Air Cooling System Tenders

(Select any tender from the list to send an email)
Ref. No #32294855 Central Government/Public Sector Live   GeM Tender

Supply Of Spares - Cotter Pin For Specialist Vehicle Baz, Oil Seal Supply Pipe Assy For Specialist Vehicle Kraz, Hose Oil 15 For Specialist Vehicle Baz, Hose Oil 125For Specialist Vehicle Zil, Sealing Ring For Specialist Vehicle Baz, Coller For Specialist Vehicle Zil, Water Radiator For Specialist Vehicle Baz, Elbow Branch Pipe Left Radiater For Specialist Vehicle Kraz, Elbow Branch Pipe Right Radiater For Specialist Vehicle Baz, Pipe Line For Specialist Vehicle Baz, Hose For Specialist Vehicle Baz, Wing Bolt For Specialist Vehicle Kraz, Hose Flexible Assy For Specialist Vehicle Baz, Holes For Specialist Vehicle Zil, Water Oil Rubber Hose For Specialist Vehicle Baz, Bolt For Specialist Vehicle Zil, Seal For Specialist Vehicle Kraz, Union For Specialist Vehicle Baz, Water Pipe Hose For Specialist Vehicle Baz, Hose For Specialist Vehicle Kraz, Adopter For Specialist Vehicle Baz, Spring For Specialist Vehicle Kraz, Rubber Hose For Specialist Vehicle Ural, Bolt For Specialist Vehicle Baz, Hose Clip For Specialist Vehicle Baz, Hose Clip For Specialist Vehicle Zil, Clip For Specialist Vehicle Baz, Banjo Union For Specialist Vehicle Zil, Connector For Specialist Vehicle Baz, Bracket For Specialist Vehicle Ural, Jublee Clip For Specialist Vehicle Baz, Jublee Clip For Specialist Vehicle Ural, Pipe For Specialist Vehicle Baz, Split Pin For Specialist Vehicle Kraz

Location
Tamil Nadu
Due Date
02 Aug, 2024
Amount
Refer Document
Ref. No #32264565 Central Government And Public Sector Live   GeM Tender

Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Removal Of Back Pull Out Assembly And Installation Of Spare Back Pull Out Assembly Of Pump For Details Refer Boq Item No 1 In Sow And 01 Quantity Is Equ.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Decoupling Alignment And Coupling Of Pump And Motor Having Motor Rating Up To 60 Kwe For Details Refer Boq Item No 2 In Sow And 01 Quantity Is Equal To .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor Of Rating From 30 Kwe To 60 Kwe For Details Refer Boq Item No 3 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Manual Operated Valve .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Maintenance Of Actuator Of Control Valve Having Diaphragm For Details Refer Boq Item No 5 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Dismantling Maintenance Assembly Test Run For Details Refer Boq Item No 6 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Shutdown Heat Exchanger Moderator Heat Exchanger For Details Refer Boq Item No 7 In Sow And 01 Quantity Is Equal To 2 Nos.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Both Primary Sides Of One Steam Generator For Isi For Details Refer Boq Item No 8 In Sow And 01 Quantity Is Equal To 1 Nos, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Thrust Bearing Overhauling For Details Refer Boq Item No 10 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Circulating Pump Pcp And Its Motorfor Details Refer Boq Item No 11 In Sow And 01 Quantity Is Equal To 2 Nos; As.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Actuator Operated Piston Type Actuator Operated Valve For Details Refer Boq Item No12 In Sow And 01 Quantity Is Equal To 8.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Guide Nut Inspection Of Emergency Core Shut Down Size 8 Inch To 12 Inchfor Details Refer Boq Item No 13 In Sow And 01 Quantity I.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Emergency Core Shut Down For Details Refer Boq Item No 14 In Sow And 01 Quantity Is Equal To 16.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Control Valve With Valve Size Up To 6 Inches For Details Refer Boq Item No 15 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And At.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor With Electrical Rating From 65 Kwe To 400 Kwe For Details Refer Boq Item No 16 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Pressurizing Pumpfor Details Refer Boq Item No 17 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Door Seals Of Reactor Building Main Lock Equipment Doorfor Details Refer Boq Item No 18 In Sow And 01 Quantity Is Equal To 3 Nos; As .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Moderator Pump Replacement For Details Refer Boq Item No 19 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Manual Bellow Sealed Valvefor Details Refer Boq Item No 20 In Sow And 01 Quantity Is Equal To 50 Nos; As Per Sow And At.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Diaphragm Replacement Of Diaphragm Valve For Details Refer Boq Item No 21 In Sow And 01 Quantity Is Equal To 80 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Replacement Or Cleaning Of Strainer Filter For Details Refer Boq Item No 22 In Sow And 01 Quantity Is Equal To 25 Inch Dia; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Relief Valve For Details Refer Boq Item No 23 In Sow And 01 Quantity Is Equal To 8 Nos; As Per Sow And Atc, Etc

Location
Rajasthan
Due Date
31 Jul, 2024
Amount
54.62 Lacs
Ref. No #32266784 State Government Live

Supply Of Spares Consumables And Lubricants -White cotton cloth ,Old sarees ,Aluminum Lugs 150 sq mm, ,Aluminum Lugs 240sq mm ,Aluminum Lugs 400sq mm ,Aluminum Lugs 25 sq mm ,Aluminum Lugs 35 sq mm ,Aluminum Lugs 50 sq mm ,Aluminum Lugs, 75 sq mm ,Aluminum Lugs 95 sq mm ,Aluminum Lugs 120 sq mm ,PVC tape roll (Anchor/Steelgrip) ,BGM Tape Rolls ,Teflon Tape 1/2" ,Hydrometer ,Closing coil for 132 kV SF6 Breaker ,Tripping coil for 132 kV SF6 Breaker ,PVC wire FRLS 1.5 sq mm Cu cable (Havells/Polycab/Anchor) ,PVC wire FRLS 2.5 sq mm Cu cable (Havells/Polycab/Anchor) ,Pendant holder ,Emery Paper rough ,Tripping coil for 33 kV VCB ,Closing coil for 33 kV VCB ,Transformer Oil ,CRC 2-26 spray bottles 500 ml ,Champion Gasket 4mm ,Champion gasket 2mm ,Spring Charge motor for CG SF6 132 KV Breaker, 230 volt, C 22 ,Oxygen gas cylinder new ,Oxygen Gas refilling as per sample ,SS nut, bolt and washers for gate rubber seals dia 16mm length 100mm as per sample ,Gland packing as per sample ,LED long range Rechargeable Flash Lights (Andslite/Wipro/Havells/Eveready) ,Carbon Brush for hydro alternator (as per existing sample) ,Stud SS M12 (length off sizes) with bolts as per sample for ,Stud SS M16 (length off sizes) with bolts as per sample for ,Stud SS M20 (length off sizes) with bolts as per sample for ,Stud SS M30 (length off sizes) with bolts as per sample for ,Neoprene Rubber Gasket 4mm commercial grade 65A ,Neoprene Rubber Gasket 5mm commercial grade 65A ,HRC fuses 25 A ,HRC fuses 10 A ,HRC fuses 6 A ,HRC fuses 4 A ,HRC fuses 2 A ,HRC fuses 125 A ,HRC fuses 100 A ,HRC fuses 80 A ,HRC fuses 63 A ,Cutting Wheels 4 inch (Bosch/Makita/Dewalt) ,Grinding Wheels 4 inch (Bosch/Makita/Dewalt) ,Rustolene ,Broom (Jhadu) ,M T Oil ,M Oil ,Diesel ,Petrol ,Gear Oil ,Cadmium compound ,M-oil filter for HP compressor , Fuel filter for HP compressor , filter for HP compressor ,Distilled Water ,Coolant ,Coupling bolts with synthetic bush as per sample ,PVC wire FRLS 4.0 sq mm Cu cable (Havells/Polycab/Anchor) ,LED Lamps 18 W ,Holdite 500 gms ,LPG gas cylinder refill for Works (Commercial) ,Spirit ,Thinner ,Petroleum jelly ,MS Studs 8mm ,MS Studs 10mm ,Heater rods for filtration plant ,DT MCCB 100 Amp (ABB/Havells/Schnieder/L&T/ Seimens ) ,DT MCCB 63 Amp (ABB/Havells/Schnieder/L&T/ Seimens ) ,Bearing SKF 1215-K for gate power transmission ,Bearing SKF 7211 FOG type for gate power transmission ,Bearing SKF 7216 FOG type for gate power transmission ,Bearing SKF 7312 FOG type for gate power transmission ,U-clamps of different sizes with nuts ,Gearbox rubber oil seals as per sample ,SS shaft coupling ,SS shaft sleeve ,Pin Type Coupling for gates (as per sample) ,PD Relay with Sensor (complete set) ,Hand Pressure Pump for cooler testing ,Gun Metal Gate Valve 1/2 inch (Leader/Sant) ,Gun Metal Gate Valve 3/4 inch (Leader/Sant) ,Gun Metal Gate Valve 1 inch (Leader/Sant) , break contactor ML2 (SIEMENS/L&T) , break contactor ML3 (SIEMENS/L&T) , break contactor ML4 (SIEMENS/L&T) , break contactor ML10 (SIEMENS/L&T) , break contactor 3TF47, 220volt DC coil (SIEMENS/L&T) , break contactor MK1(SIEMENS/L&T) ,Disc Valve ML8 Contactor (SIEMENS/L&T) ,Ball Bearing 6306 ,Lamp 100 watt (Philips/Bajaj/CG) ,MCB SP 10A (Havells/L&T/Schnider) ,MCB SP 16A (Havells/L&T/Schnider) ,MCB SP 20A (Havells/L&T/Schnider) ,MCB SP 32A (Havells/L&T/Schnider) ,ML8 contactor points ,Pin Type Coupling for disc valve OPU(as per sample) ,Cutting Wheels 14 inch (Bosch/Makita/Dewalt) ,Emery paper smooth ,Blow lamp/Electric gas torch ,Drill Chuck 1/2" heavy duty Bosch ,Gas regulator for Oxygen & LPG cylinder (02 each) ,Line Shaft 10 feet long (for 75HP motor as per sample) ,Flexible PVC pipe 3/4" standard ,Lamp HP/MV 250 watt with choke (400v) ,Lamp Son Type 250 watt (Havells) ,Contact point for ML4 (L&T) ,Contact point for ML3 (L&T) ,Contact point for ML2 (L&T) ,Contact point for ML1 (L&T) ,1 HP Mono block water pump (Kirloskar/Crompton) for barrage ,Nuts and Bolts/Studs of sizes ,Tripping Coil 40 Amp for Reversible starter ,Contactor sets 40 Amp for Reversible starter ,Bamboo 24 ft long ,ML4F Star Delta Starter for Dewatering Pumps ,4" LED Tubelights complete 40 watts ,Drill Bits 8mm ,Drill Bits 10mm ,Drill Bits 12mm ,Drill Bits 14mm ,Drill Bits 16mm ,Araldite 90 gm tube ,Stainless Steel perforated mesh 3mm as per sample ,Brass bolts with nut 12 mm 6 inch / 4inch length ,Brass bolts with nut 18 mm 6 inch / 4inch length ,Float for oil leakage unit ,Cast Iron valve 25mm, 6''/ 9",flange type as per sample ,Single Phase Preventor & overload relay ,P P Rope ,Hacksaw Blade 12 inch ,Champion gasket 1mm ,Filter for oil filtration plant ,Neoprene Rubber Gasket 3mm commercial grade 65A ,Neoprene Rubber Gasket 6mm commercial grade 65A , Guide vane Servometer Cup seal with O ring as per sample ,welding electrode 3.5 sq mm ,welding electrode 4.5 sq mm ,Grease MP3 ,LED Lamps 12 W ,LED Lamps 26 W ,Varnish ,Red Oxide Paint ,Oil flow meters as per sample ,Water flow meters as per sample ,DT MCCB 80 Amp (Standard quality) ,11 kV Surge Protection Capacitor for UAT 1st ,Rubber side seal "J" type as per sample ,Rubber bottom seal flat type as per sample ,Rubber top seal as per sample ,SS nut, bolt and washers for gate rubber seals dia 12mm length 75mm ,Gate Brake liners ,Gate Brake coils hermitically sealed IP 65 as per sample ,MS 8" gear type coupling ,Voltmeter 11KV ( PTR 11KV/110 V) ,Voltmeter 132KV (PTR 132KV/110V) ,Portable Pressure guage 0-15 kg/cm2 ,Portable Water Pressure guage 0-15 kg/cm2 ,1.5 sq. mm Cu Thimble (Dowells) ,2.5 sq. mm Cu Thimble (Dowells) ,4.0 sq. mm Cu Thimble (Dowells) ,6.0 sq. mm Thimble (Dowells) ,25mm Thimble (25 each) ,35 mm Thimble (25 each) ,50 mm Thimble (25 each) ,90 mm Thimble (25 each) , break contactor MNX95(SIEMENS/L&T) , break contactor MNX-A1(SIEMENS/L&T) ,Break Up fuse 100/120 Amp ,3 phase Fan for 20MVA, 132/33 KV power Transformer (as per existing) ,Limit Switch for SF6 132KV breaker ,Local Remote Switch for 132KV SF6 Breaker ,Safety valves for HP compressor ,Gate Valve 80mm ,Reversible Starter for gates as per sample (Standard ISI Make) ,LED Flood light 100 watt for barrage , Disc valve NRV as per sample , Disc valve Relief Valve as per sample , Disc valve Flanged type Valve as per sample , Disc valve Servometer Piston as per sample , Disc valve Servometer Cup seal as per sample , Disc valve Servometer Plug as per sample , Governor OPU Relief Valve as per sample , Disc valve Rubber bush , Disc valve coupling bolt with bush ,Disc Valve Seal/rubber cord as per sample ,11 kV Porcelain Bush ,Pliers large size (Taparia/Stanley) ,Screw Driver set (Taparia/Stanley) ,MS Flat Iron 50x5mm ,MS Flat Iron 25x5mm ,Power Hacksaw Blade 24 inch ,Hacksaw Blade Frame ,Slide Wrench (Taparia) 125 mm ,Gas torch cutter ,Iron panzris (as per sample) ,Push Button with complete assembly (heavy & standard make) ,Oil stone ,Winding Temperature Indicator for 14 MVA Transformer (as per sample) ,200 V DC-24 V DC Convertor 10 A ,Tor steel 8mm ,Gun Metal Bushes of sorts for Dewatering pumps ,Gate Pulleys as per sample ,Plumber block for rope drum S513/515 and its bearing as per sample ,Worm and worm wheel set of under sluice gearbox / HR gear box and spillway gates as per sample ,Steel wire rope Hemp core dia 28mm USHA-MARTIN ,Steel wire rope Hemp core dia 25mm USHA-MARTIN ,PVC wire FRLS 6.0 sq mm Cu cable (Havells/Polycab/Anchor) ,Safety relief valve as per sample

Location
Jammu And Kashmir
Due Date
29 Jul, 2024
Amount
47.68 Lacs
Ref. No #32254240 Central Government And Public Sector Live   GeM Tender

Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Auxiliary Boiler Feed Pump Abfp For Details Refer Boq Item No 1 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Ser.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Rdp And Sdp For Details Refer Boq Item No 2 In Scope Of Work And 01 Quantity Is Equal To 8 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Horizontally Installed Having Motor Rating Above 100 Kw And Up To 600 Kw For Details Refer Boq Item No 3 In Scope Of Work And 01 Qua.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Vertically Installed Having Motor Rating Above 100 Kw And Up To 600 Kw For Details Refer Boq Item No 4 In Scope Of Work And 01 Quant.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Rotating Assembly Of Cep For Details Refer Boq Item No 5 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Ccw Plant Water Pump Vertically Installed Having Motor Rating Above 900 Kw And Up To 1200 Kw For Details Refer Boq Item No 6 In Scope Of .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Pumps Horizontal Vertical Having Motor Rating Upto 50 Kw For Details Refer Boq Item No 7 In Scope Of Work And 01 Quant.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Pumps Horizontal Vertical Having Motor Rating More Than 100 Kw To 400 Kw Except Apwc Pump For Details Refer Boq Item Bid Number/???? ???? ?? ???? : Gem/2024/B/5133025 Dated/????? : 09-07-2024 Bid Document/ ?? ?1????? 1 / 47 Item Category/?? ?????? To 400 Kw Except Apwc Pump For Details Refer Boq Item No.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Two Yearly Checks Of Apwc Pump Vertically Installed Double Suction Single Stage Having Motor Rating 200 Kw For Details Refer Boq.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Cep Ccw Plant Water Pumps Having Motor Rating 900 Kw To 1200 Kw For Details Refer Boq Item No 10 In Scope Of Work And 0.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating More Than 30 Kw And Up To 100 Kw For Details Refer Boq Item No 11 In Scope Of Work And 01 Quantity Is Equal To 3 .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating More Than 100 Kw And Up To 600 Kw For Details Refer Boq Item No 12 In Scope Of Work And 01 Quantity Is Equal To 5.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating From 850 Kw And Up To 1200 Kw Cepccw Plant Water Pump Motor For Details Refer Boq Item No 13 In Scope Of Work And.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Rotating Assembly Of Condensate Extraction Pump Cep For Details Refer Boq Item No 14 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Actuator Operated Electrical Pneumatic Valves Except Asdv Csdv And Msiv For Details Refer Boq Item No 15 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Actuator Control Valve Isolating Valve Of Operated Valves For Details Refer Boq Item No 16 In Scope Of Work And 01 Quantity Is Equal .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Manual Valve Including Relief Valves And Non Return Valves Of All Sizes For Details Refer Boq Item No 17 In Scope Of Work And 01 Quantity, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Actuator Of Motorized Valves Of All Sizes For Details Refer Boq Item No 18 In Scope Of Work And 01 Quantity Is Equal To 38 Nos.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Valve Or Replacement Of Diaphragm In Diaphragm Valve Manualactuator Operated For Details Refer Boq Item No 19 In Scope .., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Strainer Filter Cleaning Or Replacement For Details Refer Boq Item No 20 In Scope Of Work And 01 Quantity Is Equal To 310 Inch Dia; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Condenser Tubes Total 23160 Number Of Tubes Of Size 25 Mm Inner Diameter And Stainless Steel Material By Hydro Jet Method For Details Refer.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Tg Lubricating Oil Cooler Tubes By Manual Scraping With Nylon Brush Method For Details Refer Boq Item No 22 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Bid Details/?? ???? 2 / 47 Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Stator Water Hx Bbd Cooler Condenser Vacuum Pump Hx By Manual Scraping With Nylon Brush Method For Details Refer Boq Item No 23 In Scope Of.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Idct Outlet Ndct Outlet Condenser Water Pump House Cwph Sump Inlet Screen Cleaning And Rep For Details Refer Boq Item No 24 In Scope Of Work And 01 Q.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Removal And Installation Of Stop Log Gate Of Ndct Idct For Details Refer Boq Item No 25 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Prov.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Idct Nozzle Cleaningreplacement For Details Refer Boq Item No 26 In Scope Of Work And 01 Quantity Is Equal To 4800 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Main Boiler Feed Pump Motor And Bfp Auxiliary s For Details Refer Boq Item No 27 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Gasket Replacement For Flange Joints For Details Refer Boq Item No 28 In Scope Of Work And 01 Quantity Is Equal To 750 Inch Dia; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Plant Water Self Cleaning Strainer For Details Refer Boq Item No 29 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Condenser Water Ccw Inlet Or Outlet Header Rubber Expansion Joint Installed In Pipe Line Size Of 1800 Nb For Details Refer Boq I.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Horizontally Installed Having Motor Rating Above 30 Kw And Up To 100 Kw For Details Refer Boq Item No 31 In Scope Of Work And 01 Qua.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Asdv And Csdv For Details Refer Boq Item No 32 In Scope Of Work And 01 Quantity Is Equal To 8 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Testing Of Main Steam Line Relief Valve By Auxiliary Lifting Device Method For Details Refer Boq Item No 33 In Scope Of Work And 01 Quantity Is Equal To.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; To And Fro Visit Of Teamfor 01 Or 02 Days For Testing Of Main Steam Line Relief Valve By Auxiliary Lifting Device Method For Details Refer Boq Item No 3.., Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Turbine Oil Tank Tot Cleaning For Details Refer Boq Item No 35 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Main Oil Tank Mot Cleaning For Details Refer Boq Item No 36 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Main Oil Tank Filter Cleaning For Details Refer Boq Item No 37 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ s/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Main And Small Bid Details/?? ???? 3 / 47 Version 2 - Rr Site 5 And 6; Cleaning Of Main And Small Drain Expender For Details Refer Boq Item No 38 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider

Location
Rajasthan
Due Date
30 Jul, 2024
Amount
60.34 Lacs