Coal Pipes, Soot Blowers, Safety Valves, Hp/Lp Piping And Manual Valves, Fuel Firing System Including Fuel Oil Pump House Etc. Of Boilers Of 2X210 Mw And 2X250 Mw Bhel Make Units Of Ghtp, Lehra Mohabat. Routine, Preventive, Breakdown Maintenance And Overhauling Jobs Mechanical Works Of Pressure Parts, Wind Box And Burners, Air Pre-Heaters, Scaphs, Esps, Aux. Prds, Ducts, Dampers, Gates,
Sitc Of 1 No High Pressure Air Compressor Capacity 42Kg/Sq Cm With Auxiliary Panel Control System And Necessary Pipe Line/Valves Etc
Supply Of Pump House Equipments, Control Penal, Pressure Gauge, Pressure Switlch, Input Conductor Cables, Conductor Cables, Hydrant System Equipments, Hydrant Valve, Hose Pipe, Branch Pipe, Hose Box, Hose Reel, Isolation Valve, Air Release Valve, Non Return Valves, Fire Brigade Inlet Connection, Structural Steel, Tank, Wrapping
Repair Replacement And Maintenance Of Control Panels Non Clogging Pump Sets Dozing Systems Replacement Of Deteriorated Ms Pipe Line With Ppr Pipe Lines Rewinding And Servicing Of Air Blower Valves And Allied Works At Sewage Treatment Installations
E.I. Works Sitc Of Ahu Control Valves With Thermostat For Temperature Controller Of 22Nos Ahu, 2Nos Kirloskar Make Air Cooled Screw Chillers For Library Building And Auditorium Of Scbmch, Cuttack
Supply Of Cast Iron Impeller, Garden Bench, Cast Iron Bench, Gun Metal Gate Valves - Bhel, Cast Copper Alloy Screw Down Bib Taps And Stop Valves For Water Services As Per Is 781, Frp Strip Cast Iron Bench, General Purpose Ball Valves V2, Resilient Seated Cast Iron Air Relief Valves For Water Works Purposes, Copper Alloy Gate Valve For Waterworks Purpose As Per Is 778, Industrial Bellows-Seal Wedge Gate Valves-Is:11733
Supply Of Comprehensive Half Yearly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Adour Etb & Mcw, Afs, Jamnagar As Per Edt- 3564. 6 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Half Year At Adour Etb, Afs Jamnagar. 6 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564, Comprehensive Half Yearly Maintenance By Oem/ Oem Authorized Service Agency Including Preventive, Breakdown And Spares Requirements For Six Air Compressors 2 Nos Kes 160- 7.5, 3 Nos Kes 30- 7.5 Of Kirloskar Make And 1 No. E10-11 Of Elgi Make And Drier 3 Nos 150 Cfm Refrigeration Type Kirloskar Make At Adour Etb & Mcw, Afs, Jamnagar As Per Edt-3564, Proof Load Testing Of Hoists Including Certification By Authorized Inspector For 1 No. Of 3-Ton Monorail Twin Hoist At Etb Test Cell, 1 No. Of 2-Ton Eot Crane At Etb Preparation Room And 2 Nos. Of 2-Ton Eot Cranes At Mcw Once Per Year For 3 Years At Adour Etb, Afs, Jamnagar As Per Edt-3564., Hydro Pressure Testing Of Four Air Receivers 3 Nos. Of 2000 Litres And 1 No. Of 1000 Litres Capacity With Certification Through Govt. Authorized Inspector Once Per Year For 3 Years At Adour Etb, Afs, Jamnagar As Per Edt-3564., Comprehensive Half Yearly Maintenance By Oem/ Authorized Fire Extinguishing And Alarm System Specialist Team For Co2 Based Fire Extinguishing System Including Preventive, Breakdown With Co2 Gas Refilling, Demonstration With Co2 Gas Refilling And As & When Required Replacement Of Sensors, Co2 Master & Slave Valves At Adour Etb, Afs, Jamnagar As Per Edt-3564, Calibration Of Master Calibrators Of Adour Etb, Afs, Jamnagar At Nabl Accredited Labs As Per Annexure-7 Of Edt- 3564., One Time Supply Of Tools And Consumables Listed In Annexure- 4 At Adour Etb, Afs, Jamnagar As Per Edt-3564., Chemical Earth Pit Maintenance Including Supply & Topping Of 4 Nos Of Copper Sulphate Bags For Each Earth Pits Max. 10 Earth Pits At Adour Etb, Afs, Jamnagar As Per Clause 5.4 W. Of Edt-3564, Comprehensive Half Yearly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Tv3/Utb Etb, Afs, Chandigarh As Per Edt-3564. 6 Visits In 3Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of Half Year At Tv3/Utb Afs Chandigarh.Years. 20% Of Total Payment As Per Edt-3564 He Half Year At Tv3/Utb Afs Chandigarh. 6 Visits In 3, One Time Supply Of Tools And Consumables Listed In Annexure-4 At Tv3/Utb Etb, Afs, Chandigarh As Per Edt-3564, Comprehensive Half Yearly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Viper Etb, Afs, Kanpur As Per Edt-3564. 6 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Half Year At Afs Kanpur. 6 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564 6 Number 3 Calibration Of Master Calibrators, Calibration Of Master Calibrators Of Viper Etb, Afs, Kanpur At Nabl Accredited Labs As Per Annexure-7 Of Edt-3564., One Time Supply Of Tools And Consumables Listed In Annexure-4 At Viper Etb, Afs, Kanpur As Per Edt- 3564., Comprehensive Quarterly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Adour Etb, Afs, Gorakhpur As Per Edt-3564. 12 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Qtr. At Adour Etb, Afs Gorakhpur. 12 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564, Comprehensive Quarterly Maintenance By Oem/ Oem Authorized Service Agency Including Preventive, Breakdown And Spares Requirements For Three Air Compressors 2 Nos Of E55-11 And 1 No. Of E15-11, Elgi Make And Dryer 1 No. Of Elrd085, Elgi Make At Adour Etb, Afs, Gorakhpur As Per Edt-3564, Proof Load Testing Of Hoists Including Certification By Authorized Inspector For 1 No. Of 3-Ton Monorail Twin Hoist, 1 No. Of 2-Ton Monorail Hoist And 1 Nos. Of 2-Ton Mcw Eot Crane Once Per Year For 3 Years At Adour Etb, Afs, Gorakhpur As Per Edt-3564., Hydro Pressure Testing Of Four Air Receivers 3 Nos. Of 2000 Litres And 1 No. Of 1000 Litres Capacity With Certification Through Govt. Authorized Inspector Once Per Year For 3 Years At Adour Etb, Afs, Gorakhpur As Per Edt-3564, Comprehensive Quarterly Maintenance By Oem/ Authorized Fire Extinguishing And Alarm System Specialist Team For Co2 Based Fire Extinguishing System Including Preventive, Breakdown With Co2 Gas Refilling, Demonstration With Co2 Gas Refilling And As & When Required Replacement Of Sensors, Co2 Master & Slave Valves At Adour Etb, Afs, Gorakhpur As Per Edt-3564., Calibration Of Master Calibrators Of Adour Etb, Afs, Gorakhpur At Nabl Accredited Labs As Per Edt-3564., One Time Supply Of Tools And Consumables Listed In Annexure-4 At Adour Etb, Afs, Gorakhpur As Per Edt-3564, Comprehensive Quarterly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Adour Etb, Afs, Ambala As Per Edt-3564. 12 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Qtr. At Adour Etb, Afs Ambala. 12 Visits In 3 Years. 20% Of Total Payment As Per Edt- 3564, Comprehensive Quarterly Maintenance By Oem/ Oem Authorized Service Agency Including Preventive, Breakdown And Spares Requirements For Three Air Compressors 2 Nos Of E55-11 And 1 No. Of E15-11, Elgi Make And Drier 1 No. Of Elrd085, Elgi Make At Adour Etb, Afs, Ambala As Per Edt-3564, Proof Load Testing Of Hoists Including Certification By Authorized Inspector For 1 No. Of 3-Ton Monorail Twin Hoist, 1 No. Of 2-Ton Monorail Hoist And 1 Nos. Of 2-Ton Mcw Eot Crane Once Per Year For 3 Years At Adour Etb, Afs, Ambala As Per Edt-3564., Hydro Pressure Testing Of Four Air Receivers 3 Nos. Of 2000 Litres And 1 No. Of 1000 Litres Capacity With Certification Through Govt. Authorized Inspector Once Per Year For 3 Years At Adour Etb, Afs, Ambala As Per Edt-3564, Comprehensive Quarterly Maintenance By Oem/ Authorized Fire Extinguishing And Alarm System Specialist Team For Co2 Based Fire Extinguishing System Including Preventive, Breakdown With Co2 Gas Refilling, Demonstration With Co2 Gas Refilling And As & When Required Replacement Of Sensors, Co2 Master & Slave Valves At Adour Etb, Afs, Ambala As Per Edt-3564, Calibration Of Master Calibrators Of Adour Etb, Afs, Ambala At Nabl Accredited Labs As Per Annexure-7 Of Edt-3564, One Time Supply Of Tools And Consumables Listed In Annexure-4 At Adour Etb, Afs, Ambala As Per Edt- 3564., Preparatory Visits For Group-A With Comprehensive Half Yearly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Aerdc Bangalore As Per Edt-3564. 6 Visits Dt-3564. 6 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Half Year At Aerdc, Bangalore. 6 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564, Submission Of Satisfactory Completion Certificate Of The Half Year At Aerdc, Bangalore. 6 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564, Proof Load Testing Of 3 Nos Of Eot Cranes Once Per Yearfor 3 Years At Aerdc Bangalore As Per Edt-3564., Comprehensive Half Yearly Maintenance By Oem/ Oem Authorized Service Agency Including Preventive, Breakdown And Spares Requirements For Three Air Compressors 2 No¿S Kes 160-7.5 Of Kirloskar And 1 No. E10- 11 Of Elgi Make At Aerdc Bangalore As Per Edt-3564., Structural Painting Of 1 No. Of Test Bed/ Test Rig Per Year At Aerdc Bangalore As Per Edt-3564., Comprehensive Yearly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Ge404 Etb, Afs, Sulur As Per Edt-3564. 3 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Year At Ge404 Etb, Afs Sulur. 3 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564, Comprehensive Yearly Maintenance By Oem/ Oem Authorized Service Agency Including Preventive, Breakdown And Spares Requirements For Three Air Compressors 1 No. E110-11Ac Elgi Make, 1 No. Ga 110-10 Atlas Copco Make And 1 No. Tidy 25 Of Win Air Make And 2 Dryers 1 No. Of 2Kd+010B Refrigeration Type And 1 No. Hld 100A Desiccant Type Gem Make At Ge404 Etb, Afs, Sulur As Per Edt-3564, Comprehensive Yearly Maintenance By Oem/ Authorized Fire Extinguishing And Alarm System Specialist Team For Co2 Based Fire Extinguishing System Including Preventive, Breakdown With Co2 Gas Refilling, Demonstration With Co2 Gas Refilling And As & When Required Replacement Of Sensors, Co2 Master & Slave Valves At Ge404 Etb, Afs, As Per Edt-3564, Proof Load Testing Of Hoists Including Certification By Authorized Inspector For 1 No. 3-Ton Eot Crane In Etb Test Cell, 1 No. 2-Ton Eot Crane In Etb Preparation Room Once Per Year For 3 Years At Ge404 Etb, Afs, Sulur As Per Edt-3564, Hydro Pressure Testing Of Three Air Receivers 1 No. 20000 Litres, 1 No. 10000 Litres And 1 No. 1000 Litres Capacity With Certification Through Govt. Authorized Inspector Once Per Year For 3 Years At Ge404 Etb, Afs, Sulur As Per Edt-3564, Calibration Of Master Calibrators Of Ge404 Etb, Afs, Sulur At Nabl Accredited Labs As Per Annexure-7 Of Edt-3564, One Time Supply Of Tools And Consumables As Per Annexure-4 At Ge404 Etb, Afs, Sulur As Per Edt-3564., Comprehensive Half Yearly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Al31fp Etb, Afs, Pune As Per Edt-3564. 6 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Half Year At Al31fp Etb, Afs Pune. 6 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564, Comprehensive Half Yearly Maintenance By Oem/ Oem Authorized Service Agency Including Preventive, Breakdown And Spares Requirements For One Air Compressor 1 No. E10-11 Of Elgi Make And 3 Filters 1 Pf, 1 Ff And 1 Cf Type Elgi Make Filters At Al31fp Etb, Afs, Pune As Per Edt- 3564., Comprehensive Half Yearly Maintenance By Oem/ Authorized Fire Extinguishing And Alarm System Specialist Team For Co2 Based Fire Extinguishing System Including Preventive, Breakdown With Co2 Gas Refilling, Demonstration With Co2 Gas Refilling And As & When Required Replacement Of Sensors, Co2 Master & Slave Valves At Al31fp Etb, Afs, Pune As Per Edt-3564., Proof Load Testing Of 1 No. Of 3-Ton Eot Crane Once Per Year For 3 Years At Al31fp Etb, Afs, Pune As Per Edt- 3564, Calibration Of Master Calibrators Of Al31fp Etb, Afs, Pune At Nabl Accredited Labs As Per Annexure-7 Of Edt-3564., One Time Supply Of Tools And Consumables As Per Annexure-4 At Al31fp Etb, Afs, Pune As Per Edt- 3564, Preparatory Visits For Group-B With Comprehensive Half Yearly Maintenance Of All Etb Systems Mechanical Systems, Instrumentation Systems & Electrical Systems Including Preventive And Breakdown Maintenance Services At Aerdc Bangalore As Per Edt-3564. 6 Visits In 3 Years. 80% Of Total Payment, Submission Of Satisfactory Completion Certificate Of The Half Year At Aerdc, Bangalore. 6 Visits In 3 Years. 20% Of Total Payment As Per Edt-3564, Proof Load Testing Of 3 No¿S Of Eot Cranes Once Per Year For 3 Years At Aerdc Bangalore As Per Edt-3564., Comprehensive Half Yearly Maintenance By Oem/ Oem A Compressors 2 No¿S Kes 160-7.5 Of Kirloskar And 1 No. E10-11 Of Elgi Make At Aerdc Bangalore As Per Edt-3564. Uthorized Service Agency Including Preventive, Breakdown And Spares Requirements For Three Air, Structural Painting Of 1 No. Of Test Bed/ Test Rig
Supply Of Fly Ash Line Coupling Assembly Drg No 23Po1- T-1B-770, 9Inch Fly Ash Line Coupling Assembly Type Btr Drg No 23Po1-T-1B-776, 9 Inch Fly Ash Line Coupling Assemblytype-19B Drg No 23Po1-T-Ib-772, Clamp Band Pt No 6-Fly Ash Header Valve 9 Inch-As Drg No 23Po1-T-1B-40, Nozzle 18X21 38 Long A F30 Ss-410 Drg No1 403020 4 18 With Ceramic Insert 13 Mm, Pad Fluidising For Silo Area 2Stone Diffuser Trough Arrangement For Silo Area Square Tiles Spares For Vacuum Breaker, Seal Strip Pt No 5 Fly Ash Header Valve 11 As Per Drg No23po1-T-1B-40, Seal Strip Pt No5 Fly Ash Header Valve 9 As Per Drg No23po1-T-1B-40, Casing Or Body Pt No 1 Body Shaft Side And Blind Side For Fly Ash Header Valve 11 As Per Drg No 23-Po1-T-1B-40, 12 Inch Swing Gate Valve Seat As Per Drg No 23Po1-T-Ib-210 Spare For Transfer Hopper, Clamp Band Pt No 6 Fly Ash Header Valve Tersg11 Inch-As Drg No 23Po1-T-1B-40 - Spares For Ahp, Tee C I Unequal 150X150x100mm 0.37, Intel Adaptor For 10 Inch Wetting Unit Size254 Mm Id 279 Mm, Spring For Air Cylinder For Fly Ash Diffuser Intake Vv 12 Inchx6 Inch For Fly Ash System, Hopper Diffuser Assy Drg No 25P04-T-1B- 260, Diffuser Feeder Assy For Nuva Feeder Without Actuator 12Inchx 10Inch Drg No 25P, Adaptor Below Esp Hopper Between Kgv And Hopper For Fly Ash Hopper Hopper Diffuser And Adaptor, Gate Shaft With Key Spares For Nuva Feeder Diffuser Feeder-12Inch X 10 Inch, Gate Seat Spares For Nuva Feeder Diffuser Feeder 12Inchx 10Inch, Gate Seat For Fly Ash Diffuser Intake Valve 12 Inchx6 Inch Fly Ash Diffuser Intake Valve 12Inchx6inch, Fly Ash Header Valve Tersg 10 Inch Drg No-25P04-T-1B-040, Fly Ash Header Valve Tersg 8 Inch Drg No-25P04-T-1B040, Casing Body Part No-1 Body Shaft Side And Blind Side 25P04-T-1B-040, Seal Strip Part No 5 For Fly Ash Header Valve Tersg Fly Ash Header Valve Tersg10inch, Seal Strip Part No-5 For Fly Ash Header Valve Tersg Fly Ash Header Valve Tersg 8 Inch, Wear Section 600 Lg 250Nb Ms Is3589 Bb For Fly Ash Line Fitting, Sleeve Coupling Complete Assy For Fly Ash Line Ta Type 8 Inch, Shaft With Key For V Valve Spares For Vent And Euuilising Valves Size 4 Inch, 4 Vent Valve-2 Way Ac Operated Removable Valve Seat Flanged Connection But Without Air Cylinder And Limited Switch, Disc Gate 4 Inch Vent Valve For 4 Inch Vent And Equalising Valve, 10 X 45 Degree Impact Elbow, 250 Nb 90 Degree Aci Bend Hardness 400 Bhn Prt No Mb C 940 61490D R0, Tail Piece Of Wetting Head Part 3 Of Drg No 23Poi T-Ib-271, Material Alloy Cast Iron As Per Is 7925 Gr Ii Hardness- 400-450 Bhn, Wear Section 12 Inch Ms 800 Lg Bb For Fa Line For Fly Ash Line Fitting, Metallic Ss Expansion Joint Double Layer For Economiser Flushing Apparatus Size 200X200 Nb For Economiser Hopper, Coupling Assy 1 Inch Fly Ash Line Type B Or A For Fa Line Coupling And Fitting For Sleeve Coupling, Gate Disc Spares For Nuva Feeder Diffuser Feeder-12 Inch X 10 Inch, Crusher Rollcam Group Structures With Shaft And Shaft Sleeve
Supply Of Felt Lines Tray - Enamel Tray, Line Interactive Ups With Avr V2, Baby Tray, Industrial Safety Gloves - Leather And Cotton, Oil Tray, Resuscitation Crash Cart Console For Hospitals, Root Trainers Tray / Germination Tray Block Type, Computer Table, Cable Tray Bhel, Surgical Dressing Trays, Hacksaw Hand - Insulated Hacksaw Frame, Nitrile Coated Hand Gloves, Power Hacksaw Machine, Saw Blades Or Hacksaw Blades V2 As Per Is 2594, Tubular Hacksaw Frame, Hand Dryer V2, Non Sparking Hacksaw Blade Or Frame-Is:4595, Digital Multimeter As Per Is 9000, Hand Lamp, Hand Held Search Light, Files Flat Bastered - Endodontic Files, File Folder Cover V2, Dental Files, Hand Tufted Carpets As Per Is 5884, Index Card Files, Spring File, Files & Drills Setongc, Non Sparking Engineers Files, Box File, Flat Gym Bench, Nose Plier - Orthopedic Instruments - Nose Pliers, Surgical Isolation Or Surgical Masks, Pliers, Pincers And Nippers As Per Is 2615, Is 11526, Insulated Water Pump Plier, Groove Joint Pliers, Filtering Half Mask-Air Pollution Mask-Is 9473, Nose Rings & Pins-Handicraft, Surgical Isolation Faceshield, Orthodontic Pliers, Shovel Belcha As Per Is 274 Part 1, Part 2 And Part 3, Hammer Brass Small - Concrete Test Hammer Rebound Hammer, Copper Alloy Fancy Taps For Bathroom As Per Is 8931 Latest, Hammer Unions, Throwing Hammer - Athletics-Is 4385, Knee Hammer, Small Angle Grinders, Reflex Hammer, Plastic Button Thermosetting As Per Is 1461, Hammer Crusher, Cast Copper Alloy Screw Down Bib Taps And Stop Valves For Water Services As Per Is 781, Striker Needle F2 B 429 - Blood Lancets, Spinal Needles, Sterile Hypodermic Syringe V3, Continuous Plexus Anaesthesia Sets Anesthesia Nerve Block Trays Or Needles, Disposable Syringes As Per Is 10258, Combined Spinal Epidural Needle, Needle Holder Hegars Pattern As Per Is 10599, Trolleys Or Accessories, Sterile Hypodermic Syringe For Manual Use V2, Enamel, Synthetic, Exterior A Under Coating B Finishing Paint V3 Confirming To Is 2932, Transparent Tape - Transparent Tape V2, Petri Plates Or Dishes, Flexible Transparent Sheet, Transparent Plastic Sheetbhel, Serological Pipettes And Graduated Pipettes As Per Is 4364, Tape Drive, Measuring Tape, Tape Library, Elastic Surgical Adhesive Tapes V2, Pressure Sensitive Adhesive Plasticized Pvc Tapes With Nonthermosetting Adhesive As Per Is 7809 Part 3 / Section 1
Supply Of Body Seat Ring For Non Return Valve-Is:5312, Resilient Seated Cast Iron Air Relief Valves For Water Works Purposes, Resilient Seated Cart Iron Air Relief Valves For Water Works Purposes As Per Is:14845
procure “AIR DISTRIBUTION HEADER WITH ISOLATION VALVES” for its Plant located at Naya Nangal (Punjab), along with other units of NFL located at Bathinda (Punjab) and Panipat (Haryana).