boq No 5 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Dismantling Maintenance Assembly Test Run For Details Refer Boq No 6 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Shutdown Heat Exchanger Moderator Heat Exchanger For Details Refer Boq No 7 In Sow And 01 Quantity Is Equal To 2 Nos.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Both Primary Sides Of One Steam Generator For Isi For Details Refer Boq No 8 In Sow And 01 Quantity Is Equal To 1 Nos, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Thrust Bearing Overhauling For Details Refer Boq No 10 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Circulating Pump Pcp And Its Motorfor Details Refer Boq No 11 In Sow And 01 Quantity Is Equal To 2 Nos; As.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Actuator Operated Piston Type Actuator Operated Valve For Details Refer Boq No12 In Sow And 01 Quantity Is Equal To 8.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Guide Nut Inspection Of Emergency Core System Shut Down Size 8 Inch To 12 Inchfor Details Refer Boq No 13 In Sow And 01 Quantity I.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Emergency Core System Shut Down For Details Refer Boq No 14 In Sow And 01 Quantity Is Equal To 16.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Control Valve With Valve Size Up To 6 Inches For Details Refer Boq No 15 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And At.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor With Electrical Rating From 65 Kwe To 400 Kwe For Details Refer Boq No 16 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Pressurizing Pumpfor Details Refer Boq No 17 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Door Seals Of Reactor Building Main Lock Equipment Doorfor Details Refer Boq No 18 In Sow And 01 Quantity Is Equal To 3 Nos; As .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Moderator Pump Replacement For Details Refer Boq No 19 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Manual Bellow Sealed Valvefor Details Refer Boq No 20 In Sow And 01 Quantity Is Equal To 50 Nos; As Per Sow And At.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Diaphragm Replacement Of Diaphragm Valve For Details Refer Boq No 21 In Sow And 01 Quantity Is Equal To 80 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Or Cleaning Of Strainer Filter For Details Refer Boq No 22 In Sow And 01 Quantity Is Equal To 25 Inch Dia; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Relief Valve For Details Refer Boq No 23 In Sow And 01 Quantity Is Equal To 8 Nos; As Per Sow And Atc, Etc

Location
Rajasthan
Due Date
31 Jul, 2024
Amount
54.62 Lacs
Ref. No #32254240 Central Government And Public Sector Live   GeM Tender

Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Auxiliary Boiler Feed Pump Abfp For Details Refer Boq No 1 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Ser.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Rdp And Sdp For Details Refer Boq No 2 In Scope Of Work And 01 Quantity Is Equal To 8 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Horizontally Installed Having Motor Rating Above 100 Kw And Up To 600 Kw For Details Refer Boq No 3 In Scope Of Work And 01 Qua.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Vertically Installed Having Motor Rating Above 100 Kw And Up To 600 Kw For Details Refer Boq No 4 In Scope Of Work And 01 Quant.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Rotating Assembly Of Cep For Details Refer Boq No 5 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Ccw Plant Water Pump Vertically Installed Having Motor Rating Above 900 Kw And Up To 1200 Kw For Details Refer Boq No 6 In Scope Of .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Pumps Horizontal Vertical Having Motor Rating Upto 50 Kw For Details Refer Boq No 7 In Scope Of Work And 01 Quant.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Pumps Horizontal Vertical Having Motor Rating More Than 100 Kw To 400 Kw Except Apwc Pump For Details Refer Boq Bid Number/???? ???? ?? ???? : Gem/2024/B/5133025 Dated/????? : 09-07-2024 Bid Document/ ?? ?1????? 1 / 47 Category/?? ?????? To 400 Kw Except Apwc Pump For Details Refer Boq No.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Two Yearly Checks Of Apwc Pump Vertically Installed Double Suction Single Stage Having Motor Rating 200 Kw For Details Refer Boq.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Cep Ccw Plant Water Pumps Having Motor Rating 900 Kw To 1200 Kw For Details Refer Boq No 10 In Scope Of Work And 0.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating More Than 30 Kw And Up To 100 Kw For Details Refer Boq No 11 In Scope Of Work And 01 Quantity Is Equal To 3 .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating More Than 100 Kw And Up To 600 Kw For Details Refer Boq No 12 In Scope Of Work And 01 Quantity Is Equal To 5.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating From 850 Kw And Up To 1200 Kw Cepccw Plant Water Pump Motor For Details Refer Boq No 13 In Scope Of Work And.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Rotating Assembly Of Condensate Extraction Pump Cep For Details Refer Boq No 14 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Actuator Operated Electrical Pneumatic Valves Except Asdv Csdv And Msiv For Details Refer Boq No 15 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Actuator Control Valve Isolating Valve Of Operated Valves For Details Refer Boq No 16 In Scope Of Work And 01 Quantity Is Equal .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Manual Valve Including Relief Valves And Non Return Valves Of All Sizes For Details Refer Boq No 17 In Scope Of Work And 01 Quantity, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Actuator Of Motorized Valves Of All Sizes For Details Refer Boq No 18 In Scope Of Work And 01 Quantity Is Equal To 38 Nos.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Valve Or Replacement Of Diaphragm In Diaphragm Valve Manualactuator Operated For Details Refer Boq No 19 In Scope .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Strainer Filter Cleaning Or Replacement For Details Refer Boq No 20 In Scope Of Work And 01 Quantity Is Equal To 310 Inch Dia; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Condenser Tubes Total 23160 Number Of Tubes Of Size 25 Mm Inner Diameter And Stainless Steel Material By Hydro Jet Method For Details Refer.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Tg Lubricating Oil Cooler Tubes By Manual Scraping With Nylon Brush Method For Details Refer Boq No 22 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Bid Details/?? ???? 2 / 47 Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Stator Water Hx Bbd Cooler Condenser Vacuum Pump Hx By Manual Scraping With Nylon Brush Method For Details Refer Boq No 23 In Scope Of.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Idct Outlet Ndct Outlet Condenser Water Pump House Cwph Sump Inlet Screen Cleaning And Rep For Details Refer Boq No 24 In Scope Of Work And 01 Q.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Removal And Installation Of Stop Log Gate Of Ndct Idct For Details Refer Boq No 25 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Prov.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Idct Nozzle Cleaningreplacement For Details Refer Boq No 26 In Scope Of Work And 01 Quantity Is Equal To 4800 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Main Boiler Feed Pump Motor And Bfp Auxiliary Systems For Details Refer Boq No 27 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Gasket Replacement For Flange Joints For Details Refer Boq No 28 In Scope Of Work And 01 Quantity Is Equal To 750 Inch Dia; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Plant Water Self Cleaning Strainer For Details Refer Boq No 29 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Condenser Water Ccw Inlet Or Outlet Header Rubber Expansion Joint Installed In Pipe Line Size Of 1800 Nb For Details Refer Boq I.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Horizontally Installed Having Motor Rating Above 30 Kw And Up To 100 Kw For Details Refer Boq No 31 In Scope Of Work And 01 Qua.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Asdv And Csdv For Details Refer Boq No 32 In Scope Of Work And 01 Quantity Is Equal To 8 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Testing Of Main Steam Line Relief Valve By Auxiliary Lifting Device Method For Details Refer Boq No 33 In Scope Of Work And 01 Quantity Is Equal To.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; To And Fro Visit Of Teamfor 01 Or 02 Days For Testing Of Main Steam Line Relief Valve By Auxiliary Lifting Device Method For Details Refer Boq No 3.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Turbine Oil Tank Tot Cleaning For Details Refer Boq No 35 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Main Oil Tank Mot Cleaning For Details Refer Boq No 36 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Main Oil Tank Filter Cleaning For Details Refer Boq No 37 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Main And Small Bid Details/?? ???? 3 / 47 Version 2 - Rr Site 5 And 6; Cleaning Of Main And Small Drain Expender For Details Refer Boq No 38 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider

Location
Rajasthan
Due Date
30 Jul, 2024
Amount
60.34 Lacs