Air Tank Scrap Tenders

(Select any tender from the list to send an email)
Ref. No #32254240 Central Government And Public Sector Live   GeM Tender

Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Auxiliary Boiler Feed Pump Abfp For Details Refer Boq Item No 1 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Ser.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Rdp And Sdp For Details Refer Boq Item No 2 In Scope Of Work And 01 Quantity Is Equal To 8 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Horizontally Installed Having Motor Rating Above 100 Kw And Up To 600 Kw For Details Refer Boq Item No 3 In Scope Of Work And 01 Qua.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Vertically Installed Having Motor Rating Above 100 Kw And Up To 600 Kw For Details Refer Boq Item No 4 In Scope Of Work And 01 Quant.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Rotating Assembly Of Cep For Details Refer Boq Item No 5 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Ccw Plant Water Pump Vertically Installed Having Motor Rating Above 900 Kw And Up To 1200 Kw For Details Refer Boq Item No 6 In Scope Of .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Pumps Horizontal Vertical Having Motor Rating Upto 50 Kw For Details Refer Boq Item No 7 In Scope Of Work And 01 Quant.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Pumps Horizontal Vertical Having Motor Rating More Than 100 Kw To 400 Kw Except Apwc Pump For Details Refer Boq Item Bid Number/???? ???? ?? ???? : Gem/2024/B/5133025 Dated/????? : 09-07-2024 Bid Document/ ?? ?1????? 1 / 47 Item Category/?? ?????? To 400 Kw Except Apwc Pump For Details Refer Boq Item No.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Two Yearly Checks Of Apwc Pump Vertically Installed Double Suction Single Stage Having Motor Rating 200 Kw For Details Refer Boq.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Cep Ccw Plant Water Pumps Having Motor Rating 900 Kw To 1200 Kw For Details Refer Boq Item No 10 In Scope Of Work And 0.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating More Than 30 Kw And Up To 100 Kw For Details Refer Boq Item No 11 In Scope Of Work And 01 Quantity Is Equal To 3 .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating More Than 100 Kw And Up To 600 Kw For Details Refer Boq Item No 12 In Scope Of Work And 01 Quantity Is Equal To 5.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Motor Rating From 850 Kw And Up To 1200 Kw Cepccw Plant Water Pump Motor For Details Refer Boq Item No 13 In Scope Of Work And.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Rotating Assembly Of Condensate Extraction Pump Cep For Details Refer Boq Item No 14 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Actuator Operated Electrical Pneumatic Valves Except Asdv Csdv And Msiv For Details Refer Boq Item No 15 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Actuator Control Valve Isolating Valve Of Operated Valves For Details Refer Boq Item No 16 In Scope Of Work And 01 Quantity Is Equal .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Manual Valve Including Relief Valves And Non Return Valves Of All Sizes For Details Refer Boq Item No 17 In Scope Of Work And 01 Quantity, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Electrical Actuator Of Motorized Valves Of All Sizes For Details Refer Boq Item No 18 In Scope Of Work And 01 Quantity Is Equal To 38 Nos.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Valve Or Replacement Of Diaphragm In Diaphragm Valve Manualactuator Operated For Details Refer Boq Item No 19 In Scope .., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Strainer Filter Cleaning Or Replacement For Details Refer Boq Item No 20 In Scope Of Work And 01 Quantity Is Equal To 310 Inch Dia; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Condenser Tubes Total 23160 Number Of Tubes Of Size 25 Mm Inner Diameter And Stainless Steel Material By Hydro Jet Method For Details Refer.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Tg Lubricating Oil Cooler Tubes By Manual ing With Nylon Brush Method For Details Refer Boq Item No 22 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Bid Details/?? ???? 2 / 47 Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Stator Water Hx Bbd Cooler Condenser Vacuum Pump Hx By Manual ing With Nylon Brush Method For Details Refer Boq Item No 23 In Scope Of.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Idct Outlet Ndct Outlet Condenser Water Pump House Cwph Sump Inlet Screen Cleaning And Rep For Details Refer Boq Item No 24 In Scope Of Work And 01 Q.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Removal And Installation Of Stop Log Gate Of Ndct Idct For Details Refer Boq Item No 25 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Prov.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Idct Nozzle Cleaningreplacement For Details Refer Boq Item No 26 In Scope Of Work And 01 Quantity Is Equal To 4800 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Preventive Maintenance Checks Of Main Boiler Feed Pump Motor And Bfp Auxiliary Systems For Details Refer Boq Item No 27 In Scope Of Work And 01 Quantity.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Gasket Replacement For Flange Joints For Details Refer Boq Item No 28 In Scope Of Work And 01 Quantity Is Equal To 750 Inch Dia; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Plant Water Self Cleaning Strainer For Details Refer Boq Item No 29 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Replacement Of Condenser Cooling Water Ccw Inlet Or Outlet Header Rubber Expansion Joint Installed In Pipe Line Size Of 1800 Nb For Details Refer Boq I.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Pump Horizontally Installed Having Motor Rating Above 30 Kw And Up To 100 Kw For Details Refer Boq Item No 31 In Scope Of Work And 01 Qua.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Overhauling Of Asdv And Csdv For Details Refer Boq Item No 32 In Scope Of Work And 01 Quantity Is Equal To 8 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Testing Of Main Steam Line Relief Valve By Auxiliary Lifting Device Method For Details Refer Boq Item No 33 In Scope Of Work And 01 Quantity Is Equal To.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; To And Fro Visit Of Teamfor 01 Or 02 Days For Testing Of Main Steam Line Relief Valve By Auxiliary Lifting Device Method For Details Refer Boq Item No 3.., Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Turbine Oil Tot Cleaning For Details Refer Boq Item No 35 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Main Oil Mot Cleaning For Details Refer Boq Item No 36 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Main Oil Filter Cleaning For Details Refer Boq Item No 37 In Scope Of Work And 01 Quantity Is Equal To 2 Nos; Service Provider, Rep, Maintenance, And Installation Of Plant/ Systems/Equipments Version 2 - Rr Site 5 And 6; Cleaning Of Main And Small Bid Details/?? ???? 3 / 47 Version 2 - Rr Site 5 And 6; Cleaning Of Main And Small Drain Expender For Details Refer Boq Item No 38 In Scope Of Work And 01 Quantity Is Equal To 1 Nos; Service Provider

Location
Rajasthan
Due Date
30 Jul, 2024
Amount
60.34 Lacs