Rewinding And Reconditioning Of Motors Pumps Alternators Of Generator Set Etc. On Rate Contract Basis For A Period Of Two Years
Supply of Lock Nut Km 12 For Kel Make 25 Kw Alternators Conforming To Is: 6731 Of 1977 Warra Nty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs
Supply, Erection, Testing And Commissioning Of Co2 Gas Flooding System Along With All Automation Accessories For 3X10.2 Mw Alternators At Matatila Power Station