Supply of Air Conditioner And Other Electrical Items 34 Ceiling Fan Wall Mounted Fan 2 Ton Split Ac Chimney Exauster System Dehumidifier
Provision Of Acs For Lca Provn Of Chemical Earthing Pits At Various Locations ,Provision Of Smoke Detector And Fire Alarm System At Rt Cabin And Exten And Provision Of 3 Phase Power Supply For Operation Of Arrester Barrier At Air Force Station
Annual Maintenance Service-Air Conditioner Annual Maintenance Services For Water Purification And Conditioning System Version 2 - As Per Atc; As Per Atc; Package-5 : Water Purifier And Conditioning System Maintenance Involving Basic Servicing Filters Membranes All Electrical Parts Includ..
Supply Of Noise Silencer For Air Conditioning Ventilation System
Supply Of Aph Seals And Spares - Ib Seal He Cw S, Ib Seal Leaf He Ccw Sh, Ib Seal Ce Cw Sh, Ib Seal Leaf Ce Ccw Sh, Seal Leaf Ce Sh, Seal Tab He Cw Sh, Seal Tab He Ccw Sh, Seal Tab Ce Cw Sh, Seal Tab Ce Cc Sh, Int Hold Strip He Sh, Int Hold Strip Ce Sh, Hold Strip He Ccw Sh, Hold Strip He Cw Sh, Hold Strip Ce Ccw Sh, Hold Strip Ce Cw Sh, Seal Tab, T-Bar Tab Pl, T-Bar Pl, T-Bar 140X130, Ib Dia Seal Hecw Sh, Ib Dia Seal He Ccw Sh, Ib Dia Seal Cecw Sh, Ib Dia Seal Ce Ccw Sh, Bypass Seal He Sh, Threaded Tube, Eccentric Reducer, Sch 80 Pipe, Bw Elbow, Air Seal Supporting, Air Seal For Swivel Pipe, Bypass Seal, Barco Swivel Joint, Nozzle With Pipe Assembly, Guide Trunion Shaft Bolt, Spring For Supportbearing, Static Seal Assy, Axial Plate Static Seal, Ib Hold Strip He Sh, Ib Hold Strip Ce Sh, Ob Hold Strip Ce Sh, Clip, Pin, Bypass Seal Ce Sh, Bypass Seal Hld Str Sh, Rotor Angel, Radial Seal Assembly, Bypass Seal Assembly, Axial Seal Assembly, Cold End Grating Assy, Grating For Cold End Baskets For Aph Soot Blowing System Mtps
Repair Maintenance And Installation Of Plant Systemsequipments - Defence Indian Air Force; Vehicles Ambulance; Service Provider
Supply, Installation Testing & Commissioning Of 1 Electric Driven Oil Cooled Screw Air Compressor 77 Cfm, Capacity 13 Bar Along With Air Receiver Tank, Capacity 1000 Liters, Refrigerator Air Dryer Refrigerator 13 Bar, 114 Cfm Along With Necessary Pneumatic Pipe Line Connections, Non-Return Valves, Isolation Ball Valves, Sa Fety Valves And Pressure Gauges. 2. Dismantling Of Existing Old Pneumatic Pipeline System In Bogie Shop & Whe El Shop And Supply, Installation, Testing & Commissioning Of New M.S Pipe, Main Line Of Size 63 Mm Class C Con Forming To Is: 1239 Length 976 Meters & M.S Pipe Drop Line Of Size 15 Mm Class C Conforming To Is: 1239 Len Gth 280 Meters Including All Accessories Flange, Tees, Reducers, Structural Steel Supports And Clamps, Necessar Y Civil Work, Etc. Including Lift To All Heights, Welding, Jointing, Painting And Insert Rubber Gaskets, Nuts, Bolts, Isolati On Valves, Frl, Auto Drain Valves, Pressure Gauges, Quick Coupling Etc. As Required Shall Be Painted With Two Co Ats Of Enamel Paint Over A Coat Of Red Oxide Zinc Chromate Primer Post A Proper Surface Preparation. Warranty Period: 30 Months After The Date Of Delivery
Biennial Amc Of Air Conditioning System At Ntpc Nava Raipur Office Andthe Guest House
Supply of Double Brake Indicator Make Faiveley Ftrtipl Part No.045 0011 00 For Air Br Ake System Of Lhb Coaches. Warranty Period: 36 Months After The Date Of Delivery
Supply, Installation, Testing, Commissioning Of 2 6 Tr Dx Type Precession Air Conditioning System Including Necessary Associated Works Like Refrigerant Piping, Ducting, Etc.
Procurement Of Spares -Compressor Assy, Sm 110-4Eag, Danfoss, Compressor Assy, Danfoss For Air Conditioning System
Annual Maintenance Works Of Fire Hydrant, Mulsifier Systems And Air Lines And Overhaul Of Instrument Air Compressors, Air Drying Units, & Fire Hydrant Booster Pumps Of Stage-Iii As And When Required During The Year 2024-25.
Annual Maintenance Service For Centralised Air Conditioning System
Supply of Pu Paint, Aircraft Blue, Shade : Isc No. 108. Drawing No.: Icf Drg. No. Icf /Sk 8-3-016, Alt.- H/Ni L. Matl. & Spec.: Epoxy Cum Polyurethane Painting System Two Pack For The Exterior Painting Of Railway Coach Es As Per Rdsos Spec. No. M&C/Pcn/100/2018 With Rdsos Amendment No. 1B Rev. 2.0 As An Additional R Equirement Warranty Period: 12 Months After The Date Of Delivery
Supply of Single Car Test Rig Complete Along With All Accessories As Trolley, Hose Pipes With Coupling, Gauges Et C. As Per Attached Escort Drg. No 3Kb 1944 Or Similar The System Is Suitable For Twin Pipe Graduated Released Air Bra Ke Testing Of Bg Coaches As Per Testing Procedure In Indian Railway Annexure Attached. Warranty Period: 30 Months After The Date Of Delivery
Design, Supply, Installation, Testing And Commissioning Of Heat Ventilation And Air Conditioning System At Rajpath Club Resort
Systematic Cleaning Of Supply/ Return Air Ducts, Return Air Boxing And False Ceiling Along With Ozone Sterilization Of Ducts Of Air Conditioning System Installed At Operation Theatre Of Municipal Eye Hospital, Mumbai For Two Years.
Supply of Set Of Air Line Sieve 3/8 Inch And Check Valve With Strainer 1/2 Inch For E70 Brake System I Ftrti Pl Pt. No.029009000 Qty-02 Nos. Ii Ftrtipl Pt. No.009002000-Qty-01No Warranty Period: 30 Months Afte R The Date Of Delivery
Supply Of Modular Ceiling Panels, Clean Room Door, Wall Epoxy, Ss Grill, Pvc Flooring, Civil Work, Monitoring System, Hepa Filter, Fire, Validation, Air Curtain, Dismentaling
Supply Of At Welding Portion For 60 Kg 90 Uts/60E1 R260 Grade Rails Using Compressed Air-Petrol Pre-Heating System, 3 Piece Pre-Fabricated Moulds Zircon Washed Manually Pressed Using Single Shot Crucible Fitted With Automatic Tapping Thimble For Welding Of Rail Joints