Installed At 2X210mw Ghtp Routine, Preventive, Breakdown, Shutdown Maintenance Of Ci Equipments, Instruments, Measurement Interlock System, Annunciation System, Flue Gas Analyzers, Steam Water Analysis System Etc.
Assessment Of Fatigue Load At 09 Nos. Major Bridges Br. No. 44Up, 73Up, 32Up, 3Up, 40Up, 59Dn, 209, 293Dn & 270Dn By Doing Instrumentation And Rem Analysis As Per Relevent Railway Codes.
Instrumentation And Condition Monitoring Of Bridge No 138 Up And 198 Up Of Rewari-Jaipur Section Of Nwr For Continuing Lwr, Based On Rail Structure Interaction Rsi Analysis.