Work Of Removal And Application Of Thermal Insulation With Aluminum Sheets On Various Pumps, Piping, Valves, Bends, Vessels Etc. And Spray Insulation On Turbines Of Tdbfps Of 500 Mw Unit No.6 Of Utps On €Œas And When Required†Basis.Tmd-6
Supply Of Aluminum Sheet To Wc, Batch Door Shutters For Protection Against Water Exposure To Residential Buildings
Installation Of Equipment At Qps At Ghuma - Well Manifold Connecting Tubing /Annulus, Gate Valve-2 Nos, Cast Steel 3 X 400 Class Nrv-2 Nos, 2, 3 & 4 Pipe, Breather Valve Flame Arrestor, Breather Valve Data Sheet, Complete Burner Management System With Flame Proof Panel Including Liquid Level Controller & Gas Detector System, Gas Intake Line & Installation Of Temperature Sensor, Gas Pressure Reducing System, Industrial Power Gas Burner, Flame Proof Panel With Temperature Controller, Side Mounted Low Level Switch System, Underground 4-Core X 4 Sq.Mm Copper Armored Cable, Orifice Based Digital Gas Flow Meter, 3 Core X 2.5 Sq. Mm Copper Arm Cable, Separator Platform, Underground Drain Pit, Gspc, Gspc Supplied Hot Water Circulation Line, Gspc Supplied Vertical Separator Along With Skid, Gspc Supplied Vertical Separator Along With Oil And Gas Flow Line System Including Instrumentation System, Thermal Insulation With 75 Mm Thick Glass Wool & Aluminum Sheet Cladding On Hot Water Piping Of 2 -7/8 Inch, Earthing Pits, Digital Gas Flow Meter, Digital Gas Detector Hooter Cum Flasher