Air Heat Exchanger Tenders

(Select any tender from the list to send an email)
Ref. No #32264565 Central Government And Public Sector Live   GeM Tender

Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Removal Of Back Pull Out Assembly And Installation Of Spare Back Pull Out Assembly Of Pump For Details Refer Boq Item No 1 In Sow And 01 Quantity Is Equ.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Decoupling Alignment And Coupling Of Pump And Motor Having Motor Rating Up To 60 Kwe For Details Refer Boq Item No 2 In Sow And 01 Quantity Is Equal To .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor Of Rating From 30 Kwe To 60 Kwe For Details Refer Boq Item No 3 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Manual Operated Valve .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Maintenance Of Actuator Of Control Valve Having Diaphragm For Details Refer Boq Item No 5 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Dismantling Maintenance Assembly Test Run For Details Refer Boq Item No 6 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Shutdown Cooling Moderator For Details Refer Boq Item No 7 In Sow And 01 Quantity Is Equal To 2 Nos.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Opening And Box Up Of Both Primary Sides Of One Steam Generator For Isi For Details Refer Boq Item No 8 In Sow And 01 Quantity Is Equal To 1 Nos, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Primary Circulating Pump Thrust Bearing Overhauling For Details Refer Boq Item No 10 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Circulating Pump Pcp And Its Motorfor Details Refer Boq Item No 11 In Sow And 01 Quantity Is Equal To 2 Nos; As.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Actuator Operated Piston Type Actuator Operated Valve For Details Refer Boq Item No12 In Sow And 01 Quantity Is Equal To 8.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Guide Nut Inspection Of Emergency Core Cooling System Shut Down Cooling Size 8 Inch To 12 Inchfor Details Refer Boq Item No 13 In Sow And 01 Quantity I.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Emergency Core Cooling System Shut Down Cooling For Details Refer Boq Item No 14 In Sow And 01 Quantity Is Equal To 16.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Control Valve With Valve Size Up To 6 Inches For Details Refer Boq Item No 15 In Sow And 01 Quantity Is Equal To 4 Nos; As Per Sow And At.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Motor With Electrical Rating From 65 Kwe To 400 Kwe For Details Refer Boq Item No 16 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Pressurizing Pumpfor Details Refer Boq Item No 17 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Door Seals Of Reactor Building Main Lock Equipment Doorfor Details Refer Boq Item No 18 In Sow And 01 Quantity Is Equal To 3 Nos; As .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Moderator Pump Replacement For Details Refer Boq Item No 19 In Sow And 01 Quantity Is Equal To 1 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Manual Bellow Sealed Valvefor Details Refer Boq Item No 20 In Sow And 01 Quantity Is Equal To 50 Nos; As Per Sow And At.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Diaphragm Replacement Of Diaphragm Valve For Details Refer Boq Item No 21 In Sow And 01 Quantity Is Equal To 80 Nos; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Or Cleaning Of Strainer Filter For Details Refer Boq Item No 22 In Sow And 01 Quantity Is Equal To 25 Inch Dia; As Per Sow And Atc, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Relief Valve For Details Refer Boq Item No 23 In Sow And 01 Quantity Is Equal To 8 Nos; As Per Sow And Atc, Etc

Location
Rajasthan
Due Date
31 Jul, 2024
Amount
54.62 Lacs