Attending Fault And Amc Of 1 No. 13 Passenger Lift In Te Harbour,
Custom Bid For Services - Annual Maintenance Contract Amc Of Lift Installed At Salal Power Station For Two Years
Supply Articulating Boom Lift Drass, Supply Articulating Boom Lift Kargil, Supply Articulating Boom Lift Khasti, Supply Articulating Boom Lift Leh, Amc 1St Year Drass, Amc 2Nd Year Drass, Amc 3Rd Year Drass, Amc 4Th Year Drass, Amc 5Th Year Drass, Amc 1St Year Kargil, Amc 2Nd Year Kargil, Amc 3Rd Year Kargil, Amc 4Th Year Kargil, Amc 5Th Year Kargil, Amc 1St Year Khalsti, Amc 2Nd Year Khalsti, Amc 3Rd Year Khalsti, Amc 4Th Year Khalsti, Amc 5Th Year Khalsti, Amc 1St Year Leh, Amc 2Nd Year Leh, Amc 3Rd Year Leh, Amc 4Th Year Leh, Amc 5Th Year Leh
Comprehensive Amc Of Lifts Make:Techno Industries Installed In Staff Colony For 3 Years At Rail Wheel Plant Dist: Saran Bihar
Amc For Four Nos Lifts Phase-I At Type-Ii And Type -Iii Sf Accn At Dwarka
Supply of Prototype Telescopic Boom Crane Complete With Match Truck/Wagon And All Accessories Such As Lifting Beam Of 120 T Capacity And Light Weight Polyester Slings, Steel Wire Ropes, Chains & Tools Scope As Per Clause 1.2.3 Of Rdso Specification, As Detailed At Clause 3.1.1, 3.2 & 3.5 Respectively Of Rdso Specification Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. List Of Items With Their Individual Costs To Be Enclosed In The Price Bid Warranty Period: 78 Months After The Date Of Delivery Cost Of Preventive Maintenance Charges For Bm1 During Warranty Period As Per Clause 3.11 Of Rdso Specification And Clause 15 Of S Ection 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Bm1for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Section V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Manufactured / Assembled Telescopic Boom Cranes Complete With Match Truck. Wagon And All Accessories Such As Lifting Beam Of 120 T Cap. And Light Weight Polyester Slings, Steel Wire Ropes, Chains & Tools Scope As Per Clause 1.2.3 Of Rdso Specification, As Detailed At C Lause 3.1.1, 3.2 & 3.5 Respectively Of Rdso Specification Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential T O Make The Crane Fully Operational. List Of Items As Per Cl. 1.2.3 Of Rdso Specification, Assemblies/ Sub-Assemblies For Fabricated Goods With Their In Dividual Costs To Be Enclosed In The Price Bid Warranty Period: 78 Months After The Date Of Delivery Cost Of Preventive Maintenance Charges For Bm2 During Warranty Period As Per Clause 3.11 Of Rdso Specification And Clause 15 Of S Ection 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Bm2 For A Period Of 5 Years After Warranty Period As Per Clause 16 Of Section V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Special Lifting Beam Of Min. 175 T Capacity Along With Slings, Scope Of Supply As Per Clause 1.2.3 Ii, As Detailed At Clause 3.1.2 Of Rd So Specification Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. Warr Anty Period: 78 Months After The Date Of Delivery Tunnel Fork Attachment Mountable To Telescopic Jib, Scope Of Supply As Per Clause 1.2.3 Iii, As Detailed At Clause 3.3 Of Rdso Specif Ication Inclusive Of Any Other Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. Warranty Peri Od: 78 Months After The Date Of Delivery Cost Of Preventive Maintenance Charges For Special Lifting Beam Esp1 During Warranty Period As Per Clause 3.11 Of Rdso Specifica Tion And Clause 15 Of Section 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Special Lifting Beam Esp1for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Section V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Cost Of Preventive Maintenance Charges For Tunnel Fork Attachment Esp2 During Warranty Period As Per Clause 3.11 Of Rdso Spe Cification And Clause 15 Of Section 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Tunnel Fork Attachment Esp2for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Secti On V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Crane Training Simulator, Scope Of Supply As Per Clause 1.2.3 Iv, As Detailed At Clause 3.4 Of Rdso Specification Inclusive Of Any Othe R Accessory/ Equipment, Which The Manufacturer Considers Essential To Make The Crane Fully Operational. Warranty Period: 78 Months After The Dat E Of Delivery Cost Of Preventive Maintenance Charges For Crane Training Simulator Esp3 During Warranty Period As Per Clause 3.11 Of Rdso Spe Cification And Clause 15 Of Section 5 Of Bid Document Part-Ii Cost Of Comprehensive Amc For Crane Training Simulator Esp3for A Period Of 5 Years After Warranty Period As Per Clause 16 Of Sect Ion V Of Bid Document Part Ii Warranty Period: 6 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Cost Of Training At Manufacturers Works Ref. Clause 4.7.1 Of Rdso Specificationfor 800 Man Days Cost Of Training At Designated Place In India Ref. 4.7.3 Of Rdso Specification For 2000 Man Days
Rmo E And M Services At Nvs B-15 Sector 62 Noida Up Sh Comprehensive Amc Of 05 Nos Johnson Make Lifts