Construction Of Railway Portion Of Two Lane Road Over Bridge 1 X 60.00M Bow String Arch Steel Girder At Km. 63/09 - 10 In Lieu Of Level Crossing No. 45 In Indore - Dewas Section, Between Barlai - Mangliyagaon Stations
Widening Of Bridge No. 39 From Existing Arch Bridge Of 4 Width To Rcc Box Of 3M X 2.5M Or As Per Final Design By Cut And Cover Method And Construction Of Bypass Spillover Rcc Drain Of Approximate Dimension 2.5M X 1.0M X 200M. In The Section Of Sse/W/Hw Under Aden/Hw. Estt. No. 23/2024 Rrsk